2.1
The proposed Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road (HKLR) is 12km long connecting the Hong
Kong-Zhuhai-Macao Bridge (HZMB) at the HKSAR Boundary with the Hong Kong
Boundary Crossing Facilities (HKBCF) situated at the north eastern waters of
the Hong Kong International Airport, opening a new and direct connection route
between Hong Kong, Macao and the Western Pearl River Delta.
2.2
The HKLR comprises a 9.4km long viaduct
section from the HKSAR boundary to Scenic Hill on the Airport Island; a 1km
tunnel section to the reclamation formed along the east coast of the Airport
Island and a 1.6km long at-grade road section on the reclamation connecting to
the HKBCF. The tunnel section of HKLR will pass under Scenic Hill, Airport Road
and Airport Railway to minimize the environmental and visual impacts to Tung
Chung residents.
2.3
An application (No ESB-110/2003) for an
Environmental Impact Assessment (EIA) Study Brief under Section 5(1) of the
Environmental Impact Assessment Ordinance (EIAO) was submitted by Highways
Department (the Project Proponent) on 8 October 2003 with a Project Profile
(No. No. PP-201/2003) for the Hong Kong - Zhuhai - Macao Bridge Hong Kong
Section and North Lantau Highway Connection. The Hong Kong - Zhuhai - Macao
Bridge Hong Kong Section and North Lantau Highway Connection has subsequently
been renamed as HKLR. EPD issued an
EIA Study Brief (No: ESB-110/2003) in November 2003 to the Project Proponent to
carry out an EIA study.
2.4
An EIA Study (Reg. No. AEIAR-144/2009) has
been undertaken to provide information on nature and extent of environmental
impacts arising from the construction and operation of HKLR. The Environmental
Permit was issued on 4 November 2009 (Permit No. EP-352/2009). Pursuant to
Section 13 of the EIAO, the Director of Environmental Protection amends the
Environmental Permit (No. EP-352/2009) based on the Application No.
VEP-339/2011 and the environmental Permit (Permit No. EP-352/2009/A) was issued
on 9 November 2011 for HKLR to the Highways Department as the Permit Holder.
Subsequently, the Director of Environmental Protection amends the Environmental
Permits (No. EP-352/2009/A, EP-352/2009/B, EP-352/2009/C) based on the
Application No. VEP-409/2013, VEP-411/2013 and VEP-459/2014 respectively. The
environmental Permit (Permit No. EP-352/2009/D) was then issued on 22 December
2014.
2.5
Figure
1a-d shows
the layout of the Contract and the scope of the Contract works
comprises the following major items:
¡P
a
dual 3-lane carriageway in the form of viaduct from the HKSAR boundary
(connecting with the HZMB Main Bridge) to the Scenic Hill (connecting with the
tunnel under separate Contract No. HY/2011/03), of approximately 9.4km in
length with a hard shoulder for each bound of carriageway and a utilities
trough on the outer edge of each bound of viaducts;
¡P
a grade-separated turnaround facility located
near San Shek Wan, composed of sliproads
in the form of viaduct with single-lane carriageway bifurcated from the HKLR
mainline with an elevated junction above the mainline;
¡P
provision of ancillary facilities including,
but not limited to, meteorological enhancement measures including the
provisioning of anemometers and modification of the wind profiler station at
hillside of Sha Lo Wan, provisioning of a compensatory marine radar, and
provisioning of security systems; and
¡P
associated civil, structural, geotechnical,
marine, environmental protection, landscaping, drainage and highways electrical
and mechanical (E&M) works, street lightings, traffic aids and sign gantries,
marine navigational aids, ship impact protection system, water mains and fire
hydrants, lightning protection system, structural health monitoring and
maintenance management system (SHM&MMS), supervisory control and data
acquisition (SCADA) system, as well as operation and maintenance provisions of
viaducts, provisioning of facilities for installation of traffic control and
surveillance system (TCSS), provisioning of facilities for installation of
telecommunication cables/equipments and reprovisioning works of affected existing
facilities/utilities.
2.6
Different parties with different levels of
involvement in the Contract organization include:
Supervising
Officer¡¦s Representative (SOR) ¡V Ove Arup & Partners Hong Kong Limited
(ARUP)
Contractor ¡VDragages -China Harbour-VSL
JV (DCVJV)
Environmental
Team (ET) ¡V Cinotech Consultants Ltd. (Cinotech)
2.7
The proposed project organization and lines
of communication with respect to the on-site environmental management structure
are shown in Figure 2. The key
personnel contact names and numbers are summarized in Table 2.1.
Table 2.1 Key
Contacts of the Contract
Party |
Position |
Name |
Phone No. |
Fax No. |
SOR (ARUP) |
CRE |
Mr.
