Contract No. HY/2013/12 Tuen Mun -Chek Lap Kok Link -Northern Connection Toll Plaza and Associated Works
AUES
9th Quarterly Environmental Monitoring and Audit Summary Report – (November 2016 to January 2017)
Annotation: During this reporting period, major construction activity at TD1 and the specified works included excavation, stitching, blinding, formworking, steel-fixing and concreting. The weather condition varied from sunny to rainy. The monitoring data was provided by the Contractor followed to their QA/QC control. |
---|
Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Quaterly EM&A Report\9th (Nov 16 to Jan 17)\R0273v2.docx
Contract No. HY/2013/12 Tuen Mun -Chek Lap Kok Link -Northern Connection Toll Plaza and Associated Works
AUES
9th Quarterly Environmental Monitoring and Audit Summary Report – (November 2016 to January 2017)
Annotation: During this reporting period, major construction activity at Lung Mun Road and the specified works included excavation, blinding, formworking, steel-fixing and concreting. The weather condition varied from sunny to rainy. The monitoring data was provided by the Contractor followed to their QA/QC control. |
---|
Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Quaterly EM&A Report\9th (Nov 16 to Jan 17)\R0273v2.docx