10.1
The Environmental Monitoring
and Audit (EM&A) Report presents the EM&A works undertaken in November 2018 in accordance with EM&A Manual.
10.2
Hong Kong-Zhuhai-Macao Bridge
Hong Kong Link Road (HKLR) has been commissioned on 24 October 2018. As the
Construction Phase EM&A Programme under
HY/2011/09 have been terminated since 24th October 2018 as per EPD’s letter to
SOR (EPD’s ref.: “( ) in AX(2) to EP771/E1/099” dated 30 November 2018), no
impact monitoring (air quality, construction noise, water quality and dolphin)
and weekly site audit was carried out in the reporting month.
10.3 As no impact monitoring was
carried out in the reporting month, no exceedance in air quality, noise water
quality and dolphin was recorded.
10.4 Post-construction monitoring for
water quality and dolphin were carried out after the termination of
Construction Phase EM&A Programme.