Appendix A –Monthly Waste Flow Table

Monthly Summary Waste Flow Table for 2017 (year)

Month Annual Quantities of Inert C&D Materials Generated Monthly Annual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals (see note 4) Paper / cardboard packaging (see note 4) Plastics & Rubber (see note 2) Chemical Waste Others (general refuse)
(in ‘000m3) (in ‘000m3) (in ‘000m3) (in ‘000m3) (in ‘000m3) (in ‘000m3) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000m3)
Jan 13.334 0.000 4.543 7.512 1.062 0.000 0.000 0.000 0.000 0.000 0.217
Feb 14.323 0.000 1.066 10.617 2.566 0.000 0.000 0.000 0.000 0.000 0.074
Mar 18.707 0.000 2.116 12.844 3.413 0.000 0.000 0.000 0.000 0.000 0.334
Apr 10.839 0.000 2.291 7.287 1.099 0.000 0.000 0.000 0.000 0.000 0.162
May
June
Sub-total 57.203 0.000 10.016 38.260 8.140 0.000 0.000 0.000 0.000 0.000 0.787
July
Aug
Sept
Oct
Nov
Dec
Total 57.203 0.000 10.016 38.260 8.140 0.000 0.000 0.000 0.000 0.000 0.787

Notes: 1 The waste flow table shall also include C&D materials that are specified in the contract to be imported for use at the Site. 2 Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging materials. 3 Broken concrete for recycling into aggregates.