5.1
Summary of exceedance is provided in Appendix K. The details of the exceedances were attached in the
Monthly EM&A Report.
Air Quality
5.2
For 1-hour TSP monitoring, no Action/Limit Level exceedance was recorded
in the reporting period.
5.3
For 24-hr TSP monitoring, no Action/Limit Level exceedance was recorded
in the reporting period.
Noise
5.4
No Action/Limit Level exceedance was recorded in the reporting period.
Water Quality
5.5
There are 8 Action Level exceedances and 6 Limit Level exceedances were
recorded for suspended solids. No Action/Limit Level exceedance for
turbidity were recorded in the reporting period.
5.6
According to the investigation, the exceedances are considered not due
to the Contract due to the following reasons:
1)
Installation
work at Pile Cap was carried at near the monitoring stations in which
exceedances were recorded. Water quality impact due to this work is not
anticipated;
2)
No pollution discharge was observed from the site;
3)
Sediment plume due to natural fluctuation of shallow water was
observed but no vessels were observed near the plumes;
4)
Dispersion of sediment plume to the monitoring
stations from the area outside the site boundary (i.e. works area not
under and related to HY/2011/09) was observed; and
5)
No site activity was carried at near the monitoring stations in which
exceedances were recorded.
Dolphin Monitoring (Line-transect Vessel Survey)
5.7
No Action/Limit Level exceedance was recorded in the reporting period.
5.8
No environmental related complaint was received in the reporting period.
The Complaint Log is attached in Appendix
L.
5.9
There was one prosecution or notification of summons received since the Contract
commencement. Summary of successful
prosecution is attached in Appendix M.