Michael Chan |
3767 5803 |
3767 5922 |
Mr. Colin
Meadows |
3767 5801 |
|||
ENPO/IEC (Ramboll Environ) |
Environmental
Project Office Leader |
Mr. Y. H
Hui |
3465 2888 |
3465 2899 |
Independent
Environmental Checker |
Mr.
Antony Wong |
3465 2888 |
3465 2899 |
|
Contractor (DCVJV) |
Deputy
Project Director |
Mr. W.K
Poon |
3121 6638 |
3121 6688 |
Environmental
Officer |
Mr. CHU Chung Sing |
3121 6672 |
||
24-hour
Hotline |
-- |
6898 6161 |
-- |
|
ET (Cinotech) |
Environmental
Team Leader |
Dr.
Priscilla Choy |
2151 2089 |
3107 1388 |
2.8
Ramboll Environ Hong Kong Limited (Ramboll Environ) is employed by the Highways
Department as the Independent Environmental Checker (IEC) and Environmental
Project Office (ENPO) for the Project.
2.9
A copy of Contractor¡¦s construction programme
is provided in Appendix A.
Summary of Construction
Works Undertaken During Reporting Period
2.10
The major site activities undertaken in the reporting period included:
March 2017:
Ancillary and Associated
Facilities
(a) P115 & P114 interface area - Reinstatement of slope area temporarily
on-hold pending for drainage and reinstatement detailing coupling with the
additional maintenance path;
(b) Reinstatement of sloping seawall at P103, P104 and P101, P102 are in
progress;
(c) The precast parapet progress is summarized as follows:
Item |
Number in this month |
Cumulative No. of
Precast Parapet Completed (up to end of month) |
Parapet Casting |
788 |
4939 |
Parapet Installation |
542 |
3174 |
In-situ concreting works |
1296 |
7586 |
(d) The central barrier progress is summarized as follows:
Type |
Item |
Monthly Workdone |
Cumulative Workdone (up to end of month) |
Central barrier (precast method) |
Precast |
597 |
4885 |
Installation |
150 |
1144 |
|
Central barrier (precast + in-situ method) |
In-fill concreting # |
57 |
1414 |
# ¡§In-fill concreting¡¨ will be carried out after installation of precast
units or formworks for precast method and in-situ method respectively. After
the in-fill concreting works, the central barrier shall be regarded as
completed.
(e) The side barrier progress is summarized as follows:
Type |
Item |
Monthly Workdone |
Cumulative Workdone (up to 28th of month) |
Side barrier (precast method) |
Precast |
825 |
4786 |
Installation |
606 |
2240 |
|
Side barrier (precast + in-situ method) |
In-fill concreting # |
524 |
3070 |
# ¡§In-fill concreting¡¨ will be carried out after installation of precast
units or formworks for precast method and in-situ method respectively. After
the in-fill concreting works, the side barrier shall be regarded as completed.
(f) Construction of the longitudinal stitching from P92 to P87 & P37 to
P29 is in progress;
(g) Sealing of deck openings and preparation deck surface for waterproofing
is in progress;
(h) Waterproofing and asphalt laying at ML16 to ML19 is in progress;
(i) Watermain installation from P99 to P97 and P44 to P37 & P29 to P21 is in
progress;
(j) Sign gantry GW13, GE15, GE13, GE14, GE12 and GW12 were erected.
E&M Works
(a) E&M works from ML3 to ML1 is in progress;
(b) E&M ducting installation from ML5 to ML4 is in progress and E&M
ducting installation from ML3 commenced;
(c) E&M works inside SHT building is in progress;
(d) Street light cables and poles installation in ML19 & ML18 is in
progress;
(e) Cable hanger installation from ML19 to ML15 is in progress;
(f) Cable hanger installation from ML6 to ML4 continues;
(g) Cable hanger installation at ML2 and ML3 commenced;
(h) E&M ducting installation at radar platform completed;
(i) Construction of Load Centre 7 completed;
(j) Construction of Load Centre 8 to 10 commenced.
