Table of Contents

                       

                        Executive Summary                                                              

1                      Introduction                                                                           

1.1                   Background                                                                            

1.2                   Scope of Report                                                                    

1.3                   Organization Structure                                                   

1.4                   Summary of Construction Works                                

2                      EM&A Results                                                                          

2.1                   Air Quality                                                                               

2.2                   Noise Monitoring

2.3                   Water Quality Monitoring                                               

2.4                   Dolphin Monitoring                                                              

2.5                   EM&A Site Inspection                                                           

2.6                   Waste Management Status                                              

2.7                   Environmental Licenses and Permits                         

2.8                   Implementation Status of Environmental Mitigation Measures   

2.9                   Summary of Exceedances of the Environmental Quality Performance Limit                                                                                             

2.10                 Summary of Complaints, Notification of Summons and Successful Prosecutions                                                                          

3                      Future Key Issues                                                                 

3.1                   Construction Programme for the Coming Month

3.2                   Key Issues for the Coming Month                                 

3.3                   Monitoring Schedule for the Coming Month          

4                      Conclusions and Recommendations                           

4.1                   Conclusions                                                                            

 

List of Appendices

Appendix A          Project Organization for Environmental Works

Appendix B          Three Month Rolling Construction Programmes

Appendix C          Implementation Schedule of Environmental Mitigation Measures (EMIS)

Appendix D          Summary of Action and Limit Levels

Appendix E          EM&A Monitoring Schedules

Appendix F          Impact Dolphin Monitoring Survey Results

Appendix G         Event Action Plan

Appendix H          Monthly Summary of Waste Flow Table

Appendix I           Cumulative Statistics on Exceedances, Complaints, Notifications of Summons and Successful Prosecutions

 

Executive Summary

Under Contract No. HY/2012/07, Gammon Construction Limited (GCL) is commissioned by the Highways Department (HyD) to undertake the design and construction of the Southern Connection Viaduct Section of the Tuen Mun – Chek Lap Kok Link Project (TM-CLK Link Project) while AECOM Asia Company Limited was appointed by HyD as the Supervising Officer.  For implementation of the environmental monitoring and audit (EM&A) programme under the Contract, ERM-Hong Kong, Limited (ERM) has been appointed as the Environmental Team (ET).  Ramboll Hong Kong Ltd. was employed by the HyD as the Independent Environmental Checker (IEC) and Environmental Project Office (ENPO) in accordance with Environmental Permit No. EP-354/2009/A.  Further applications for variation of environmental permit (VEP), EP-354/2009/B, EP-354/2009/C and EP-354/2009/D, were granted on 28 January 2014, 10 December 2014 and 13 March 2015, respectively.

The southern landfall of TM-CLK Link lies alongside the Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities (HKBCF) where a reclamation area is constructed by Contract No. HY/2010/02 under Environmental Permit No. EP-353/2009/K and EP-354/2009/D.  Upon the agreement and confirmation between the Supervising Officer Representatives and Contractors of HY/2010/02 and HY/2012/07 in September 2015, part of the reclamation area for southern landfall under EP-353/2009/K and EP-354/2009/D was handed-over to Contract No. HY/2012/07.  Another part of the southern landfall area under EP-354/2009/D was handed-over to Contract No. HY/2012/07 after completion of reclamation works by Contract No. HY/2010/02 in June 2016.

The construction phase of the Contract commenced on 31 October 2013.  The impact monitoring of the EM&A programme, including air quality, noise, water quality and marine ecological monitoring as well as environmental site inspections, commenced on 31 October 2013.

This is the seventy-sixth Monthly EM&A report presenting the EM&A works carried out during the period from 1 to 29 February 2020 for the Southern Connection Viaduct Section in accordance with the Updated EM&A Manual of the TM-CLK Link Project.  As informed by the Contractor, there are no major works to be undertaken in the monitoring period of February 2020.

