5               ENVIRONMENTAL NON-CONFORMANCE (EXCEEDANCES)

Summary of Exceedances

 

5.1         Summary of exceedance is provided in Appendix K. The details of the exceedances were attached in the Monthly EM&A Report.

Air Quality

5.2         For 1-hour TSP monitoring, no Action/Limit Level exceedance was recorded in the reporting period.

5.3         For 24-hour TSP monitoring, no Limit Level exceedance was recorded. One Action Level exceedance for 24-hr TSP monitoring at AMS4 was recorded on 22 January 2016.

5.4         According to the investigation, no dust generation works was conducted at near the monitoring station during the monitoring and observable dust source from construction activity under Contract No. HY/2011/09. In addition, village lorry which emitted heavy smoke was observed. Therefore, the exceedance is considered not due to the Contract.

Noise

5.5         No Action/Limit Level exceedance was recorded in the reporting period.

Water Quality

5.6         There are 14 Action Level exceedances and no Limit Level exceedances were recorded for suspended solids. No Action/Limit Level exceedance for turbidity were recorded in the reporting period.

5.7         According to the investigation, no pollution discharge was observed from the site. In addition, adverse water quality outside the site boundary and dispersion of sediment plume to the monitoring stations from the area outside the site boundary (i.e. works area not under and related to HY/2011/09) were observed. Therefore, the exceedances are considered not due to the Contract.

 

Dolphin Monitoring (Line-transect Vessel Survey)

5.8         No Action/Limit Level exceedance was recorded in the reporting period.

Summary of Environmental Complaint

 

5.9         No environmental related complaint was received in the reporting period. The Complaint Log is attached in Appendix L.

Summary of Notification of Summons and Successful Prosecution

 

5.10     There was one prosecution or notification of summons received since the Contract commencement.  Summary of successful prosecution is attached in Appendix M.