Deck Erection
(a) Segment erection in March 2017:
Type |
Location of Segments
erected in this reporting period |
Number of Segments
erected in this reporting period |
Cumulative No. of
Segments erected (up to 28th of each
month) |
Launching Gantry 1 (LG1) |
All completed |
0 |
1020 |
Launching Gantry 2 (LG2) |
All completed |
0 |
1776 |
Lifting Frames 1 (LF1), Hanger Beam (HB) and Crane Barge |
P67, P78 and P82 |
73 |
1214 |
Lifting Frames 1 (LF1), Hanger Beam (HB) and Crane Barge |
All completed |
0 |
842 |
Typical Span SOP |
All completed |
0 |
242 |
Long Span SOP |
All completed |
0 |
96 |
Movement Joint (MJ) SOP Airport Channel |
All completed |
0 |
20 |
Short Span (SS) and Movement Joint (MJ) SOP type B |
All completed |
0 |
16 |
Typical Span Segment type B |
P55R, P56R&L, P59R&L |
62 |
272 |
Segment Lifter / Crane Barge |
P69 |
82 |
200 |
External Prestressing Tendon Installation
Viaduct |
Activities |
Quantities |
Unit |
ML19C |
Threading Stressing Grouting |
47.55 12 9.42 |
T U M3 |
ML19R |
Threading Stressing Grouting |
48.65 12 9.64 |
T U M3 |
ML19L |
Threading Stressing Grouting |
46.91 12 9.29 |
T U M3 |
ML18R |
Threading Stressing Grouting |
77.90 18 15.38 |
T U M3 |
ML18L |
Threading Stressing Grouting |
76.40 18 15.08 |
T U M3 |
ML17R |
Threading Stressing Grouting |
63.09 16 12.44 |
T U M3 |
ML17L |
Threading Stressing Grouting |
62.86 16 12.39 |
T U M3 |
ML16R |
Threading Stressing Grouting |
56.69 15 9.91 |
T U M3 |
ML16L |
Threading Stressing Grouting |
87.34 18 17.2 |
T U M3 |
ML15R |
Threading Stressing Grouting |
108.74 18 21.15 |
T U M3 |
ML15L |
Threading Stressing Grouting |
106.26 18 21.45 |
T U M3 |
ML14R |
Threading Stressing Grouting |
116.06 16 23.04 |
T U M3 |
ML14L |
Threading Stressing Grouting |
118.55 16 23.54 |
T U M3 |
ML13R |
Threading Stressing Grouting |
122.22 16 24.27 |
T U M3 |
ML13L |
Threading Stressing Grouting |
212.71 16 24.17 |
T U M3 |
ML12R |
Threading Stressing Grouting |
166.28 26 32.99 |
T U M3 |
ML12L |
Threading Stressing Grouting |
165.41 24 32.83 |
T U M3 |
ML11R |
Threading Stressing Grouting |
164.83 24 32.72 |
T U M3 |
ML11L |
Threading Stressing Grouting |
166.74 24 33.10 |
T U M3 |
ML10R |
Threading Stressing Grouting |
121.69 16 24.17 |
T U M3 |
ML10L |
Threading Stressing Grouting |
122.16 16 24.26 |
T U M3 |
ML09R |
Threading Stressing Grouting |
140.32 32 27.73 |
T U M3 |
ML09L |
Threading Stressing Grouting |
129.46 32 25.56 |
T U M3 |
ML08R |
Threading Stressing Grouting |
85.72 24 16.89 |
T U M3 |
ML08L |
Threading Stressing Grouting |
85.72 24 16.89 |
T U M3 |
ML07R |
Threading Stressing Grouting |
129.58 32 25.59 |
T U M3 |
ML07L |
Threading Stressing Grouting |
140.43 32 27.76 |
T U M3 |
ML06R |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML06L |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML05R |
Threading Stressing Grouting |
113.68 24 22.48 |
T U M3 |
ML05L |
Threading Stressing Grouting |
112.39 24 22.22 |
T U M3 |
ML04R |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML04L |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML03R |
Threading Stressing Grouting |
199.65 32 39.615 |
T U M3 |
ML03L |
Threading Stressing Grouting |
201.13 32 29.9 |
T U M3 |
ML02R |
Threading Stressing Grouting |
113.72 24 22.49 |
T U M3 |
ML02L |
Threading Stressing Grouting |
113.73 24 22.49 |
T U M3 |
ML1R |
Threading Stressing Grouting |
113.72 24 22.49 |
T U M3 |
ML1L |
Threading Stressing Grouting |
113.73 24 22.49 |
T U M3 |
Internal Prestressing Grouting Progress
Viaduct |
Activities |
Quantities |
Unit |
ML19C |
Air test & Grouting |
14.09 |
M3 |
ML19R |
Air test & Grouting |
14.90 |
M3 |
ML19L |
Air test & Grouting |
13.90 |
M3 |
ML18R |
Air test & Grouting |
25.24 |
M3 |
ML18L |
Air test & Grouting |
24.76 |
M3 |
ML17R |
Air test & Grouting |
23.47 |
M3 |
ML17L |
Air test & Grouting |
23.46 |
M3 |
ML16R |
Air test & Grouting |
36.54 |
M3 |
ML16L |
Air test & Grouting |
35.46 |
M3 |
ML15R |
Air test & Grouting |
39.34 |
M3 |
ML15L |
Air test & Grouting |
39.69 |
M3 |
