5               ENVIRONMENTAL NON-CONFORMANCE (EXCEEDANCES)

Summary of Exceedances

 

5.1         Summary of exceedance is provided in Appendix K. The details of the exceedances were attached in the Monthly EM&A Report.

Air Quality

5.2         No Action/Limit Level exceedance was recorded in the reporting period.

Noise

5.3         One Action Level exceedance was recorded for noise in the reporting period as one documented complaint was received to complaint the noise nuisance due to loading of metal parts at barge near the seawall of Works Area WA6 early morning (around 8:45a.m) on 18 May 2013 (Saturday) in the reporting month.

5.4         Based on the record of site activities at WA6 on 18 May 2013, 4 metal plates and 2 oxygen-acetylene set were lifted onto a derrick boat “Chiu Kee” by a crane near seawall at WA6 in the morning on that day. Such operation was commenced around 8:40a.m and completed in 10 minutes during the normal construction working hour (0700 – 1900 Monday to Saturday). However, the duration of aforesaid activities is very short and infrequent. Nevertheless, the Contractor was reminded to strengthen their site supervision and provide training for the workers regularly to increase awareness of their environmental responsibilities to minimize the noise impact to the nearby residents and the specific mitigation measures for the complaint including but not limited to:-

•To place wooden planks or rubber mats on ground for loading and unloading heavy or metal objects; and

•To deploy professional personnel to supervise the works.

5.5         No Limit Level exceedance was recorded for noise.

Water Quality

5.6         There are 17 Action Level exceedances and 6 Limit Level exceedances were recorded for dissolved oxygen. 30 Action Level exceedances and 101 Limit Level exceedances for turbidity were recorded. 22 Action exceedances and 92 Limit Level exceedances for suspended solids were recorded.

5.7         According to the investigation, no major marine construction activities were conducted during the monitoring period between 22 February and 19 March 2013. No pollution discharge from the marine works and sediment plume due to natural fluctuation of shallow water were observed. Therefore, all exceedances are considered not due to the Contract.

Construction-phase Underwater Noise Monitoring

5.8         No Action/Limit Level exceedance was recorded in the reporting period.

Dolphin Monitoring (Line-transect Vessel Survey)

5.9         No Action/Limit Level exceedance was recorded in the reporting period.


Summary of Environmental Complaint

5.10     Four environmental related complaints were received in the reporting period. The Complaint Log is attached in Appendix L. All investigation reports for complaint of the Contract have been submitted to summarize the investigation results.  The summary of environmental complaints is presented in Table 5.1. 

 

Table 5.1              Summary of Environmental Complaints in the Reporting Period

Complaint Log Ref.

Location

Received Date

Nature of Complaint

Com-2013-04-001

Near Tung Chung New Development Pier

8 April 2013

Water Quality

Com-2013-05-001

WA6

2 May 2013

Noise

Com-2013-05-002

WA6

18 May 2013

Noise

Com-2013-05-003

Near Tung Chung New Development Pier

18 May 2013

Water Quality

Summary of Notification of Summons and Successful Prosecution

5.11     There was no prosecution or notification of summons received since the Contract commencement.