Contract No. HY/2013/12 Tuen Mun - Chek Lap Kok Link - Northern Connection Toll Plaza and Associated Works

AUES

4th Quarterly Environmental Monitoring and Audit Summary Report – (August to October 2015)

Annotation: During 1 July to 31 October 2015, major construction activity was construction of retaining wall F and the specified works included excavation, rock breaking, blinding, formworking, steel-fixing and concreting. The weather condition varied from sunny to rainy. The monitoring data was provided by the Contractor followed to their QA/QC control.

Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Quaterly EM&A Report\4th (Aug to Oct 15)\R0150v2.docx

Contract No. HY/2013/12 Tuen Mun - Chek Lap Kok Link - Northern Connection Toll Plaza and Associated Works

AUES

4th Quarterly Environmental Monitoring and Audit Summary Report – (August to October 2015)

Annotation: During 1 July to 31 October 2015, major construction activity was construction of retaining wall B and the specified works included excavation, rock breaking, blinding, formworking, steel-fixing and concreting. The weather condition varied from sunny to rainy. The monitoring data was provided by the Contractor followed to their QA/QC control.

Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Quaterly EM&A Report\4th (Aug to Oct 15)\R0150v2.docx