ML14R |
Air test & Grouting |
104.9 |
M3 |
ML14L |
Air test & Grouting |
106.55 |
M3 |
ML13R |
Air test & Grouting |
108.28 |
M3 |
ML13L |
Air test & Grouting |
107.73 |
M3 |
ML12R |
Air test & Grouting |
121.77 |
M3 |
ML12L |
Air test & Grouting |
121.00 |
M3 |
ML11R |
Air test & Grouting |
111.47 |
M3 |
ML11L |
Air test & Grouting |
112.75 |
M3 |
ML10R |
Air test & Grouting |
89.33 |
M3 |
ML10L |
Air test & Grouting |
89.59 |
M3 |
ML09R |
Air test & Grouting |
63.27 |
M3 |
ML09L |
Air test & Grouting |
57.86 |
M3 |
ML08R |
Air test & Grouting |
36.58 |
M3 |
ML08L |
Air test & Grouting |
36.56 |
M3 |
ML07R |
Air test & Grouting |
59.61 |
M3 |
ML07L |
Air test & Grouting |
60.05 |
M3 |
ML06R |
Air test & Grouting |
58.31 |
M3 |
ML06L |
Air test & Grouting |
58.31 |
M3 |
ML05R |
Air test & Grouting |
58.62 |
M3 |
ML05L |
Air test & Grouting |
58.01 |
M3 |
ML04R |
Air test & Grouting |
57.64 |
M3 |
ML04L |
Air test & Grouting |
57.69 |
M3 |
ML03R |
Air test & Grouting |
126.65 |
M3 |
ML03L |
Air test & Grouting |
127.63 |
M3 |
ML02R |
Air test & Grouting |
62.74 |
M3 |
ML02L |
Air test & Grouting |
62.74 |
M3 |
ML01R |
Air test & Grouting |
53.80 |
M3 |
ML01L |
Air test & Grouting |
53.80 |
M3 |
Turnaround Facilities
(a) Erection of BG01 & BG02 were completed;
(b) Stitching works between 2 Box Girders BG01, BG02
and SOPs is in progress;
(c) Construction of I-beams in casting yard is in
progress;
(d) Erection of I-beam supporting towers is in
progress.
Delivery for Precast
Concrete Elements (by barge)
(e) Precast Deck Segments:
-
Number of barges engaged in this period: 11.
- Number of deck segment deliveries in this period:32
trips.
- Cumulative number of deck segment deliveries: 1114 trips.
- The last segment
was completed loading successfully on last trip on 28 March 2017.
Segment Types |
Segment Delivered in
this reporting period |
Cumulative No. of
Precast Segment Delivered (up to end of month) |
A |
18 |
2480 |
B |
56 |
304 |
C |
98 |
1700 |
D |
0 |
216 |
E |
0 |
1014 |
April 2017:
Ancillary and Associated
Facilities
(a) P115 & P114 interface area - Reinstatement of slope area temporarily
on-hold pending for drainage and reinstatement detailing coupling with the
additional maintenance path;
(b) Reinstatement of sloping seawall at P96 to P100 are in progress;
(c) The precast facial parapet progress is summarized as follows:
Item |
Number in this month |
Cumulative No. of
Precast Parapet Completed (up to end of month) |
Precast Parapet Facial Panel
Casting |
660 |
5599 |
Precast Parapet Facial Panel Installation |
248 |
3422 |
In-situ concreting works |
593 |
8179 |
(d) The central barrier progress is summarized as follows:
Type |
Item |
Monthly Workdone |
Cumulative Workdone (up to end of month) |
Central barrier (precast method) |
Precast |
461 |
5346 |
Installation |
236 |
1380 |
|
Central barrier (precast + in-situ method) |
In-fill concreting # |
413 |
1827 |
# ¡§In-fill concreting¡¨ will be carried out after installation of precast
units or formworks for precast method and in-situ method respectively. After
the in-fill concreting works, the central barrier shall be regarded as
completed.
(e) The side barrier progress is summarized as follows:
Type |
Item |
Monthly Workdone |
Cumulative Workdone (up to 28th of month) |
Side barrier (precast method) |
Precast |
457 |
5243 |
Installation |
469 |
2709 |
|
Side barrier (precast + in-situ method) |
In-fill concreting # |
1356 |
4426 |
# ¡§In-fill concreting¡¨ will be carried out after installation of precast
units or formworks for precast method and in-situ method respectively. After
the in-fill concreting works, the side barrier shall be regarded as completed.
(f) Construction of the longitudinal stitching from P92 to P87 & P37 to
P27 is in progress;
(g) Sealing of deck openings and preparation deck surface for waterproofing
is in progress;
(h) Watermain installation from P88 to P94 and P44 to P26 & P19 to P21 is in
progress;
(i) Sign gantry GW12, GW13, GE15, GE13, GE14, GE12 and GW12, GE5, were
erected.
