Table I Summary Table for Monitoring Activities in the Reporting Period
Parameter(s) |
Monitoring Date(s) |
1-hr TSP Monitoring |
4th, 10th,
16th, 21st and 27th September 2013 3rd, 9th,
15th, 21st, 25th and 31st October
2013 6th, 12th,
18th, 22nd and 28th November 2013 |
24-hr TSP Monitoring |
|
Noise Monitoring |
5th, 11th
, 17th, 23rd and 30th September 2013 10th, 16th
, 22nd and 28th
October 2013 7th, 13th
, 19th and 25th
November 2013 |
Water Quality Monitoring |
2nd, 4th,
6th, 9th, 11th, 14th, 16th,
18th, 21st, 23rd, 25th , 28th
and 30th September 2013 2nd, 4th,
7th, 9th, 11th, 15th, 17th,
19th, 21st, 23rd, 25th , 28th
and 30th October 2013 1st, 4th,
6th, 8th, 11th, 13th, 15th,
18th, 20th, 22nd, 26th , 28th
and 30th November 2013 |
11th and 19th
September 2013 9th and 18th
October 2013 6th and 15th
November 2013 |
|
(1)(2)Land-based Dolphin Behaviour
and Movement Monitoring |
28th and 30th
September 2013 |
Environmental Site Inspection |
3rd, 10th,
17th and 27th September 2013 2nd, 7th,
16th, 22nd and 29th October 2013 5th, 12th,
19th and 29th
November 2013 |
Archaeological Site Inspection |
10th September 2013 |
Remark: (1)
Detailed
monitoring methodology and results will be provided in a separate report after
the completion of full set of additional land-based dolphin behavior
and movement monitoring.
(2) No additional land-based dolphin behavior and
movement monitoring was conducted in October and November 2013. In view of the
construction activities have no significant change, the monitoring in October,
November and December 2013 will be considered/reviewed
in the monthly EM&A report for November and December 2013 respectively.