A summary of monitoring and audit activities conducted in the reporting period is listed below:

Impact Dolphin Monitoring                                 2 sessions

Joint Environmental Site Inspection                  4 sessions

Breaches of Action and Limit Levels for Air Quality

No air quality monitoring was scheduled for the reporting month as construction works was substantially completed on 31 July 2019.  Notification of temporary suspension of air quality monitoring has been approved by EPD on 28 August 2019.

Breaches of Action and Limit Levels for Noise

No noise monitoring was scheduled for the reporting month as construction works was substantially completed on 31 July 2019.  Notification of temporary suspension of noise monitoring has been approved by EPD on 28 August 2019. 

Impact Dolphin Monitoring

One (1) Limit Level exceedance was observed for the quarterly dolphin monitoring data between December 2019 to February 2020, whilst no unacceptable impact from the construction activities of the TM-CLKL Southern Connection Viaduct Section on Indo-Pacific humpback dolphin Sousa chinensis (i.e. Chinese White Dolphin) was noticeable from general observations.  Due to monthly variation in dolphin occurrence within the Study Area, it would be more appropriate to draw conclusion on whether any impacts on dolphins have been detected related to the construction activities of the TM-CLKL Southern Connection Viaduct Section in the quarterly EM&A reports, in which comparison on distribution, group size and encounter rates of dolphins between the quarterly impact monitoring period and baseline monitoring period will be made.

No marine works were undertaken during the reporting period, therefore, daily 250 m marine mammal exclusion zone monitoring was not undertaken during the reporting period. 

Environmental Complaints, Non-compliance & Summons

No environmental complaints, notification of summons or successful prosecution recorded in the reporting period.

Reporting Change

There was no reporting change in the reporting period.

Upcoming Works for the Next Reporting Period

There are no major works to be undertaken in the next monitoring period of March 2020.

Future Key Issues

Potential environmental impacts arising from the above upcoming construction activities in the next reporting month of March 2020 is mainly associated with waste management issues.

 

1             Introduction

1.1                         Background

According to the findings of the Northwest New Territories (NWNT) Traffic and Infrastructure Review conducted by the Transport Department, Tuen Mun Road, Ting Kau Bridge, Lantau Link and North Lantau Highway would be operating beyond capacity after 2016.  This forecast has been based on the estimated increase in cross boundary traffic, developments in the Northwest New Territories (NWNT), and possible developments in North Lantau, including the Airport developments, the Lantau Logistics Park (LLP) and the Hong Kong – Zhuhai – Macao Bridge (HZMB).  In order to cope with the anticipated traffic demand, two new road sections between NWNT and North Lantau – Tuen Mun – Chek Lap Kok Link (TM-CLKL) and Tuen Mun Western Bypass (TMWB) are proposed.

An Environmental Impact Assessment (EIA) of TM-CLKL (the Project) was prepared in accordance with the EIA Study Brief (No. ESB-175/2007) and the Technical Memorandum of the Environmental Impact Assessment Process (EIAO-TM).  The EIA Report was submitted under the Environmental Impact Assessment Ordinance (EIAO) in August 2009.  Subsequent to the approval of the EIA Report (EIAO Register Number AEIAR-146/2009), an Environmental Permit (EP-354/2009) for TM-CLKL was granted by the Director of Environmental Protection (DEP) on 4 November 2009, and EP variation (EP-354/2009/A) was issued on 8 December 2010.

Under Contract No. HY/2012/07, Gammon Construction Limited (GCL) is commissioned by the Highways Department (HyD) to undertake the design and construction of the Southern Connection Viaduct Section of TM-CLKL (“the Contract”) while AECOM Asia Company Limited was appointed by HyD as the Supervising Officer.  For implementation of the environmental monitoring and audit (EM&A) programme under the Contract, ERM-Hong Kong, Limited (ERM) has been appointed as the Environmental Team (ET).  Ramboll Hong Kong Ltd. was employed by HyD as the Independent Environmental Checker (IEC) and Environmental Project Office (ENPO) in accordance with Environmental Permit No. EP-354/2009/A.  Further applications for variation of environmental permit (VEP), EP-354/2009/B, EP-354/2009/C and EP-354/2009/D, were granted on 28 January 2014, 10 December 2014 and 13 March 2015, respectively.