E&M Works
(a) E&M works from ML3 to ML1 is in progress;
(b) E&M ducting installation in ML3 is in progress and E&M ducting
installation from ML1 to ML2 commenced;
(c) E&M works inside SHT building is in progress;
(d) Street light cables and poles installation in ML19 & ML18 is in
progress;
(e) Cable hanger installation from ML19 to ML15 was completed;
(f) Cable hanger installation from ML6 to ML4 continues;
(g) Cable hanger installation at ML2 and ML3 continues;
(h) Construction of Load Centre 8, 9 and 10 commenced.
Deck Erection
(a)
All
segment erections were completed except 16 segments at turnaround facilities. A
summary is shown below:
Type |
Location of Segments
erected in this reporting period |
Number of Segments
erected in this reporting period |
Cumulative No. of
Segments erected (up to end of the
month) |
Launching Gantry 1 (LG1) |
All completed |
0 |
1020 |
Launching Gantry 2 (LG2) |
All completed |
0 |
1776 |
Lifting Frames 1 (LF1), Hanger Beam (HB) and Crane Barge |
P67, P78 and P82 |
73 |
1214 |
Lifting Frames 1 (LF1), Hanger Beam (HB) and Crane Barge |
All completed |
0 |
842 |
Typical Span SOP |
All completed |
0 |
242 |
Long Span SOP |
All completed |
0 |
96 |
Movement Joint (MJ) SOP Airport Channel |
All completed |
0 |
20 |
Short Span (SS) and Movement Joint (MJ) SOP type B |
All completed |
0 |
16 |
Typical Span Segment type B |
P56R&L |
0 |
272 |
Segment Lifter / Crane Barge |
P69 |
82 |
200 |
External Prestressing Tendon Installation
Viaduct |
Activities |
Quantities |
Unit |
ML19C |
Threading Stressing Grouting |
47.55 12 9.42 |
T U M3 |
ML19R |
Threading Stressing Grouting |
48.65 12 9.64 |
T U M3 |
ML19L |
Threading Stressing Grouting |
46.91 12 9.29 |
T U M3 |
ML18R |
Threading Stressing Grouting |
77.90 18 15.38 |
T U M3 |
ML18L |
Threading Stressing Grouting |
76.40 18 15.08 |
T U M3 |
ML17R |
Threading Stressing Grouting |
63.09 16 12.44 |
T U M3 |
ML17L |
Threading Stressing Grouting |
62.86 16 12.39 |
T U M3 |
ML16R |
Threading Stressing Grouting |
56.69 15 9.91 |
T U M3 |
ML16L |
Threading Stressing Grouting |
87.34 18 17.2 |
T U M3 |
ML15R |
Threading Stressing Grouting |
108.74 18 21.15 |
T U M3 |
ML15L |
Threading Stressing Grouting |
106.26 18 21.45 |
T U M3 |
ML14R |
Threading Stressing Grouting |
116.06 16 23.04 |
T U M3 |
ML14L |
Threading Stressing Grouting |
118.55 16 23.54 |
T U M3 |
ML13R |
Threading Stressing Grouting |
122.22 16 24.27 |
T U M3 |
ML13L |
Threading Stressing Grouting |
212.71 16 24.17 |
T U M3 |
ML12R |
Threading Stressing Grouting |
166.28 26 32.99 |
T U M3 |
ML12L |
Threading Stressing Grouting |
165.41 24 32.83 |
T U M3 |
ML11R |
Threading Stressing Grouting |
164.83 24 32.72 |
T U M3 |
ML11L |
Threading Stressing Grouting |
166.74 24 33.10 |
T U M3 |
ML10R |
Threading Stressing Grouting |
121.69 16 24.17 |
T U M3 |
ML10L |
Threading Stressing Grouting |
122.16 16 24.26 |
T U M3 |
ML09R |
Threading Stressing Grouting |
140.32 32 27.73 |
T U M3 |
ML09L |
Threading Stressing Grouting |
129.46 32 25.56 |
T U M3 |
ML08R |
Threading Stressing Grouting |
85.72 24 16.89 |
T U M3 |
ML08L |
Threading Stressing Grouting |
85.72 24 16.89 |
T U M3 |
ML07R |
Threading Stressing Grouting |
129.58 32 25.59 |
T U M3 |
ML07L |
Threading Stressing Grouting |
140.43 32 27.76 |
T U M3 |
ML06R |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML06L |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML05R |
Threading Stressing Grouting |
113.68 24 22.48 |
T U M3 |
ML05L |
Threading Stressing Grouting |
112.39 24 22.22 |
T U M3 |
ML04R |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML04L |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML03R |
