1.1
Cinotech
Consultants Limited (Cinotech) was appointed by Dragages -China Harbour-VSL JV
(hereinafter called “the Contractor”) as the
Environmental Team (ET) to undertake the Environmental Monitoring and Audit
(EM&A) programme during construction phase of the
Contract No. HY/2011/09 – Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road –
Section between HKSAR Boundary and Scenic Hill” (hereinafter called the “Contract”) in accordance with EP Conditions 2.1.
1.2
This is the 17th Quarterly EM&A
report which summarises the impact monitoring results
and audit findings for the EM&A programme in the
period between March to May 2017.
1.3
The structure of the report is as follows:
Section
1: Introduction - purpose and structure of the report.
Section
2: Contract Information - summarises
background and scope of the Contract, site description, project organization
and contact details, construction programme, the
construction works undertaken and the status of Environmental Permits/Licenses
during the reporting month.
Section
3: Environmental Monitoring and Audit Requirements - summarises the monitoring parameters, monitoring frequency,
monitoring locations, Action and Limit Levels, Event / Action Plans, site audit
summary and environmental mitigation measures.
Section
4: Environmental Monitoring Results - summarises
the environmental monitoring results in terms of air quality, noise, water quality,
dolphin and waste management.
Section 5: Environmental
Non-conformance - summarises any monitoring
exceedance, environmental complaints, environmental summons and successful
prosecutions within the reporting period.
Section 6: Conclusions and Recommendation