5               ENVIRONMENTAL NON-CONFORMANCE (EXCEEDANCES)

Summary of Exceedances

 

5.1         Summary of exceedance is provided in Appendix K. The details of the exceedances were attached in the Monthly EM&A Report.

Air Quality

5.2         For 1-hour TSP monitoring, no Action/Limit Level exceedance was recorded in the reporting period.

5.3         For 24-hr TSP monitoring, no Action/Limit Level exceedance was recorded in the reporting period.

Noise

5.4         No Action/Limit Level exceedance was recorded in the reporting period.

Water Quality

5.5            There are 13 Action Level exceedances and 6 Limit Level exceedances were recorded for suspended solids. No Action/Limit Level exceedance for dissolved oxygen and turbidity were recorded in the reporting period.

5.6         According to the investigation, the exceedances are considered not due to the Contract due to the following reasons:

1)      No pollution discharge from construction activity was observed;

2)      The exceeded results were similar or within the ranges baseline monitoring results;

3)      Sediment plume due to natural fluctuation of shallow water was observed;

4)      Monitoring station is situated at the upstream of the construction sites;

5)      Control Station value already exceeded either the Baseline Action or Limit Levels;

6)      Adverse water quality outside the site boundary was observed while no construction vessel for this Contract was travelling nearby.

7)      Adverse water quality outside the site boundary was observed while no pollution source from this Contract was observed and no construction vessel for this Contract was travelling nearby. Dispersion of sediment plume to the monitoring stations from the area outside the site boundary (i.e. works area not under and related to HY/2011/09) was also observed.

 

Dolphin Monitoring (Line-transect Vessel Survey)

5.7         There was an Action Level exceedance of dolphin monitoring for the quarterly monitoring data (between March to May 2017). According to the investigation report(Appendix K), the exceedance is considered not due to the ContractSummary of Environmental Complaint

 

5.8         Two environmental related complaint was received in the reporting period. The Complaint Log is attached in Appendix L.

Summary of Notification of Summons and Successful Prosecution

 

5.9         There was one prosecution or notification of summons received since the Contract commencement.  Summary of successful prosecution is attached in Appendix M.