1.
This is the 21st Quarterly Environmental Monitoring and Audit
(EM&A) Report prepared by Cinotech Consultants
Limited for the project
¡§Contract No. HY/2011/09 ¡V Hong
Kong-Zhuhai-Macao Bridge Hong Kong Link Road ¡V Section between HKSAR Boundary
and Scenic Hill¡¨ (hereinafter called the ¡§Contract¡¨). This report documents the findings of EM&A Works performed in the
period between March to May 2018.
Environmental Monitoring and Audit Progress
2.
A summary of the monitoring activities in this reporting period is
listed in Table I below:
Table I Summary
Table for Monitoring Activities in the Reporting Period
Parameter(s) |
Monitoring Date(s) |
1-hr TSP Monitoring |
2nd, 8th, 14th,
20th,26th and 31st March 2018 6th, 12th, 18th,
24th and 30th April 2018 4th, 10th, 16th,
21st, 25th and 31st May 2018 |
24-hr TSP Monitoring |
|
Noise Monitoring |
9th, 15th,
21st and 27th March 2018 4th, 13th,
19th and 25th April 2018 2nd, 7th,
17th and 23rd May 2018 |
Water Quality Monitoring |
2nd, 5th,
7th, 9th, 13th, 15th, 17th,
19th, 21st, 23rd, 27th, 29th
and 31st March 2018 2nd, 4th,
6th, 10th, 12th, 14th, 16th,
18th, 20th, 23rd, 26th, 28th
and 30th April 2018 2nd, 4th,
8th, 10th, 12th, 14th, 16th,
18th, 22nd, 24th, 26th, 28th
and 30th May 2018 |
7th and 15th March 2018 6th and 13th April 2018 2nd and 14th May 2018 |
|
Environmental Site
Inspection |
6th, 13th, 20th
and 27th March 2018 3rd, 10th, 17th
and 24th April 2018 2nd, 8th, 15th ,23rd
and 29th May 2018 |
Archaeological Site
Inspection |
27th March 2018 |
Breaches of Action and Limit Levels
3.
Summary of the environmental exceedances of the reporting period is
tabulated in Table II.
Table II Summary
Table for Events Recorded in the Reporting Period
Environmental Monitoring |
Parameter |
No. of Exceedance |
No. of Exceedance related to the Construction Activities of this Contract |
||
Action
Level |
Limit
Level |
Action
Level |
Limit
Level |
||
Air Quality |
1-hr TSP |
0 |
0 |
0 |
0 |
24-hr TSP |
1 |
0 |
0 |
0 |
|
Noise |
Leq(30min) |
0 |
0 |
0 |
0 |
Water Quality |
Dissolved Oxygen (DO)
(Surface & Middle) |
4 |
0 |
0 |
0 |
Dissolved Oxygen (DO)
(Bottom) |
24 |
3 |
0 |
0 |
|
Turbidity |
0 |
0 |
0 |
0 |
|
Suspended Solids (SS) |
8 |
2 |
0 |
0 |
|
Dolphin Monitoring |
Line-transect Vessel
Surveys |
0 |
0 |
0 |
0 |
4.
Environmental monitoring works were performed in the reporting period
and all monitoring results were checked and reviewed. The details of each exceedance were
attached in the Monthly EM&A Reports.
Complaint Log
5.
No environmental complaint was received in the reporting period.
Notification of
Summons and Successful Prosecutions
6.
No notification of summons and successful prosecution was received in
the reporting period.
7.
This report has been developed in compliance with the reporting
requirements for the quarterly EM&A Summary Report
as required by the EM&A Manual for Hong Kong Link Road (EM&A Manual).
8.
Major site activities for
the coming reporting month will include:
Western Water
¡P
Installation of cat ladders at pile cap walls;
¡P
Dismantling NSS access platforms; and
¡P
Installation of permanent maintenance platforms.
P68
¡P
Construction of permanent rockfill
platform
Portion
A
¡P
Reinstatement of South Perimeter Road (P81 ¡V
P83)