The southern landfall of TM-CLK Link lies alongside the Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities (HKBCF) where a reclamation area is constructed by Contract No. HY/2010/02 under Environmental Permit No. EP-353/2009/K and EP-354/2009/D.  Upon the agreement and confirmation between the Supervising Officer Representatives and Contractors of HY/2010/02 and HY/2012/07 in September 2015, part of the reclamation area for southern landfall under EP-353/2009/K and EP-354/2009/D was handed-over to Contract No. HY/2012/07.  Another part of the southern landfall area under EP-354/2009/D was handed-over to Contract No. HY/2012/07 after completion of reclamation works by Contract No. HY/2010/02 in June 2016.

The construction phase of the Contract commenced on 31 October 2013.  The impact monitoring phase of the EM&A programme, including air quality, noise, water quality and marine ecological monitoring as well environmental site inspections, commenced on 31 October 2013. 

The general layout plan of the Contract components is presented in Figures 1.1 & 1.2a to l.

1.2                         Scope of Report

This is the seventy-sixth Monthly EM&A Report under the Contract No. HY/2012/07 Tuen Mun – Chek Lap Kok Link – Southern Connection Viaduct Section.  This report presents a summary of the environmental monitoring and audit works in February 2020.

1.3                         Organization Structure

The organization structure of the Contract is shown in Appendix A.  The key personnel contact names and contact details are summarized in Table 1.1 below.


Table 1.1        Contact Information of Key Personnel

Party

Position

Name

Telephone

Fax

HyD (Highways Department)

Project Coordinator

Stanley Chan

2762 3406

3188 6614

 

Senior Engineer

Steven Shum

 

2762 4133

3188 6614

SOR

(AECOM Asia Company Limited)

 

Chief Resident Engineer

Daniel Ip

3553 3800

2492 2057

 

Resident Engineer

 

Chan Wah Fu

2293 6434

3691 2899

ENPO / IEC

(Ramboll Hong Kong Ltd.)

ENPO Leader

 

Y.H. Hui

3465 2850

3465 2899

IEC

Dr. F.C. Tsang

3465 2851

3465 2899

 

Contractor

(Gammon Construction Limited)

 

 

 

 

Environmental Officer

 

Roy Leung

3520 0387

3520 0486

 

24-hour Complaint Hotline

 

 

9738 4332

 

ET (ERM-HK)

ET Leader

Dr. Jasmine Ng

2271 3311

2723 5660

1.4                         Summary of Construction Works

The construction phase of the Contract commenced on 31 October 2013.  The three-month rolling construction programme is shown in Appendix B.  The jetty removal works and reinstatement was hand over to Contract No.: HY/2012/08 TMCLKL Northern Connection Sub-Sea Tunnel Section.   

As informed by the Contractor, no major works were carried out in the reporting month.

The Environmental Sensitive Receivers in the vicinity of the Project are shown in Figure 1.3.

The environmental mitigation measures implementation schedule is presented in Appendix C.

 

2             EM&A Results

The EM&A programme required environmental monitoring for air quality, noise, water quality and marine ecology as well as environmental site inspections for air quality, noise, water quality, waste management, marine ecology and landscape and visual impacts.  The EM&A requirements and related findings for each component are summarized in the following sections.

2.1                         Air Quality

 

No air quality monitoring was scheduled for the reporting month as construction works was substantially completed on 31 July 2019.  Notification of temporary suspension of air quality monitoring has been approved by EPD on 28 August 2019.

2.2                         Noise Monitoring

No noise monitoring was scheduled for the reporting month as construction works was substantially completed on 31 July 2019.  Notification of temporary suspension of noise monitoring has been approved by EPD on 28 August 2019.

2.3                         Water Quality Monitoring

Post-construction water quality monitoring was completed on 23 December 2019.  

