Contract No. HY/2013/12 – Tuen Mun - Chek Lap Kok Link - Northern Connection Toll Plaza and Associated Works

AUES

23rd Monthly Environmental Monitoring and Audit (EM&A) Report – September 2016 Table N-1 Statistical Summary of Environmental Exceedance

Table N-2 Statistical Summary of Environmental Complaints

Reporting Period Environmental Aspect / Parameter Environmental Performance Event Exceedance
Reporting Period Cumulative since project commencement
Air Quality – Action Level 0 4
September 2016 1-hour TSP Limit Level 0 0
Air Quality – 24-hour TSP Action Level 0 0
Limit Level 0 0

Table N-3 Statistical Summary of Environmental Summons

Reporting Period Environmental Complaint Statistics
Cumulative Complaint Nature
Frequency Air Noise Water
September 2016 0 6 1 NA 6
Cumulative since project commencement 6 6 1 NA 6

Table N-4 Statistical Summary of Environmental Prosecution

Reporting Period Environmental Summons Statistics
Cumulative Complaint Nature
Frequency Air Noise Water
September 2016 0 0 NA NA NA
Cumulative since project commencement 0 0 NA NA NA
Reporting Period Environmental Prosecution Statistics
Cumulative Complaint Nature
Frequency Air Noise Water
September 2016 0 0 NA NA NA
Cumulative since project commencement 0 0 NA NA NA

Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Monthly EM&A Report\2016\September 2016\R0244v2.docx