Table I Summary
Table for Monitoring Activities in the Reporting Month
Parameter(s) |
Date(s) |
1-hr
TSP Monitoring |
3rd,
7th, 13th, [1]19th, [1]20th,
24th and 28th September 2018 |
24-hr
TSP Monitoring |
3rd,
7th, 13th, [1]19th, [1]20th,
24th and [2]28th September 2018 |
Noise
Monitoring |
5th,
11th, 20th and 26th September 2018 |
Water
Quality Monitoring |
1st,
4th, 6th, 8th, 10th, [3]12th,
14th, [4]17th, 19th, 21st,
25th, 27th and 29th September 2018 |
5th
and 11th September 2018 |
|
Environmental
Site Inspection |
4th,
11th, 18th and 26th September 2018 |
Archaeological
Site Inspection |
18th
September 2018 |
[1] 1hr & 24 hr TSP at AMS1 on 19th
September 2018 was cancelled due to the power supply and rescheduled to 20th
September 2018.
[2] 24 hr
TSP at AMS1 on 28th September 2018 was cancelled due to the power
supply and rescheduled to 2 October 2018.
[3] Water quality
monitoring (Mid-Ebb) on 12th September 2018 was cancelled due to
adverse weather (Strong Wind Signal No.3)
[4] Water quality
monitoring on 17th September 2018 was cancelled due to adverse
weather (Strong Wind Signal No.3)