Contract No. HY/2011/09
Hong Kong-Zhuhai-Macao
Bridge Hong Kong Link Road ¡V
Section between HKSAR
Boundary and Scenic Hill
Exceedance
Report
(A) Exceedance
Report for Air Quality
Environmental Monitoring |
Parameter |
No. of Exceedance |
No. of Exceedance related to the Construction Activities of this Contract |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
||
Air Quality |
1-hr TSP |
0 |
0 |
0 |
0 |
24-hr TSP |
0 |
0 |
0 |
0 |
(B)
Exceedance Report for Construction Noise
(NIL
in the
reporting period)
(C) Exceedance
Report for Water Quality
Environmental Monitoring |
Parameter |
No. of Exceedance |
No. of Exceedance related to the Construction Activities of this Contract |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
||
Water Quality |
Dissolved Oxygen (DO)
(Surface & Middle) |
0 |
0 |
0 |
0 |
Dissolved Oxygen (DO)
(Bottom) |
0 |
0 |
0 |
0 |
|
Turbidity |
0 |
0 |
0 |
0 |
|
Suspended Solids (SS) |
6 |
3 |
0 |
0 |
(D) Exceedance
Report for Line-transect Vessel Surveys
(NIL