2.4                         Dolphin Monitoring

2.4.1                     Monitoring Requirements

Impact dolphin monitoring is required to be conducted by a qualified dolphin specialist team to evaluate whether there have been any effects on the Indo-Pacific humpback dolphin Sousa chinensis (i.e. Chinese White Dolphin) from the Contract.  In order to fulfil the EM&A requirements and make good use of available resources, the on-going impact line transect dolphin monitoring data collected by HyD’s Contract No. HY/2012/08 TMCLKL Northern Connection Sub-Sea Tunnel Section on the monthly basis is adopted to avoid duplicates of survey effort.

2.4.2                     Monitoring Equipment

Table 2.1 summarizes the equipment used for the impact dolphin monitoring.

Table 2.1         Dolphin Monitoring Equipment

Equipment

Model

Global Positioning System (GPS)

 

 

Camera

 

 

Laser Binoculars

 

Marine Binocular

 

Vessel for Monitoring

 

Garmin 18X-PC

Geo One Phottix

 

Nikon D90 300m 2.8D fixed focus

Nikon D90 20-300m zoom lens

 

Infinitor LRF 1000

 

Bushell 7 x 50 marine binocular with compass and reticules

 

65 foot single engine motor vessel with viewing platform 4.5m above water level

2.4.3                     Monitoring Parameter, Frequencies and Duration

Dolphin monitoring should cover all transect lines in Northeast Lantau (NEL) and the Northwest Lantau (NWL) survey areas twice per month throughout the entire construction period.  The monitoring data should be compatible with, and should be made available for, long-term studies of small cetacean ecology in Hong Kong.  In order to provide a suitable long-term dataset for comparison, identical methodology and line transects employed in baseline dolphin monitoring was followed in the impact dolphin monitoring.

2.4.4                     Monitoring Location

The impact dolphin monitoring was carried out in the NEL and NWL along the line transect as depicted in Figure 2.1.  The co-ordinates of all transect lines are shown in Table 2.2 below ([1]). 


Table 2.2        Impact Dolphin Monitoring Line Transect Co-ordinates

 Line No.

Easting

Northing

Line No.

Easting

Northing

1

Start Point

804671

815456

13

Start Point

816506

819480

1

End Point

804671

831404

13

End Point

816506

824859

2

Start Point

805476

820800

14

Start Point

817537

820220

2

End Point

805476

826654

14

End Point

817537

824613

3

Start Point

806464

821150

15

Start Point

818568

820735

3

End Point

806464

822911

15

End Point

818568

824433

4

Start Point

807518

821500

16

Start Point

819532

821420

4

End Point

807518

829230

16

End Point

819532

824209

5

Start Point

808504

821850

17

Start Point

820451

822125

5

End Point

808504

828602

17

End Point

820451

823671

6

Start Point

809490

822150

18

Start Point

821504

822371

6

End Point

809490

825352

18

End Point

821504

823761

7

Start Point

810499

822000*

19

Start Point

822513

823268

7

End Point

810499

824613

19

End Point

822513

824321

8

Start Point

811508

821123

20

Start Point

823477

823402

8

End Point

811508

824254

20

End Point

823477

824613

9

Start Point

812516

821303

21

Start Point

805476

827081

9

End Point

812516

824254

21

End Point

805476

830562

10

Start Point

813525

821176

22

Start Point

806464

824033

10

End Point

813525

824657

22

End Point

806464

829598

11

Start Point

814556

818853

23

Start Point

814559

821739

11

End Point

814556

820992

23

End Point

814559

824768

12

Start Point

815542

818807

24

Start Point

805476

815900

12

End Point

815542

824882

24

End Point

805476

819100

2.4.5                     Action & Limit Levels

The Action and Limit levels of dolphin impact monitoring are shown in Appendix D.  The Event and Action plan is presented in Appendix G.


2.4.6                     Monitoring Schedule for the Reporting Month

Dolphin monitoring was carried out on 10, 18, 20 and 24 February 2020 (Appendix E).

