1.
This is the 20th Quarterly Environmental Monitoring and Audit
(EM&A) Report prepared by Cinotech Consultants
Limited for the project
¡§Contract No. HY/2011/09 ¡V Hong
Kong-Zhuhai-Macao Bridge Hong Kong Link Road ¡V Section between HKSAR Boundary
and Scenic Hill¡¨ (hereinafter called the ¡§Contract¡¨). This report documents the findings of EM&A Works performed in the
period between December 2017 to February 2018.
Environmental Monitoring and Audit Progress
2.
A summary of the monitoring activities in this reporting period is
listed in Table I below:
Table I Summary
Table for Monitoring Activities in the Reporting Period
Parameter(s) |
Monitoring Date(s) |
1-hr TSP Monitoring |
4th, 8th,
14th, 20th, 26th and 30th December
2017 5th, 11th,
17th, 23rd and 29th January 2018 2nd, 8th,
14th, 20th and 26th February 2018 |
24-hr TSP Monitoring |
|
Noise Monitoring |
5th, 15th,
21st and 27th December 2017 6th, 12th,
18th, 24th and 30th January 2018 9th, 15th,
21st and 27th February 2018 |
*Water Quality Monitoring |
2nd, 4th, 6th, 8th,
12th, 14th, 16th, 18th, 20th,
22nd, 26th, 28th and 30th December 2017 2nd, 4th, 6th, 8th,
10th, 12th, 15th, 17th, 19th,
22nd, 24th, 26th, 29th and 31st
January 2018 2nd, 5th, 7th, 9th,
12th, 14th, 20th, 22nd, 24th,
26th and 28th February 2018 |
4th and 21st December 2017 3rd and 23rd January 2018 8th and 23rd February 2018 |
|
Environmental Site
Inspection |
5th, 12th, 19th and
27th December 2017 2nd, 9th, 16th ,
23rd and 30th January 2018 6th, 13th, 20th
and 27th February 2018 |
Archaeological Site
Inspection |
12th December 2017 |
* No marine construction works was conducted in the period between 16th
and 19th February 2018 (Lunar New Year's Holiday).
Breaches of Action and Limit Levels
3.
Summary of the environmental exceedances of the reporting period is
tabulated in Table II.
Table II Summary
Table for Events Recorded in the Reporting Period
Environmental Monitoring |
Parameter |
No. of Exceedance |
No. of Exceedance related to the Construction Activities of this Contract |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
||
Air Quality |
1-hr TSP |
2 |
0 |
0 |
0 |
24-hr TSP |
0 |
0 |
0 |
0 |
|
Noise |
Leq(30min) |
0 |
0 |
0 |
0 |
Water Quality |
Dissolved Oxygen (DO)
(Surface & Middle) |
0 |
0 |
0 |
0 |
Dissolved Oxygen (DO)
(Bottom) |
0 |
0 |
0 |
0 |
|
Turbidity |
0 |
0 |
0 |
0 |
|
Suspended Solids (SS) |
10 |
1 |
0 |
0 |
|
Dolphin Monitoring |
Line-transect Vessel
Surveys |
0 |
1 |
0 |
0 |
4.
Environmental monitoring works were performed in the reporting period
and all monitoring results were checked and reviewed. The details of each exceedance were
attached in the Monthly EM&A Reports.
Complaint Log
5.
No environmental complaint was received in the reporting period.
Notification of
Summons and Successful Prosecutions
6.
No notification of summons and successful prosecution was received in
the reporting period.
7.
This report has been developed in compliance with the reporting
requirements for the quarterly EM&A Summary Report
as required by the EM&A Manual for Hong Kong Link Road (EM&A Manual).
8.
Major site activities for
the coming reporting month will include:
WA4
There should be no environmental issue due
to the Asphalt Plant at WA4 as the ASL Asphalt Plant has been abandoned since 9
February 2018.
Ancillary
and Associated Facilities
¡P
Reinstatement of slope area and drainage works
at P115 interface area;
¡P
Continue reinstatement of sloping seawall at
Portion A;
¡P
Continue reinstatement works at South
Perimeter Road;
¡P
Rehabilitation works for existing drains and
sewerage at South Perimeter Road between P81 to P84 commence;
¡P
Commence road lighting at Scenic Road;
¡P
Continue construction of drainage at P113;
¡P
Continue installation of carrier drains at
ML8;
¡P
Continue installation of water main at ML8;
¡P
Continue installation of utility trough
covers;
¡P
Continue remaining road marking works;
¡P
Continue installation of the additional pier
number and information signs.
E&M
Works
¡P
Continue installation of the pile cap
lighting;
¡P
Complete installation of the additional LED
flood light;
¡P
Commence installation of red obstacle light at
high mast.
Removal
of Temporary works
¡P
Continue P69 & 70 jetty dismantling works
and P68 platform removal works;
¡P
Continue defect repairing works on bridge
bearings;
¡P
Continue APC Temporary Platforms under the MJ
pier;
¡P
Continue Western Water NSS temporary platforms
removal.
Turnaround
Facilities
¡P
Construction of U-channel at top of
Turnaround.
10m Works at P0
Interface
¡P
Road marking work at 10m interface area.