Threading Stressing Grouting |
199.65 32 39.615 |
T U M3 |
ML03L |
Threading Stressing Grouting |
201.13 32 29.9 |
T U M3 |
ML02R |
Threading Stressing Grouting |
113.72 24 22.49 |
T U M3 |
ML02L |
Threading Stressing Grouting |
113.73 24 22.49 |
T U M3 |
ML1R |
Threading Stressing Grouting |
113.72 24 22.49 |
T U M3 |
ML1L |
Threading Stressing Grouting |
113.73 24 22.49 |
T U M3 |
Internal Prestressing Grouting Progress
Viaduct |
Activities |
Quantities |
Unit |
ML19C |
Air test & Grouting |
14.09 |
M3 |
ML19R |
Air test & Grouting |
14.90 |
M3 |
ML19L |
Air test & Grouting |
13.90 |
M3 |
ML18R |
Air test & Grouting |
25.24 |
M3 |
ML18L |
Air test & Grouting |
24.76 |
M3 |
ML17R |
Air test & Grouting |
23.47 |
M3 |
ML17L |
Air test & Grouting |
23.46 |
M3 |
ML16R |
Air test & Grouting |
36.54 |
M3 |
ML16L |
Air test & Grouting |
35.46 |
M3 |
ML15R |
Air test & Grouting |
39.34 |
M3 |
ML15L |
Air test & Grouting |
39.69 |
M3 |
ML14R |
Air test & Grouting |
104.9 |
M3 |
ML14L |
Air test & Grouting |
106.55 |
M3 |
ML13R |
Air test & Grouting |
108.28 |
M3 |
ML13L |
Air test & Grouting |
107.73 |
M3 |
ML12R |
Air test & Grouting |
121.77 |
M3 |
ML12L |
Air test & Grouting |
121.00 |
M3 |
ML11R |
Air test & Grouting |
111.47 |
M3 |
ML11L |
Air test & Grouting |
112.75 |
M3 |
ML10R |
Air test & Grouting |
89.33 |
M3 |
ML10L |
Air test & Grouting |
89.59 |
M3 |
ML09R |
Air test & Grouting |
63.27 |
M3 |
ML09L |
Air test & Grouting |
57.86 |
M3 |
ML08R |
Air test & Grouting |
36.58 |
M3 |
ML08L |
Air test & Grouting |
36.56 |
M3 |
ML07R |
Air test & Grouting |
59.61 |
M3 |
ML07L |
Air test & Grouting |
60.05 |
M3 |
ML06R |
Air test & Grouting |
58.31 |
M3 |
ML06L |
Air test & Grouting |
58.31 |
M3 |
ML05R |
Air test & Grouting |
58.62 |
M3 |
ML05L |
Air test & Grouting |
58.01 |
M3 |
ML04R |
Air test & Grouting |
57.64 |
M3 |
ML04L |
Air test & Grouting |
57.69 |
M3 |
ML03R |
Air test & Grouting |
126.65 |
M3 |
ML03L |
Air test & Grouting |
127.63 |
M3 |
ML02R |
Air test & Grouting |
62.74 |
M3 |
ML02L |
Air test & Grouting |
62.74 |
M3 |
ML01R |
Air test & Grouting |
53.80 |
M3 |
ML01L |
Air test & Grouting |
53.80 |
M3 |
Turnaround Facilities
(a)
Mid-stitches
between Box Girders and stitches between Box Girders and SOPs are completed
except longitudinal stitch between box girders;
(b)
Four
I-beams were delivered on site.
Road Pavement
Road Pavement |
Total (m2) |
Monthly Workdone (m2) |
Cumulative Workdone (m2) |
A |
284440 |
0 |
34133 |
B |
284440 |
0 |
25600 |
C |
274688 |
0 |
0 |
May 2017:
Ancillary and Associated
Facilities
(a) P115 & P114 interface area - Reinstatement of slope area temporarily
on-hold pending for drainage and reinstatement detailing coupling with the
additional maintenance path;
(b) Reinstatement of sloping seawall at P96 to P101 are in progress;
(c) The precast facial parapet progress is summarized as follows:
Item |
Number in this month |
Cumulative No. of
Precast Parapet Completed (up to 28th
of month) |
Precast Parapet Facial Panel
Casting |
692 |
6340 |
Precast Parapet Facial Panel Installation |
130 |
3577 |
In-situ concreting works |
311 |
8549 |
(d) The central barrier progress is summarized as follows:
Type |
Item |
Monthly Workdone |
Cumulative Workdone (up to 28th
of month) |
Central barrier (precast method) |
Precast |
248 |
5714 |
Installation |
224 |
1628 |
|
Central barrier (precast + in-situ method) |
In-fill concreting # |
168 |
2031 |
# ¡§In-fill concreting¡¨ will be carried out after installation of precast
units or formworks for precast method and in-situ method respectively. After
the in-fill concreting works, the central barrier shall be regarded as
completed.
