Contract Noo. HY/2013/1 2 Tuen Mun --Chek Lap KKok Link - Noorthern Connnection Toll PPlaza and Associated Workks

AAUES

11th Quarterlly Environmenntal Monitoringg and Audit Suummary Report – (May to Juuly 2017)

Annotati During t excavati varied fr QA/QC ion: this reporting on, stitching rom sunny to control. g period, maj g, blinding, fo o rainy. The m jor construct ormworking, monitoring d tion activity a , steel-fixing data was prov at TD1 and t g and concret vided by the he specified ting. The w Contractor f works inclu weather cond followed to th ded ition heir

Z:\Jobs\20114\TCS00715(HYY-2013_12)\600\QQuaterly EM&A RReport\11th (Mayy to Jul 17)\R03323v2.docx

Contract Noo. HY/2013/1 2 Tuen Mun --Chek Lap KKok Link - Noorthern Connnection Toll PPlaza and Associated Workks

AAUES

11th Quarterlly Environmenntal Monitoringg and Audit Suummary Report – (May to Juuly 2017)

Annotati During t included varied fr QA/QC ion: this reporting d excavation, rom sunny to control. g period, maj , blinding, fo o rainy. The m jor construct ormworking, monitoring d tion activity a steel-fixing data was prov at Lung Mun and concreti vided by the n Road and th ing. The we Contractor f he specified weather condi followed to th works tion heir

Z:\Jobs\20114\TCS00715(HYY-2013_12)\600\QQuaterly EM&A RReport\11th (Mayy to Jul 17)\R03323v2.docx