2.4.7                     Results and Observations

A total of 258.86 km of survey effort was collected, with 100.0% of the total survey effort being conducted under favourable weather conditions (i.e. Beaufort Sea State 3 or below with good visibility) during the surveys in February 2020.  Among the two areas, 94.50 km and 164.36 km of survey effort were collected from NEL and NWL survey areas, respectively.  The total survey effort conducted on primary and secondary lines were 189.74 km and 69.12 km, respectively.  The survey efforts are summarized in Appendix F.

Four (4) groups of sixteen (16) Chinese White Dolphin was sighted during the two sets of monitoring surveys in February 2020.  The dolphin sighting was made in NWL.  During the surveys in February 2020, all dolphin sightings were made during on-effort search and were sighted on the primary line.  The dolphin was not associated with operating fishing vessel and was not sighted in the proximity of the Project’s alignment.  The distribution of dolphin sighting during the reporting month is shown in Figure 2.2.

The southern end of transect line no. 8 was not travelled on 18 and 24 February 2020 during the dolphin monitoring due to the presence of construction boats along the transect line.  Part of the transect line was not travelled due to safety concerns.

Encounter rates of Chinese White Dolphins are deduced from the survey effort and on-effort sighting data made under favourable conditions (Beaufort 3 or below) in February 2020 are shown in Tables 2.3 & 2.4.

Table 2.3        Individual Survey Event Encounter Rates

 

 

Encounter rate (STG)     (no. of on-effort dolphin sightings per 100 km of survey effort)

Encounter rate (ANI)            (no. of dolphins from all on-effort sightings per 100 km of survey effort)

Primary Lines Only

Primary Lines Only

NEL

Set 1: February 10th / 18th

0.0

0.0

Set 2: February 20th /24th

0.0

0.0

NWL

Set 1: February 10th / 18th

3.4

5.0

Set 2: February 20th /24th

3.4

22.1

Note:  Dolphin Encounter Rates are deduced from the two sets of surveys ( two surveys in each set) in February 2020 in Northeast (NEL) and Northwest Lantau (NWL)


Table 2.4     Monthly Average Encounter Rates

 

Encounter rate (STG)       

(no. of on-effort dolphin sightings per 100 km of survey effort)

Encounter rate (ANI)            (no. of dolphins from all on-effort sightings per 100 km of survey effort)

Primary   Lines Only

Both Primary and Secondary Lines

Primary   Lines Only

Both Primary and Secondary Lines

Northeast Lantau

0.0

0.0

0.0

0.0

Northwest Lantau

3.4

2.4

13.5

9.7

Note:  Overall dolphin encounter rates (sightings per 100 km of survey effort) from all four surveys are conducted in February 2020 on primary lines only as well as both primary lines and secondary lines in Northeast and Northwest Lantau

One (1) Limit Level exceedance was observed for the quarterly dolphin monitoring data between December 2019 to February 2020, whilst no unacceptable impact from the construction activities of the TM-CLKL Southern Connection Viaduct Section on Indo-Pacific humpback dolphin Sousa chinensis (i.e. Chinese White Dolphin) was noticeable from general observations.  Due to monthly variation in dolphin occurrence within the Study Area, it would be more appropriate to draw conclusion on whether any impacts on dolphins have been detected related to the construction activities of the TM-CLKL Southern Connection Viaduct Section in the quarterly EM&A reports, in which comparison on distribution, group size and encounter rates of dolphins between the quarterly impact monitoring period and baseline monitoring period will be made.

2.4.8                     Marine Mammal Exclusion Zone Monitoring

No marine works were undertaken during the reporting period, therefore, daily 250 m marine mammal exclusion zone monitoring was not undertaken during the reporting period. 

Passive Acoustic Monitoring (PAM) had been decommissioned as no marine piling works was carried out outside the daylight hours since September 2015. 