(e) The side barrier progress is summarized as follows:
Type |
Item |
Monthly Workdone |
Cumulative Workdone (up to 28th
of month) |
Side barrier (precast method) |
Precast |
285 |
5691 |
Installation |
188 |
2999 |
|
Side barrier (precast + in-situ method) |
In-fill concreting # |
561 |
5038 |
# ¡§In-fill concreting¡¨ will be carried out after installation of precast
units or formworks for precast method and in-situ method respectively. After
the in-fill concreting works, the side barrier shall be regarded as completed.
(f) Construction of the longitudinal stitching from P92 to P87 & P37 to
P25 is in progress;
(g) Sealing of deck openings and preparation deck surface for waterproofing
is in progress;
(h) Watermain installation from P44 to P4 is in progress;
(i)
Sign gantry GW13, GW12, GW11,
GE15, GE14, GE13, GE12, GE1 to GE5 and GW1 to GE4, were erected.
(j) Chek Lap Kok South Road realignment* is in progress.
Note:
*Minor Modification
Works:-
¡PShifting the bus stop
location;
¡PShifting the old
alignment near P109 southward; and
¡PRe-instating the
underground drainage with the new alignment due to the minor modification works
above.
E&M Works
(a) E&M works from ML2 to ML1 is in progress;
(b) E&M ducting installation in ML1 to ML3 is in progress;
(c) E&M ducting installation from ML6 to ML1 commenced;
(d) E&M duct installation at deck void in ML7 and ML8 commenced;
(e) E&M works inside SHT building is in progress;
(f) Cable hanger installation from ML6 to ML4 completed;
(g) Cable hanger installation between ML1 and ML3 continues;
(h) Construction of Load Centre 8, 9 and 10 completed;
(i) Pillar box installation was completed for load centre
7 and load centre 8;
(j) Street light cables and poles installation in ML19 & ML18 is in
progress;
(k) Completion of installation for TCSS¡¦s CCTV high mast at CH.12+600 and
13+190;
(l) Completion of installation for C&ED¡¦s CCTV high mast at CH12+280.
Deck Erection
(a) 6 segments were erected at P56 of the ramp at turnaround facilities. Last
10 segments are remaining to be erected.
(b) LF1-B launching from P82 to P80 were completed;
(c) Segment lifter dismantling has started at WA4.
External Prestressing Tendon Installation
Viaduct |
Activities |
Quantities |
Unit |
ML19C |
Threading Stressing Grouting |
47.55 12 9.42 |
T U M3 |
ML19R |
Threading Stressing Grouting |
48.65 12 9.64 |
T U M3 |
ML19L |
Threading Stressing Grouting |
46.91 12 9.29 |
T U M3 |
ML18R |
Threading Stressing Grouting |
77.90 18 15.38 |
T U M3 |
ML18L |
Threading Stressing Grouting |
76.40 18 15.08 |
T U M3 |
ML17R |
Threading Stressing Grouting |
63.09 16 12.44 |
T U M3 |
ML17L |
Threading Stressing Grouting |
62.86 16 12.39 |
T U M3 |
ML16R |
Threading Stressing Grouting |
56.69 15 9.91 |
T U M3 |
ML16L |
Threading Stressing Grouting |
87.34 18 17.2 |
T U M3 |
ML15R |
Threading Stressing Grouting |
108.74 18 21.15 |
T U M3 |
ML15L |
Threading Stressing Grouting |
106.26 18 21.45 |
T U M3 |
ML14R |
Threading Stressing Grouting |
116.06 16 23.04 |
T U M3 |
ML14L |
Threading Stressing Grouting |
118.55 16 23.54 |
T U M3 |
ML13R |
Threading Stressing Grouting |
122.22 16 24.27 |
T U M3 |
ML13L |
Threading Stressing Grouting |
212.71 16 24.17 |
T U M3 |
ML12R |
Threading Stressing Grouting |
166.28 26 32.99 |
T U M3 |
ML12L |
Threading Stressing Grouting |
165.41 24 32.83 |
T U M3 |
ML11R |
Threading Stressing Grouting |
164.83 24 32.72 |
T U M3 |
ML11L |
Threading Stressing Grouting |
166.74 24 33.10 |
T U M3 |
ML10R |
Threading Stressing Grouting |
