5.1
Summary of exceedance is
provided in Appendix K. The details
of the exceedances were attached in the Monthly
EM&A Report.
Air Quality
5.2
For 1-hour TSP
monitoring, no Action/Limit Level exceedance
was recorded in the reporting period.
5.3
For 24-hr TSP monitoring, no Action/Limit Level exceedance was recorded
in the reporting period.
Noise
5.4
No Action/Limit Level exceedance
was recorded in the reporting period.
Water Quality
5.5
There are 12 Action Level exceedances
and 2 Limit Level exceedances were recorded for
suspended solids. No Action/Limit Level exceedance for turbidity were recorded in the reporting
period.
5.6
According to the investigation, the exceedances are considered not due to the Contract due to
the following reasons:
1) No
pollution discharge was observed from the site;
2) No marine
construction works were conducted in vicinity of monitoring station in which exceedance was recorded;
3) Sediment
plume due to natural fluctuation of shallow water was observed; and
4) The exceeded results were similar or within the ranges baseline
monitoring results.
Dolphin Monitoring (Line-transect Vessel Survey)
5.7
No Action/Limit Level exceedance
was recorded in the reporting period.
5.8
One environmental related complaint was received in
the reporting period. The Complaint Log is attached in Appendix L. All investigation reports for complaint of the Contract
have been submitted to summarize the investigation results. The summary of environmental complaints
is presented in Table 5.1.
Table
5.1
Summary
of Environmental Complaints in the Reporting Period
Complaint Log Ref. |
Location |
Received Date |
Nature of Complaint |
Com-2014-08-001 |
Near Sha Lo Wan |
27 August 2014 |
Air Quality |
5.9
There was no prosecution or notification of summons
received since the Contract commencement.