Table I Summary
Table for Monitoring Activities in the Reporting Period
Parameter(s) |
Monitoring Date(s) |
1-hr TSP Monitoring |
3rd, 7th, 13th, [1]19th,
[1]20th, 24th and 28th September
2018 4th, 10th, 16th
and 22nd October 2018 |
24-hr TSP Monitoring |
3rd, 7th, 13th, [1]19th,
[1]20th, 24th and [2]28th
September 2018 [2]2nd, 4th, 10th,
16th and 22nd October 2018 |
Noise Monitoring |
5th, 11th, 20th
and 26th September 2018 5th, 11th, 18th
and 23rd October 2018 |
Water Quality Monitoring |
1st, 4th, 6th, 8th,
10th, [3]12th, 14th, [4]17th,
19th, 21st, 25th, 27th and 29th
September 2018 [5]2nd, 4th, 6th, 8th,
10th, 12th, [5]15th, 18th,
20th and 23rd October 2018 |
5th and 11th September 2018 2nd and 9th October 2018 |
|
Post-construction Phase Dolphin Monitoring
(Line-transect Vessel Surveys) |
5th and 12th November 2018 |
Environmental Site Inspection |
4th, 11th, 18th
and 26th September 2018 2nd, 9th, 16th
and 23rd October 2018 |
Archaeological Site Inspection |
18th September 2018 |
[1] 1hr & 24 hr TSP at AMS1 on 19th
September 2018 was cancelled due to the power supply and rescheduled to 20th
September 2018.
[2] 24 hr
TSP at AMS1 on 28th September 2018 was cancelled due to the power
supply and rescheduled to 2 October 2018.
[3] Water quality
monitoring (Mid-Ebb) on 12th September 2018 was cancelled due to
adverse weather (Strong Wind Signal No.3)
[4] Water quality
monitoring on 17th September 2018 was cancelled due to adverse
weather (Strong Wind Signal No.3)
[5] Water quality monitoring (Mid-Ebb) on
2nd and 15th October 2018 were cancelled due to safety
reason. The reasons for no alternative include:
a)
The tidal ranges of the alternative is less than 0.5m
b) Two sets of monitoring are not less than 36 hours