5               ENVIRONMENTAL NON-CONFORMANCE (EXCEEDANCES)

Summary of Exceedances

 

5.1         Summary of exceedance is provided in Appendix K. The details of the exceedances were attached in the Monthly EM&A Report.

Air Quality

5.2         For 1-hour TSP monitoring, no Action/Limit Level exceedance was recorded in the reporting period.

5.3         For 24-hr TSP monitoring, no Action/Limit Level exceedance was recorded in the reporting period.

Noise

5.4         No Action/Limit Level exceedance was recorded in the reporting period.

Water Quality

5.5         There are 24 Action Level exceedances and 6 Limit Level exceedances were recorded for suspended solids. 6 Action Level exceedance and 1 Limit Level exceedances for turbidity were recorded in the reporting period.

5.6         According to the investigation, the exceedances are considered not due to the Contract due to the following reasons:

1)      No pollution discharge was observed from the site;

2)      Sediment plume due to natural fluctuation of shallow water and movement of vessel in the monitoring area; and

3)      The exceeded results were similar or within the ranges baseline monitoring results.

 

Dolphin Monitoring (Line-transect Vessel Survey)

5.7         No Action/Limit Level exceedance was recorded in the reporting period.

Summary of Environmental Complaint

 

5.8         Six environmental related complaints were received in the reporting period. The Complaint Log is attached in Appendix L. All investigation reports for complaint of the Contract have been submitted to summarize the investigation results.  The summary of environmental complaints is presented in Table 5.1. 


 

Table 5.1              Summary of Environmental Complaints in the Reporting Period

Complaint Log Ref.

Location

Received Date

Nature of Complaint

Com-2014-03-001

Near Sha Lo Wan

5 March 2014

Chemical / Waste Management

Com-2014-03-002

In the vicinity of the waters outside Sha Lo Wan

11 March 2014

Noise

Com-2014-04-001

Construction marine works by the company Bauer Hong Kong in Tung Chung

14 April 2014

Ecology

Com-2014-05-001

At the shore of Sha Lo Wan

13 May 2014

Ecology

Com-2014-05-002

At the shore of Sha Lo Wan

27 May 2014

Ecology

Com-2014-05-003

Pier 39 to 50

29 May 2014

Water Quality and Waste Management

 

Summary of Notification of Summons and Successful Prosecution

 

5.9         There was no prosecution or notification of summons received since the Contract commencement.