8               ENVIRONMENTAL NON-CONFORMANCE (EXCEEDANCES)

Summary of Exceedances

 

8.1         Summary of exceedance is provided in Appendix L.

8.2         No Action/Limit Level exceedance was recorded for air quality and construction noise.

8.3         All water quality monitoring was conducted as scheduled in the reporting month. There are three Action Level exceedances were recorded for suspended solids. No Action/Limit Level exceedance for dissolved oxygen and turbidity were recorded.

8.4         According to the investigation, the exceedances are considered not due to the Contract due to the following reasons:

1)      No major marine construction activity was conducted;

2)      No pollution discharge from construction activity was observed; 

3)      Sediment plume due to natural fluctuation of shallow water was observed; and

4)      Localized sediment plume due to the rough water condition was observed.

 

Summary of Environmental Complaint

 

8.5         No environmental related complaints were received in the reporting month. The Complaint Log is attached in Appendix P.

Summary of Notification of Summons and Successful Prosecution

8.6         There was one prosecution or notification of summons received since the Contract commencement. Summary of successful prosecution as attached in Appendix Q.