121.69 16 24.17 |
T U M3 |
ML10L |
Threading Stressing Grouting |
122.16 16 24.26 |
T U M3 |
ML09R |
Threading Stressing Grouting |
140.32 32 27.73 |
T U M3 |
ML09L |
Threading Stressing Grouting |
129.46 32 25.56 |
T U M3 |
ML08R |
Threading Stressing Grouting |
85.72 24 16.89 |
T U M3 |
ML08L |
Threading Stressing Grouting |
85.72 24 16.89 |
T U M3 |
ML07R |
Threading Stressing Grouting |
129.58 32 25.59 |
T U M3 |
ML07L |
Threading Stressing Grouting |
140.43 32 27.76 |
T U M3 |
ML06R |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML06L |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML05R |
Threading Stressing Grouting |
113.68 24 22.48 |
T U M3 |
ML05L |
Threading Stressing Grouting |
112.39 24 22.22 |
T U M3 |
ML04R |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML04L |
Threading Stressing Grouting |
113.04 24 22.35 |
T U M3 |
ML03R |
Threading Stressing Grouting |
199.65 32 39.615 |
T U M3 |
ML03L |
Threading Stressing Grouting |
201.13 32 29.9 |
T U M3 |
ML02R |
Threading Stressing Grouting |
113.72 24 22.49 |
T U M3 |
ML02L |
Threading Stressing Grouting |
113.73 24 22.49 |
T U M3 |
ML1R |
Threading Stressing Grouting |
113.72 24 22.49 |
T U M3 |
ML1L |
Threading Stressing Grouting |
113.73 24 22.49 |
T U M3 |
Internal Prestressing Grouting Progress
Viaduct |
Activities |
Quantities |
Unit |
ML19C |
Air test & Grouting |
14.09 |
M3 |
ML19R |
Air test & Grouting |
14.90 |
M3 |
ML19L |
Air test & Grouting |
13.90 |
M3 |
ML18R |
Air test & Grouting |
25.24 |
M3 |
ML18L |
Air test & Grouting |
24.76 |
M3 |
ML17R |
Air test & Grouting |
23.47 |
M3 |
ML17L |
Air test & Grouting |
23.46 |
M3 |
ML16R |
Air test & Grouting |
36.54 |
M3 |
ML16L |
Air test & Grouting |
35.46 |
M3 |
ML15R |
Air test & Grouting |
39.34 |
M3 |
ML15L |
Air test & Grouting |
39.69 |
M3 |
ML14R |
Air test & Grouting |
104.9 |
M3 |
ML14L |
Air test & Grouting |
106.55 |
M3 |
ML13R |
Air test & Grouting |
108.28 |
M3 |
ML13L |
Air test & Grouting |
107.73 |
M3 |
ML12R |
Air test & Grouting |
121.77 |
M3 |
ML12L |
Air test & Grouting |
121.00 |
M3 |
ML11R |
Air test & Grouting |
111.47 |
M3 |
ML11L |
Air test & Grouting |
112.75 |
M3 |
ML10R |
Air test & Grouting |
89.33 |
M3 |
ML10L |
Air test & Grouting |
89.59 |
M3 |
ML09R |
Air test & Grouting |
63.27 |
M3 |
ML09L |
Air test & Grouting |
57.86 |
M3 |
ML08R |
Air test & Grouting |
36.58 |
M3 |
ML08L |
Air test & Grouting |
36.56 |
M3 |
ML07R |
Air test & Grouting |
59.61 |
M3 |
ML07L |
Air test & Grouting |
60.05 |
M3 |
ML06R |
Air test & Grouting |
58.31 |
M3 |
ML06L |
Air test & Grouting |
58.31 |
M3 |
ML05R |
Air test & Grouting |
58.62 |
M3 |
ML05L |
Air test & Grouting |
58.01 |
M3 |
ML04R |
Air test & Grouting |
57.64 |
M3 |
ML04L |
Air test & Grouting |
57.69 |
M3 |
ML03R |
Air test & Grouting |
126.65 |
M3 |
ML03L |
Air test & Grouting |
127.63 |
M3 |
ML02R |
Air test & Grouting |
62.74 |
M3 |
ML02L |
Air test & Grouting |
62.74 |
M3 |
ML01R |
Air test & Grouting |
53.80 |
M3 |
ML01L |
Air test & Grouting |
53.80 |
M3 |
Turnaround Facilities
(a)
Mid-stitches
between Box Girders and stitches between Box Girders and SOPs were completed.
Longitudinal stitch between box girders is in progress;
(b)
Strands
installation and stressing for extended platforms are in progress.
Road Pavement
Road Pavement |
Total (m2) |
Monthly Workdone (m2) |
Cumulative Workdone (m2) |
A |
284440 |
0 |
34133 |
B |
284440 |
0 |
25600 |
C |
274688 |
0 |
0 |
2.11 The
valid environmental licenses and permits were attached in the Monthly EM&A Reports.