This Quarterly Environmental Monitoring and Audit (EM&A) Report presents the
EM&A works undertaken in the period between June to
August 2017 in accordance with EM&A Manual.
6.2
No Action/Limit Level exceedance was recorded for air quality and noise.
6.3
There are twenty three Action Level and twenty nine Limit Level
exceedances were recorded for dissolved oxygen. Six Action Level and two Limit
Level exceedance was recorded for suspended solids and no Action/Limit Level
exceedance for turbidity was recorded in the reporting period.
6.4
There was an Action Level exceedance of dolphin monitoring for the
quarterly monitoring data (between June to August 2017).
6.5
According to the investigation, all exceedances are considered not due
to the Contract.
6.6
During this quarter of dolphin
monitoring, no adverse impact from the activities of the HKLR09 construction
project on Chinese White Dolphins was noticeable from general observations.
6.7
Environmental site inspection was
conducted on 6th, 15th, 22nd and 27th
June 2017, 4th, 11th,
18th and 25th July 2017, 1st, 8th, 15th,
22nd and 29th August 2017 by ET in
the reporting month. All deficiencies identified during the site inspection
have already rectified / improved during the follow-up audit session.
6.8
The inspection to the Sha Lo
Wan (West) Archaeological Site was conducted on 15th June 2017. No
access to Sha Lo Wan (West) Archaeological site for works areas and storage of
construction equipment was observed.
6.9
There were two environmental
complaint received in the reporting period. No notification of summons and successful prosecution received in the reporting period.
6.10
The ET will keep track on the
EM&A programme to ensure compliance of environmental requirements and the
proper implementation of all necessary mitigation measures.
6.11
According to the environmental
audit performed in the reporting month, the following recommendations were made:
Air Quality Impact
¡P
To
regularly maintain the quality of machinery and vehicles on site.
¡P
To
implement dust suppression measures on all haul roads, stockpiles, dry surfaces
and excavation works.
¡P
To provide hoarding along the entire length of that
portion of the site boundary.
Noise Impact
¡P
To
inspect the noise sources inside the site.
¡P
To
space out noisy equipment and position the equipment as far away as possible
from sensitive receivers.
¡P
To
provide temporary noise barriers for operations of noisy equipment near the
noise sensitive receivers, if necessary.
Water Impact
¡P
To prevent any surface runoff
discharge into any stream course and sea.
¡P
To review and implement
temporary drainage system.
¡P
To identify any wastewater
discharges from site.
¡P
To ensure properly maintenance
for de-silting facilities.
¡P
To clear the silt and sediment
in the sedimentation tanks.
¡P
To review the capacity of
de-silting facilities for discharge.
¡P
To divert all the water
generated from construction site to de-silting facilities with enough handling
capacity before discharge.
¡P
To avoid accumulation of stagnant and ponding water on site.
Ecology Impact
¡P
To implement Spill Response Plan in the event of accidential
spillage of or other hazardours chemicals.
¡P
To implement Dolphin Exclusion Zone during the installation of
bored pile casing located in the waters to the west of Airport.
¡P
To implement Dolphin Watching Plan after the bored piling casing
is installed.
¡P
To ensure the acoustically-decoupled measures were implemented for air
compressors and other noisy equipment mounted on construction vessels according
to acoustic decoupling measures plan.
Waste/Chemical Management
¡P
To
check for any accumulation of waste materials or rubbish on site.
¡P
To ensure the performance of sorting of C&D
materials at source (during generation);
¡P
To carry out inspection of dump truck at site exit
to ensure inert and non-inert C&D materials are properly segregated before
removing off site.
¡P
To
avoid any discharge or accidental spillage of chemical waste or oil directly from the
site.
¡P
To
avoid improper handling or storage of oil drum on site.