5               ENVIRONMENTAL NON-CONFORMANCE (EXCEEDANCES)

Summary of Exceedances

 

5.1         Summary of exceedance is provided in Appendix K. The details of the exceedances were attached in the Monthly EM&A Report.

Air Quality

5.2         For 1-hour TSP monitoring, no Action/Limit Level exceedance was recorded in the reporting period.

5.3         For 24-hr TSP monitoring, no Limit Level exceedance was recorded. One Action Level exceedance was recorded at AMS1 on 11 February 2015.

5.4         According to the investigation, no dust generation works was conducted at near the monitoring station during the monitoring and observable dust source from construction activity under Contract No. HY/2011/09. In addition, high and very high Air Quality Health Index (AQHI) was recorded during the monitoring period according to EPD. Therefore, the exceedance is considered not due to the Contract.

Noise

5.5         No Action/Limit Level exceedance was recorded in the reporting period.

Water Quality

5.6         There are 10 Action Level exceedances and 6 Limit Level exceedances were recorded for suspended solids. No Action/Limit Level exceedance for turbidity were recorded in the reporting period.

5.7         According to the investigation, the exceedances are considered not due to the Contract due to the following reasons:

1)      No pollution discharge was observed from the site;

2)      Sediment plume which is considered due to the movement of vessel was observed but no direct evidence to show the vessel was belonged to HY/ 2011/09;

3)      Dispersion of sediment plume to the monitoring stations from the area outside the site boundary (i.e. works area not under and related to HY/2011/09) was observed;

4)      Adverse water quality outside the site boundary;

5)      Sediment plume due to natural fluctuation of shallow water; and

6)      Exceeded result was within the range of baseline monitoring results.

 

Dolphin Monitoring (Line-transect Vessel Survey)

5.8         No Action/Limit Level exceedance was recorded in the reporting period.

Summary of Environmental Complaint

 

5.9         Three environmental related complaints were received in the reporting period. The Complaint Log is attached in Appendix L. All investigation reports for complaint of the Contract have been submitted to summarize the investigation results.  The summary of environmental complaints is presented in Table 5.1. 

Table 5.1              Summary of Environmental Complaints in the Reporting Period

 

Complaint Log Ref.

Location

Received Date

Nature of Complaint

Com-2014-12-001

Shores of Po Chue Tam and Shek Tsai Po, Tai O

7 December 2014

Waste Management

Com-2014-12-002

Site Office of HZMB-HKLR – Section between HKSAR Boundary and Scenic Hill

2 December 2014

Noise

Com-2014-12-003

Along the shore from Yat Tung to Tai O

24 December 2014

Waste Management

Summary of Notification of Summons and Successful Prosecution

 

5.10     There was one prosecution or notification of summons received since the Contract commencement.  Summary of successful prosecution is attached in Appendix M.