8.1
Summary of exceedance is provided in Appendix L.
8.2
No Action/Limit Level exceedance was recorded for air quality and
construction noise.
8.3
All water quality monitoring was conducted as scheduled in the reporting
month. There are twenty eight Action Level and three Limit Level exceedances
were recorded for dissolved oxygen. There are one Action Level and two Limit
Level exceedances were recorded for suspended solids. No Action/Limit Level exceedance
for and turbidity was recorded.
8.4
According to the investigation, the exceedances are considered not due
to the Contract due to the following reasons:
1)
No major marine construction activity was conducted;
2)
No pollution discharge from construction activity was observed;
3)
Control Station value already exceeded/very close to the Baseline Action
Levels;
4)
Monitoring Station is situated at the upstream of the construction
sites;
5)
Sediment plume due to natural fluctuation of shallow water was observed;
and
6) Dispersion of sediment plume to
the monitoring stations from the area outside the site boundary (i.e. works
area not under and related to HY/2011/09) was observed.
Summary of Environmental Complaint
8.5
No environmental related complaints were received in the reporting month.
The Complaint Log is attached in Appendix
P.
8.6
There was one prosecution or notification of summons received since the Contract
commencement. Summary of successful prosecution as attached in Appendix Q.