Item 1. Existing trees on boundary of the Project Area have been protected carefully during construction.
5-12-2014
Item 4. Hydro-seeding provided at stockpile.
5-12-2014
Item 5. Hoarding around works area.
5-12-2014
Item 7. Ensure no run-off into water body.
12-12-2014
Item 1. Existing trees on boundary of the Project Area have been protected carefully during construction.
12-12-2014
Item 4. Hydro-seeding or sheeting provided at stockpile.
12-12-2014
Item 5. Hoarding around works area.
12-12-2014
Item 7. Ensure no run-off into water body.
19-12-2014
Item 1. Existing trees on boundary of the Project Area have been protected carefully during construction.
19-12-2014
Item 4. Sheeting of soil stockpile was provided.
19-12-2014
Item 5. Hoardings around works area.
19-12-2014
Item 7. Ensure no run-off into water body.
24-12-2014
Item 1. Existing trees on boundary of the Project Area have been protected carefully during construction.
24-12-2014
Item 4. Hydro-seeding or sheeting provided at stockpile.
24-12-2014
Item 5. Water Barrier with panel around works area.
24-12-2014
Item 7. Ensure no run-off into water body.