8.1
Summary of exceedance is provided in Appendix L.
8.2
No Action/Limit Level exceedance was recorded for construction noise.
8.3
All 1-hour TSP monitoring
was conducted as scheduled in the reporting month. No Action/Limit Level
exceedances were recorded.
8.4
All 24-hour TSP monitoring was conducted as scheduled in the reporting
month. No Action/Limit Level exceedances were recorded.
8.5
All water quality monitoring was conducted as scheduled in the reporting
month. No Action/Limit Level exceedance for dissolved oxygen, turbidity and
suspended solids were recorded.
Summary of Environmental Complaint
8.6
No environmental related complaints were received in the reporting
month. The Complaint Log is attached in Appendix
P.
8.7
There was one prosecution or notification of summons received since the
Contract commencement. Summary of successful prosecution as attached in Appendix Q.