Table 3.2c Action and Limit Levels for
Construction Noise
Time Period |
Action Level |
Limit Level |
0700-1900
hrs on normal weekdays |
When one documented
complaint is received |
75 dB(A) * |
Noted: If works are to be carried during restricted hours, the
conditions stipulated in the construction noise permit issued by the Noise
Control Authority have to be followed.
(*) reduce
to 70 dB(A) for schools and 65 dB(A) during school
examination periods.