2.5                         EM&A Site Inspection

Site inspections were carried out on a weekly basis to monitor the implementation of proper environmental pollution control and mitigation measures under the Contract.  In the reporting month, four (4) site inspections were carried out on 6, 13, 19 and 27 February 2020. 

Key observations during the site inspections are summarized in Table 2.5.

 
Table
2.5        Specific Observations Identified during the Weekly Site Inspections in this Reporting Month

Inspection Date

Environmental Observations

Recommendations/ Remarks

6 February 2020

Viaduct C

Ÿ   Nil.

Viaduct C

Ÿ   Nil.

13 February 2020

Pak Mong

Ÿ   Nil.

Pak Mong

Ÿ   Nil.

19 February 2020

Viaduct C

Ÿ   Nil.

WA1

Ÿ   Nil.

Viaduct C

Ÿ   Nil.

WA1

Ÿ   Nil.

27 February 2020

Southern Landfall

Ÿ   Nil.

Southern Landfall

Ÿ   Nil.

No particular observations were identified during environmental site inspections in the reporting month.

2.6                         Waste Management Status

The Contractor has submitted application form for registration as chemical waste producer under the Contract.  Sufficient numbers of receptacles were available for general refuse collection and sorting.

Wastes generated during this reporting period include mainly construction wastes (inert and non-inert) and recyclable materials.  Reference has been made to the waste flow table prepared by the Contractor (Appendix H).  The quantities of different types of wastes are summarized in Table 2.6.


Table 2.6        Quantities of Different Waste Generated in the Reporting Period

Month/

Year

Inert C&D Materials (a) (m3)

Imported Fill (m3)

Inert Construction Waste Re-used

(m3)

Non-inert Construction Waste (b) (kg)

Recyclable Materials (c)  (kg)

Chemical Wastes (kg)

Marine Sediment (m3)

Category L

Category M

(Mp & Mf)

Category H

February 2020

48

0

0

0

0

0

0

0

0

Notes:

(a)  Inert construction wastes include hard rock and large broken concrete, and materials disposed as public fill.

(b)  Non-inert construction wastes include general refuse disposed at landfill.

(c)   Recyclable materials include metals, paper, cardboard, plastics, timber, felled trees and others.

The Contractor was advised to properly maintain on site C&D materials and waste collection, sorting and recording system, dispose of C&D materials and wastes at designated ground and maximize reuse/ recycle of C&D materials and wastes.  The Contractor was also reminded to properly maintain the site tidiness and dispose of the wastes accumulated on site regularly and properly.

For chemical waste containers, the Contractor was reminded to treat properly and store temporarily in designated chemical waste storage area on site in accordance with the Code of Practice on the Packaging, Labelling and Storage of Chemical Wastes.

2.7                         Environmental Licenses and Permits

The status of environmental licensing and permit is summarized in Table 2.7 below.


Table 2.7        Summary of Environmental Licensing and Permit Status

License/ Permit

License or Permit No.

Date of Issue

Date of Expiry

License/ Permit Holder

Remarks

Environmental Permit

EP-354/2009/D

13 Mar 2015

N/A

HyD

Tuen Mun- Chek Lap Kok Link

Environmental Permit

EP-353/2009/K

11 Apr 2016

N/A

HyD

Hong Kong Boundary Crossing Facilities

Construction Dust Notification

361571

5 Jul 2013

N/A

GCL

 

Construction Dust Notification

362093

17 Jul 2013

N/A

GCL

For Area 23

Chemical Waste Registration

5213-961-G2380-13

10 Oct 2013

N/A

GCL

Chemical waste produced in Contract No. HY/2012/07

(Area 1 adjacent to Cheng Tung Road, Siu Ho Wan)

Chemical Waste Registration

5213-961-G2380-14

10 Oct 2013

N/A

GCL

Chemical waste produced in Contract No. HY/2012/07

(Area 2 adjacent to Cheung Tung Road, Pak Mong Village)

Chemical Waste Registration

5213-974-G2588-03

4 Nov 2013

N/A

GCL

Chemical waste produced in Contract No. HY/2012/07

(WA5 adjacent to Cheung Tung Road, Yam O)

