5.1
Summary of exceedance is provided in Appendix K. The details of the exceedances were attached in the
Monthly EM&A Report.
Air Quality
5.2
No Action/Limit Level exceedance was recorded for air quality in the
reporting period.
Noise
5.3
No Action/Limit Level exceedance was recorded in the reporting period.
Water Quality
5.4
No Action/Limit Level exceedance for dissolved oxygen and turbidity was
recorded in the reporting period.
5.5
There are two Action Level exceedances were recorded for suspended
solids.
5.6
According to the investigation, the exceedances are
considered not due to the Contract due to the following reasons:
No major marine construction activity was conducted;
No pollution discharge from construction activity was observed;
Sediment plume due to natural fluctuation of shallow water was observed;
Localized sediment plume due to the rough water condition was observed;
and
Dispersion of sediment plume to the monitoring stations from the area
outside the site boundary (i.e. area not under and related to HY/2011/09) was
observed.
Dolphin Monitoring (Line-transect Vessel Survey)
5.7
No Action/Limit Level exceedance was recorded in the reporting period.
5.8
No environmental related complaint was received in the reporting period.
The Complaint Log is attached in Appendix
L.
5.9
There was one prosecution or notification of summons received since the Contract
commencement. Summary of successful
prosecution is attached in Appendix M.