EXECUTIVE SUMMARY

Introduction

1.              This is the 70th monthly Environmental Monitoring and Audit (EM&A) Report prepared by Cinotech Consultants Limited for the project ¡§Contract No. HY/2011/09 ¡V Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road ¡V Section between HKSAR Boundary and Scenic Hill¡¨ (hereinafter called the ¡§Contract¡¨). This report documents the findings of EM&A Works (Construction Phase) conducted in November 2018.

Environmental Monitoring and Audit Progress

2.             As the Construction Phase EM&A Programme under HY/2011/09 have been terminated since 24th October 2018 as per EPD¡¦s letter to SOR (EPD¡¦s ref.: ¡§( ) in AX(2) to EP771/E1/099¡¨ dated 30 November 2018), no impact monitoring (air quality, construction noise, water quality and dolphin) and weekly site audit was carried out in the reporting month.

Complaint Log

 

3.              No environmental complaint was received in the reporting month.

Notification of Summons and Successful Prosecutions

 

4.              No notification of summons and successful prosecution was received in the reporting month.

Reporting Changes

 

5.              This report has been developed in compliance with the reporting requirements for the subsequent monthly EM&A Report as required by the EM&A Manual for Hong Kong Link Road (EM&A Manual).

Future Key Issues

6.              Major site activities for the coming reporting month will include:

Portion A

¡P             Reinstatement of South Perimeter Road (P81-P83)

 

Portion C

¡P             Reinstatement Works

 

Pier 115 & Pier 114 Interface Area

¡P             Reinstatement of Slope and drainage works