1.1
Cinotech Consultants Limited (Cinotech) was
appointed by Dragages -China Harbour-VSL JV (hereinafter called
“the Contractor”) as the Environmental Team (ET) to undertake the
Environmental Monitoring and Audit (EM&A) programme during construction
phase of the Contract No. HY/2011/09 – Hong Kong-Zhuhai-Macao Bridge Hong Kong
Link Road – Section between HKSAR Boundary and Scenic Hill” (hereinafter called the “Contract”) in
accordance with EP Conditions 2.1.
1.2
This is the 69th EM&A report which
summarises the impact monitoring results and audit findings for the EM&A
programme in October 2018.
1.3
The structure of the report is as follows:
Section 1: Introduction
- purpose and structure of the report.
Section 2: Contract
Information - summarises background and scope of the Contract, site
description, project organization and contact details, construction programme,
the construction works undertaken and the status of Environmental
Permits/Licenses during the reporting month.
Section 3: Air
Quality Monitoring - summarises the monitoring parameters, monitoring
programmes, monitoring methodologies, monitoring frequency, monitoring
locations, Action and Limit Levels, monitoring results and Event / Action
Plans.
Section 4: Noise
Monitoring - summarises the monitoring parameters, monitoring programmes,
monitoring methodologies, monitoring frequency, monitoring locations, Action
and Limit Levels, monitoring results and Event / Action Plans.
Section 5: Water
Quality Monitoring - summarises the monitoring parameters, monitoring
programmes, monitoring methodologies, monitoring frequency, monitoring
locations, Action and Limit Levels, monitoring results and Event / Action
Plans.
Section 6: Dolphin-Related
Monitoring - summarises the monitoring parameters, monitoring programmes,
monitoring methodologies, monitoring frequency, monitoring locations and
monitoring results.
Section 7: Environmental
Site Inspection - summarises the audit findings of the weekly site
inspections undertaken within the reporting month.
Section 8: Environmental
Non-conformance - summarises any monitoring exceedance, environmental
complaints, environmental summons and successful prosecutions within the
reporting month.
Section 9: Future Key Issues - summarises the
impact forecast and monitoring schedule for the next three months.
Section 10: Conclusions and Recommendation