5.1
Summary of exceedance is provided in Appendix K. The details of the exceedances were attached in the
Monthly EM&A Report.
Air Quality
5.2
For 1-hour TSP monitoring, no Action/Limit Level exceedance was recorded
in the reporting period.
5.3
For 24-hour TSP monitoring, no Limit Level exceedance was recorded. One Action
Level exceedance for 24-hr TSP monitoring at AMS4 was recorded on 22 January
2016.
5.4
According to the investigation, no dust generation works was conducted
at near the monitoring station during the monitoring and observable dust source
from construction activity under Contract No. HY/2011/09. In addition, village
lorry which emitted heavy smoke was observed. Therefore, the exceedance is
considered not due to the Contract.
Noise
5.5
No Action/Limit Level exceedance was recorded in the reporting period.
Water Quality
5.6
There are 14 Action Level exceedances and no Limit Level exceedances
were recorded for suspended solids. No Action/Limit Level
exceedance for turbidity were recorded in the reporting period.
5.7
According to the investigation, no pollution discharge was observed from
the site. In addition, adverse water quality outside the site boundary and
dispersion of sediment plume to the monitoring stations from the area outside
the site boundary (i.e. works area not under and related to HY/2011/09) were
observed. Therefore, the exceedances are considered not due to the Contract.
Dolphin Monitoring (Line-transect Vessel Survey)
5.8
No Action/Limit Level exceedance was recorded in the reporting period.
5.9
No environmental related complaint was received in the reporting period.
The Complaint Log is attached in Appendix
L.
5.10
There was one prosecution or notification of summons received since the Contract
commencement. Summary of successful
prosecution is attached in Appendix M.