EXECUTIVE SUMMARY

Introduction

1.              This is the 20th Quarterly Environmental Monitoring and Audit (EM&A) Report prepared by Cinotech Consultants Limited for the project ¡§Contract No. HY/2011/09 ¡V Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road ¡V Section between HKSAR Boundary and Scenic Hill¡¨ (hereinafter called the ¡§Contract¡¨). This report documents the findings of EM&A Works performed in the period between December 2017 to February 2018.

Environmental Monitoring and Audit Progress

2.              A summary of the monitoring activities in this reporting period is listed in Table I below:

Table I            Summary Table for Monitoring Activities in the Reporting Period

Parameter(s)

Monitoring Date(s)

1-hr TSP Monitoring

4th, 8th, 14th, 20th, 26th and 30th December 2017

5th, 11th, 17th, 23rd and 29th January 2018

2nd, 8th, 14th, 20th and 26th February 2018

24-hr TSP Monitoring

Noise Monitoring

5th, 15th, 21st and 27th December 2017

6th, 12th, 18th, 24th and 30th January 2018

9th, 15th, 21st and 27th February 2018

*Water Quality Monitoring

2nd, 4th, 6th, 8th, 12th, 14th, 16th, 18th, 20th, 22nd, 26th, 28th and 30th December 2017

2nd, 4th, 6th, 8th, 10th, 12th, 15th, 17th, 19th, 22nd, 24th, 26th, 29th and 31st January 2018

2nd, 5th, 7th, 9th, 12th, 14th, 20th, 22nd, 24th, 26th and 28th February 2018

Dolphin Monitoring (Line-transect Vessel Surveys)

4th and 21st December 2017

3rd and 23rd January 2018

8th and 23rd February 2018

Environmental Site Inspection

5th, 12th, 19th and 27th December 2017

2nd, 9th, 16th , 23rd and 30th January 2018

6th, 13th, 20th and 27th February 2018

Archaeological Site Inspection

12th December 2017

* No marine construction works was conducted in the period between 16th and 19th February 2018 (Lunar New Year's Holiday).

Breaches of Action and Limit Levels

3.              Summary of the environmental exceedances of the reporting period is tabulated in Table II.

Table II          Summary Table for Events Recorded in the Reporting Period

 

Environmental Monitoring

Parameter

No. of Exceedance

No. of Exceedance related to the Construction Activities of this Contract

Action Level

Limit Level

Action Level

Limit Level

Air Quality

1-hr TSP

2

0

0

0

24-hr TSP

0

0

0

0

Noise

Leq(30min)

0

0

0

0

Water Quality

Dissolved Oxygen (DO) (Surface & Middle)

0

0

0

0

Dissolved Oxygen (DO) (Bottom)

0

0

0

0

Turbidity

0

0

0

0

Suspended Solids (SS)

10

1

0

0

Dolphin Monitoring

Line-transect Vessel Surveys

0

1

0

0

 

4.              Environmental monitoring works were performed in the reporting period and all monitoring results were checked and reviewed.  The details of each exceedance were attached in the Monthly EM&A Reports.

Complaint Log

 

5.              No environmental complaint was received in the reporting period.

Notification of Summons and Successful Prosecutions

 

6.              No notification of summons and successful prosecution was received in the reporting period.

Reporting Changes

 

7.              This report has been developed in compliance with the reporting requirements for the quarterly EM&A Summary Report as required by the EM&A Manual for Hong Kong Link Road (EM&A Manual).

 

Future Key Issues

8.              Major site activities for the coming reporting month will include:

WA4

There should be no environmental issue due to the Asphalt Plant at WA4 as the ASL Asphalt Plant has been abandoned since 9 February 2018.

Ancillary and Associated Facilities

¡P             Reinstatement of slope area and drainage works at P115 interface area;

¡P             Continue reinstatement of sloping seawall at Portion A;

¡P             Continue reinstatement works at South Perimeter Road;

¡P             Rehabilitation works for existing drains and sewerage at South Perimeter Road between P81 to P84 commence;

¡P             Commence road lighting at Scenic Road;

¡P             Continue construction of drainage at P113;

¡P             Continue installation of carrier drains at ML8;

¡P             Continue installation of water main at ML8;

¡P             Continue installation of utility trough covers;

¡P             Continue remaining road marking works;

¡P             Continue installation of the additional pier number and information signs.

 

E&M Works

¡P             Continue installation of the pile cap lighting;

¡P             Complete installation of the additional LED flood light;

¡P             Commence installation of red obstacle light at high mast.

 

Removal of Temporary works

¡P             Continue P69 & 70 jetty dismantling works and P68 platform removal works;

¡P             Continue defect repairing works on bridge bearings;

¡P             Continue APC Temporary Platforms under the MJ pier;

¡P             Continue Western Water NSS temporary platforms removal.

 

Turnaround Facilities

¡P             Construction of U-channel at top of Turnaround.

 

10m Works at P0 Interface

 

¡P             Road marking work at 10m interface area.