5.1
Summary
of exceedance is provided in Appendix K. The details of the exceedances
were attached in the Monthly EM&A Report.
Air Quality
5.2
No
Action/Limit Level exceedance was recorded in the
reporting period.
Noise
5.3
No
Action/Limit Level exceedance was recorded in the
reporting period.
Water
Quality
5.4
There
are 4 Action Level exceedances and 3 Limit Level exceedances were recorded for suspended solids.
5.5
According
to the investigation, no pollution discharge from the marine works and no exceedances were recorded at the impact stations (i.e. IS1
to IS4) which are close to construction site. In addition, sediment plume due
to natural fluctuation of shallow water was observed and water quality
mitigation measures such as casing and silt curtains were properly implemented.
Therefore, all exceedances are considered not due to
the Contract.
Construction-phase
Underwater Noise Monitoring
5.6
No
Action/Limit Level exceedance was recorded in the
reporting period.
Dolphin
Monitoring (Line-transect Vessel Survey)
5.7
No
Action/Limit Level exceedance was recorded in the
reporting period.
5.8 One environmental related complaint was received in the reporting period. The Complaint Log is attached in Appendix L. All investigation reports for complaint of the Contract have been submitted to summarize the investigation results. The summary of environmental complaints is presented in Table 5.1.
Table 5.1
Summary of Environmental
Complaints in the Reporting Period
Complaint Log Ref. |
Location |
Received Date |
Nature of Complaint |
Com-2013-07-001 |
Southeast Quay of Chek Lap Kok near the junction
of Chek Lap Kok South
Road and Scenic Road |
17 July 2013 |
Noise |
5.9
There
was no prosecution or notification of summons received since the Contract
commencement.