Contract No. HY/2013/12 – Tuen Mun - Chek Lap Kok Link - Northern Connection Toll Plaza and Associated Works
Unit Concentrattion (%)
Measurement Result Action Level Limit Level
25 20 15 10 5 0
Unit Concentrattion (%)
Unit Concentrattion (%)
| 22.0 | Measurement Result | Action Level | Limit Level |
| 21.0 | |||
| 20.0 | |||
| 19.0 | |||
| 18.0 | |||
| 17.0 | |||
| 16.0 | |||
| 1.6 | Measurement Result | Action Level | Limit Level |
| 1.4 | |||
| 1.2 | |||
| 1.0 | |||
| 0.8 | |||
| 0.6 | |||
| 0.4 | |||
| 0.2 | |||
| 0.0 |
Annotation: During 1 August to 30 November 2015, major construction activity was construction of retaining wall F and the specified works included excavation, rock breaking, blinding, formworking, steel-fixing and concreting. The weather condition varied from sunny to rainy. The monitoring data was provided by the Contractor followed to their QA/QC control.
Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Monthly EM&A Report\November 2015\R0155v2.docx
Contract No. HY/2013/12 – Tuen Mun - Chek Lap Kok Link - Northern Connection Toll Plaza and Associated Works
13th Monthly Environmental Monitoring and Audit (EM&A) Report –November 2015
Unit Concentrattion (%)
Unit Concentrattion (%) Unit Concentrattion (%)
1.6
1.4
1.2
0.8
0.6
0.4
Measurement Result Action Level Limit Level
25 20 15 10 5 0
Measurement Result Action Level Limit Level 22 21 20 19 18 17 16
Measurement Result Action Level Limit Level
1
0.2 0
Annotation: During 1 August to 30 November 2015, major construction activity was construction of retaining wall B and the specified works included excavation, rock breaking, blinding, formworking, steel-fixing and concreting. The weather condition varied from sunny to rainy. The monitoring data was provided by the Contractor followed to their QA/QC control.
Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Monthly EM&A Report\November 2015\R0155v2.docx