EXECUTIVE SUMMARY

Introduction

1.              This is the 1st Quarterly Environmental Monitoring and Audit (EM&A) Report prepared by Cinotech Consultants Limited for the project “Contract No. HY/2011/09 – Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road – Section between HKSAR Boundary and Scenic Hill” (hereinafter called the “Contract”). This report documents the findings of EM&A Works performed in the period between 22nd February and 31st May 2013.

Environmental Monitoring and Audit Progress

2.              A summary of the monitoring activities in this reporting period is listed in Table I below:

Table I            Summary Table for Monitoring Activities in the Reporting Period

 

Parameter(s)

Monitoring Date(s)

1-hr TSP Monitoring

22nd and 28th February 2013

6th, 12th, 18th, 22nd and 27th March 2013

2nd, 8th, 12th, 18th, 24th and 30th April 2013

6th, 10th, 16th, 22nd and 28th May 2013

24-hr TSP Monitoring

Noise Monitoring

23rd February 2013

1st, 7th, 13th, 19th, 23rd and 28th March 2013

3rd, 9th, 15th and 25th April 2013

2nd, 7th, 13th, 23rd and 29th May 2013

Water Quality Monitoring

22nd, 25th and 27th February 2013

1st, 4th, 6th, 8th, 11th, 13th, 15th, 18th, 20th, 23rd, 25th, 27th and 29th March 2013

1st, 3rd, 5th, 8th, 10th, 12th, 15th, 17th, 19th, 22th, 24th, 26th and 29th April 2013

2nd, 4th, 6th, 8th, 10th, 13th, 15th, 18th, 20th, 22th, 24th, 27th, 29th  and 31st May 2013

Dolphin Monitoring (Line-transect Vessel Surveys)

19th and 25th February 2013

8th and 22th March 2013

9th and 17th April 2013

6th and 14th May 2013

(1)Construction-phase underwater Noise Monitoring

With Bored Piling Activities:

18th, 19th, 20th, 21st, 22nd, 23rd, 25th, 27th, 28th March 2013

2nd, 3rd, 5th, 8th, 9th, 10th, 25th, 26th, 27th, 29th and 30th  April 2013

Without Bored Piling Activities:

13th, 14th, 15th and 26th March 2013

11th April 2013

(1) Dolphin Behaviour Monitoring

With Bored Piling Activities:

18th, 19th, 20th, 21st, 22nd, 23rd, 25th, 27th, 28th and 29th March 2013

1st, 2nd, 3rd, 5th, 7th, 8th, 10th and 11th April 2013

Without Bored Piling Activities:

6th, 7th, 8th, 9th, 11th to 17th, 24th and 30th March 2013

(1)Land-based Dolphin Behaviour and Movement Monitoring

With Bored Piling Activities:

18th, 19th, 20th, 21st, 22nd, 23rd, 25th, 27th, 28th March 2013

1st, 2nd, 4th, 5th, 7th, 8th, 9th, 10th and 11th April 2013

Without Bored Piling Activities:

6th, 7th, 9th to 17th, 24th and 30th March 2013

Environmental Site Inspection

26th February 2013

5th, 12th, 19th and 26th March 2013

2nd, 9th, 16th, 26th and 30th April 2013

7th, 14th, 21st and 31st May 2013

Archaeological Site Inspection

25th March 2013

Remark:     (1) Dolphin-related monitoring was conducted in the reporting period. According to the EM&A Manual for HKLR, the dolphin-related monitoring was conducted during the bored piling activities (e.g. installation of permanent casting for bored piling activities) which presented in Appendix A.  The dolphin-related monitoring conducted without bored piling activities are for reference only. In addition, no monitoring was conducted in May 2013 as no underwater sockets into rock can be carried out for marine bored piles in West Lantau in May and June in accordance with EP Condition 3.1.


Breaches of Action and Limit Levels

3.              Summary of the environmental exceedances of the reporting period is tabulated in Table II.

Table II          Summary Table for Events Recorded in the Reporting Period

 

Environmental Monitoring

Parameter

No. of Exceedance

No. of Exceedance related to the Construction Activities of this Contract

Action Level

Limit Level

Action Level

Limit Level

Air Quality

1-hr TSP

0

0

0

0

24-hr TSP

0

0

0

0

Noise

Leq(30min)

1

0

1

0

Water Quality

Dissolved Oxygen (DO) (Surface & Middle)

7

6

0

0

Dissolved Oxygen (DO) (Bottom)

10

0

0

0

Turbidity

30

101

0

0

Suspended Solids (SS)

22

92

0

0

Underwater Noise

RMS sound pressure level re 1µPa

0

0

0

0

Dolphin Monitoring

Line-transect Vessel Surveys

0

0

0

0

 

4.              Environmental monitoring works were performed in the reporting period and all monitoring results were checked and reviewed.  The details of each exceedance were attached in the Monthly EM&A Reports.

Complaint Log

 

5.              Summary of the environmental complaints of the reporting period is tabulated in Table III.

Table III         Summary Table for Complaints Recorded in the Reporting Period

Complaint Log Ref.

Location

Received Date

Nature of Complaint

Com-2013-04-001

Near Tung Chung New Development Pier

8 April 2013

Water Quality

Com-2013-05-001

WA6

2 May 2013

Noise

Com-2013-05-002

WA6

18 May 2013

Noise

Com-2013-05-003

Near Tung Chung New Development Pier

18 May 2013

Water Quality

Notification of Summons and Successful Prosecutions

 

6.              No notification of summons and successful prosecution was received in the reporting period.

Reporting Changes

 

7.              This report has been developed in compliance with the reporting requirements for the quarterly EM&A Summary Report as required by the EM&A Manual for Hong Kong Link Road (EM&A Manual).

Future Key Issues

8.              Major site activities for the coming reporting month will include:

WA4

Ÿ   Fabrication of rebar cages

Ÿ   Loading and unloading

Ÿ   Setup of casting yard

WA7

Ÿ   Preparation for bored piling

Ÿ   Fabrication of rebar cages

Ÿ   Loading and Unloading

Ÿ    

Portion A (Land Section)

Ÿ   Site clearance and  formation

Ÿ   Timber Scaffolding

Ÿ   Pre-drilling work

Ÿ   Set-up facilities for marine delivery of concrete from land plants

Ÿ   Slewing of the tele‐communication & AA COM cables

Portion C

Ÿ   Satellite site office set up

Ÿ   Pre-drilling work

Ÿ   Protection work to the fuel pipes

Ÿ   Fabrication of reinforcement cage and piling jacket, setting up for land piling work

 

Western Water

Ÿ   Pre-drilling Work

Ÿ   Loading and Unloading

Ÿ   Setting up of silt-curtain

Ÿ   Platform installation for pre‐drilling works

Ÿ   Installation of temporary casings for the piling platform

Ÿ   Installation of permanent casing

Ÿ   Bored piling works