Contract No. HY/2013/12 – Tuen Mun - Chek Lap Kok Link - Northern Connection Toll Plaza and Associated Works

AUES

12th Monthly Environmental Monitoring and Audit (EM&A) Report – October 2015 Table N-1 Statistical Summary of Environmental Exceedance

Table N-2 Statistical Summary of Environmental Complaints

Reporting Period Environmental Aspect / Parameter Environmental Performance Event Exceedance
Reporting Period Cumulative since project commencement
Air Quality – Action Level 0 4
October 1-hour TSP Limit Level 0 0
2015 Air Quality – 24-hour TSP Action Level 0 0
Limit Level 0 0

Table N-3 Statistical Summary of Environmental Summons

Reporting Period Environmental Complaint Statistics
Cumulative Complaint Nature
Frequency Air Noise Water
October 2015 0 3 NA NA 3
Cumulative since project commencement 0 3 NA NA 3

Table N-4 Statistical Summary of Environmental Prosecution

Reporting Period Environmental Summons Statistics
Cumulative Complaint Nature
Frequency Air Noise Water
October 2015 0 0 NA NA NA
Cumulative since project commencement 0 0 NA NA NA
Reporting Period Environmental Prosecution Statistics
Cumulative Complaint Nature
Frequency Air Noise Water
October 2015 0 0 NA NA NA
Cumulative since project commencement 0 0 NA NA NA

Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Monthly EM&A Report\October 2015\R0144v2.docx