Chemical Waste Registration

5213-951-G2380-17

12 Jun 2014

N/A

GCL

Viaducts A, B, C, D & E

Construction Waste Disposal Account

7017735

10 Jul 2013

N/A

GCL

-

Construction Waste Disposal Account

7019470

3 Mar 2014

N/A

GCL

Vessel CHIT Account

Construction Noise Permit for night works and works in general holidays

GW-RS1108-19

12 December 2019

11 June 2020

GCL

Broad Permit for Whole Site Areas

Construction Noise Permit for night works and works in general holidays

GW-RW0592-19

18 December 2019

13 June 2020

GCL

General works at WA5

Construction Noise Permit for night works and works in general holidays

 

 

 

                                            

GW-RS1214-19

16 January 2020

14 February 2020

GCL

Defect Repairing at under-bridge of Viaduct B and C


2.8                         Implementation Status of Environmental Mitigation Measures

In response to the site audit findings, the Contractors carried out corrective actions.

A summary of the Implementation Schedule of Environmental Mitigation Measures (EMIS) is presented in Appendix C.  The necessary mitigation measures were implemented properly for this Contract.

The landscape and visual (L&V) mitigation measures were also monitored on weekly basis in the reporting period.  The monitoring status is summarized in Appendix C.

2.9                         Summary of Exceedances of the Environmental Quality Performance Limit

Post-construction water quality monitoring was completed on 23 December 2019. 

No air quality and noise impact monitoring was conducted in the reporting period.

Cumulative statistics on exceedances is provided in Appendix I.

2.10                       Summary of Complaints, Notification of Summons and Successful Prosecutions

The Environmental Complaint Handling Procedure is provided in Figure 2.3.

There was no environmental complaint, notification of summons or successful prosecution recorded in the reporting period.

Statistics on complaints, notifications of summons, successful prosecutions are summarized in Appendix I.

                                       

3             Future Key Issues

3.1                         Construction Programme for the Coming Month

As informed by the Contractor, there are no major works to be undertaken in the next monitoring period of March 2020.

3.2                         Key Issues for the Coming Month

Potential environmental impacts arising from the above upcoming construction activities in the next reporting month of March 2020 is mainly associated with waste management issues.

3.3                         Monitoring Schedule for the Coming Month

The tentative schedules for environmental monitoring in March 2020 are provided in Appendix E.

 

4             Conclusions and Recommendations

4.1                         Conclusions

This Seventy-sixth Monthly EM&A Report presents the findings of the EM&A activities undertaken during the period from 1 to 29 February 2020 in accordance with the Updated EM&A Manual and the requirements of the Environmental Permits (EP-354/2009/D and EP-353/2009/K).

No Air quality (1-hour TSP and 24-hour TSP) and noise monitoring were carried out in the reporting month.  Post-construction water quality monitoring (DO, turbidity and SS) was completed on 23 December 2019.  Dolphin monitoring was carried out in the reporting month.

Four (4) groups of sixteen (16) Chinese White Dolphins were sighted during the two sets of monitoring surveys in February 2020.  One (1) Limit Level exceedance was observed for the quarterly dolphin monitoring data between December 2019 to February 2020, whilst no unacceptable impact from the construction activities of the TM-CLKL Southern Connection Viaduct Section on Indo-Pacific humpback dolphin Sousa chinensis (i.e. Chinese White Dolphin) was noticeable from general observations. 

Environmental site inspections were carried out four (4) times in February 2020.  Recommendations on remedial actions were given to the Contractor for the deficiencies identified during the site audits.

There was no environmental complaint, notification of summons or successful prosecution recorded in the reporting period.

The ET will keep track on the construction works to confirm compliance of environmental requirements and the proper implementation of all necessary mitigation measures.


                       



([1])      Proposal on the changes of transect lines for dolphin monitoring was approved by EPD on

          28 July 2017 (Reference number: (19) in EP2/G/A/129 Pt. 8).