10         CONCLUSIONS

 

10.1     The Environmental Monitoring and Audit (EM&A) Report presents the EM&A works undertaken in November 2018 in accordance with EM&A Manual.

 

10.2     Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road (HKLR) has been commissioned on 24 October 2018. As the Construction Phase EM&A Programme under HY/2011/09 have been terminated since 24th October 2018 as per EPD’s letter to SOR (EPD’s ref.: “( ) in AX(2) to EP771/E1/099” dated 30 November 2018), no impact monitoring (air quality, construction noise, water quality and dolphin) and weekly site audit was carried out in the reporting month.

 

10.3     As no impact monitoring was carried out in the reporting month, no exceedance in air quality, noise water quality and dolphin was recorded.

 

10.4     Post-construction monitoring for water quality and dolphin were carried out after the termination of Construction Phase EM&A Programme.