Contract No. HY/2013/12 Tuen Mun -Chek Lap Kok Link -Northern Connection Toll Plaza and Associated Works

AUES

18th Monthly Environmental Monitoring and Audit (EM&A) Report April 2016

Table N-1 Statistical Summary of Environmental Exceedance

Reporting Period Environmental Aspect / Parameter Environmental Performance Event Exceedance
Reporting Period Cumulative since project commencement
Air Quality Action Level 0 4
Apr 2016 1-hour TSP Limit Level 0 0
Air Quality 24-hour TSP Action Level 0 0
Limit Level 0 0

Table N-2 Statistical Summary of Environmental Complaints

Table N-3 Statistical Summary of Environmental Summons

Reporting Period Environmental Complaint Statistics
Complaint Nature
Frequency Cumulative Air Noise Water
Apr 2016 1 4 1 NA 3
Cumulative since project commencement 4 4 1 NA 3

Table N-4 Statistical Summary of Environmental Prosecution

Reporting Period Environmental Summons Statistics
Complaint Nature
Frequency Cumulative Air Noise Water
Apr 2016 0 0 NA NA NA
Cumulative since project commencement 0 0 NA NA NA
Reporting Period Environmental Prosecution Statistics
Complaint Nature
Frequency Cumulative Air Noise Water
Apr 2016 0 0 NA NA NA
Cumulative since project commencement 0 0 NA NA NA

Remark:Investigation report for the complaint is underway by the ET and it will be attached in the upcoming Monthly EM&A Report.

Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Monthly EM&A Report\2016\April 2016\R0190v2.docx