8.1
Summary of exceedance is provided in Appendix L.
8.2
No Action/Limit Level exceedance was recorded for air quality and
construction noise.
8.3
All water quality monitoring was conducted as scheduled in the reporting
month. There are three Action Level and no Limit Level exceedances were
recorded for suspended solids. No Action/Limit Level exceedance for dissolved
oxygen and turbidity were recorded.
8.4
According to the investigation, the exceedances are considered not due
to the Contract due to the following reasons:
1)
No major marine construction activity was conducted;
2)
No pollution discharge from construction activity was observed; and
3)
Dispersion of sediment plume to the monitoring stations from the area
outside the site boundary (i.e. works area not under and related to HY/2011/09)
was observed.
Summary of Environmental Complaint
8.5
No environmental related complaints were received in the reporting month.
The Complaint Log is attached in Appendix
P.
8.6
There was one prosecution or notification of summons received since the Contract
commencement. Summary of successful prosecution as attached in Appendix Q.