Contract No. HY/2011/09
Hong Kong-Zhuhai-Macao
Bridge Hong Kong Link Road ¨C
Section between HKSAR
Boundary and Scenic Hill
Exceedance
Report
(A) Exceedance
Report for Air Quality (1 hour TSP)
(NIL in the reporting period)
(B) Exceedance
Report for Air Quality (24 hours TSP)
(NIL in the reporting period)
(C) Exceedance
Report for Construction Noise
Parameter |
No. of Exceedance |
No.
of Exceedance related to the Construction
Activities of this Contract |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
|
Noise |
*1 |
0 |
1 |
0 |
Remark:
* One Action Level exceedance was recorded as one documented
complaint
was received in the period of 0700-1900 hrs on normal weekdays
in the reporting period
(D)
Exceedance Report for Water Quality
Environmental Monitoring |
Parameter |
No. of Exceedance |
No.
of Exceedance related to the Construction
Activities of this Contract |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
||
Water Quality |
Dissolved Oxygen (DO)
(Surface & Middle) |
7 |
6 |
0 |
0 |
Dissolved Oxygen (DO)
(Bottom) |
10 |
0 |
0 |
0 |
|
Turbidity |
30 |
101 |
0 |
0 |
|
Suspended Solids (SS) |
22 |
92 |
0 |
0 |
(E) Exceedance
Report for Underwater Construction Noise
(NIL in the
reporting period)