| 5-12-2014 |
|---|
| Item 1. Existing trees on boundary of the Project Area have been protected carefully during construction. |
| 5-12-2014 |
| Item 4. Hydro-seeding provided at stockpile. |
| 5-12-2014 | |
| Item 5. Hoarding around works area. | |
| 5-12-2014 | |
| Item 7. Ensure no run-off into water body. |
| 12-12-2014 | |
| Item 1. Existing trees on boundary of the Project Area have been protected carefully during construction. | |
| 12-12-2014 | |
| Item 4. Hydro-seeding or sheeting provided at stockpile. | |
| 12-12-2014 |
|---|
| Item 5. Hoarding around works area. |
| 12-12-2014 |
| Item 7. Ensure no run-off into water body. |
| 19-12-2014 |
|---|
| Item 1. Existing trees on boundary of the Project Area have been protected carefully during construction. |
| 19-12-2014 |
| Item 4. Sheeting of soil stockpile was provided. |
| 19-12-2014 | |
| Item 5. Hoardings around works area. | |
| 19-12-2014 | |
| Item 7. Ensure no run-off into water body. |
| 24-12-2014 |
|---|
| Item 1. Existing trees on boundary of the Project Area have been protected carefully during construction. |
| 24-12-2014 |
| Item 4. Hydro-seeding or sheeting provided at stockpile. |
| 24-12-2014 |
|---|
| Item 5. Water Barrier with panel around works area. |
| 24-12-2014 |
| Item 7. Ensure no run-off into water body. |