Contract No. HY/2013/12 Tuen Mun -Chek Lap Kok Link -Northern Connection Toll Plaza and Associated Works

AUES

10th Quarterly Environmental Monitoring and Audit Summary Report (February to April 2017)

Annotation: During this reporting period, major construction activity at TD1 and the specified works included excavation, stitching, blinding, formworking, steel-fixing and concreting. The weather condition varied from sunny to rainy. The monitoring data was provided by the Contractor followed to their QA/QC control.

Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Quaterly EM&A Report\10th (Feb to Apr 17)\R0288v2.docx

Contract No. HY/2013/12 Tuen Mun -Chek Lap Kok Link -Northern Connection Toll Plaza and Associated Works

AUES

10th Quarterly Environmental Monitoring and Audit Summary Report (February to April 2017)

Annotation: During this reporting period, major construction activity at Lung Mun Road and the specified works included excavation, blinding, formworking, steel-fixing and concreting. The weather condition varied from sunny to rainy. The monitoring data was provided by the Contractor followed to their QA/QC control.

Z:\Jobs\2014\TCS00715(HY-2013_12)\600\Quaterly EM&A Report\10th (Feb to Apr 17)\R0288v2.docx