AUES Job No.: TCS01137/20

 

 

 

 

 

 

 

 

 

Tuen Mun - Chek Lap Kok Link

Contract No. HMWSD 2/2020 (HY) ¡V

Establishment of Landscape Softworks for the Tuen Mun - Chek Lap Kok Link

 

 

 

 

 

 

 

 

 

 

8th Monthly Environmental Monitoring and Audit (EM&A) Report¡V November 2021

 

 

 

 

 

 

 

 

 

 

Prepared For

Hong Kong Landscaping Co., Ltd.

 

 

 

 

 

 

 

 

 

 

 

 

 

Date

Reference No.

Prepared By

Certified By

27 May 2022

TCS01137/20/600/R0013v2

My signature

Martin Li

(Environmental Consultant)

Ben Tam

 (Environmental Team Leader)

 

Version

Date

Remarks

1

22December 2021

First Submission

2

27 May 2022

Amended according to the IEC¡¦s comment on 27 May 2022

 

 

 

 

 

 

 


 

 

 

 

 

EXECUTIVE SUMMARY

ES01       This is the 8th Monthly EM&A Report presenting the monitoring results and inspection findings under the Contract HMWSD 2/2020 (HY) for the period from 1 to 30 November 2021 (hereinafter ¡¥the Reporting Period¡¦).

 

Summary of EM&A activities for the Reporting Period

ES02       The EM&A activities conducted in the Reporting Period under this Contract are summary in below:-

Ÿ     Landscape & Visual Monitoring (Establishment period) ¡V2 events

           

ES03       The Establishment Period monitoring once per three months for planting works was commenced on 1 June 2020 for the planting area under the contract HY/2012/07 & HY/2013/12 and commenced on 1 February 2021 for the planting area under the according to the EM&A manual requirement. One establishment period inspection was conducted by this contract during this reporting period for the planting area HY/2012/07 (Zone 1, 3 & 4) & HY/2013/12 separately. Moreover, one establishment period inspection was conducted by the ET of the contract HY/2017/10 for the planting area HY/2012/07 (Zone 2) during this reporting period.

 

Environmental Complaint

ES04       In the Reporting Period, no environmental complaint was received.

 

ES05       The statistical summary of environmental complaints is summarized in the following table.

Reporting Period

Environmental Complaint Statistics

Frequency

Cumulative

Since the Contract commencement

0

0

November 2021

0

0

 

Notification of Summons and Successful Prosecutions

ES06       No environmental summons or successful prosecutions were recorded in the Reporting Period.

 

Reporting Change

ES07       No reporting changes were made in the Reporting Period.

 

Future Key Issues

ES08       The Project TM-CLKL had been commissioning at the end of 2020 and the major construction works under the Project had been completed at the end of March 2021.  According to the Project EM&A Manual requirement, operational phase EM&A works will be undertaken for a period of two years after the commission of the project

 

ES09       According to the Project EM&A Manual requirement, monitoring for the planting works at a frequency of 3 months interval during the 24-month establishment period is required to make sure the establishment planting works is complied with EMIS requirement, and during the 12-month establishment period, the maintenance operations must be supervised by fully qualified Landscape Resident Site Staff (Registered Landscape Architect or Professional Member of the Hong Kong Institute of Landscape Architects).  Subsequent to the 12-month establishment period supervised by the qualified Landscape Resident Site Staff, the supervision from the 13th to the 24th month would be continued by other members of the Project.

 


 

ES10       According to the contract arrangement, the establishment planting area under the Contract HY/2012/07 Zone 1, 3 & 4 and the Contract HY/2013/12 were handover to this contract from December 2020 and June 2021 separately. For the establishment planting area under the Contract HY/2012/07 Zone 2, it was handed over to the ET of Contact HY/2017/10. Therefore, the establishment planting inspection and maintenance works for the establishment planting area under the Contract HY/2012/07 Zone 1, 3 & 4 and the Contract HY/2013/12 responded from this Contract was commenced from December 2020 and June 2021.

 


Table of Contents

1     Introduction                                                                                                                     1

1.1            Project Background                                                                                       1

1.2            Report Structure                                                                                             1

1.3            Contract Organization                                                                                 1

2     Summary of Monitoring Requirements Under the Contract                2

2.1            General                                                                                                                 2

2.2            Environmental Aspects                                                                                  2

2.3            Monitoring Schedule                                                                                     4

3     LandscAPe and Visual                                                                                                    5

3.1            General                                                                                                                 5

4     Environmental Complaint and Non-compliance                                           6

4.1            Environmental Complaint, Summons and Prosecution                   6

5     Conclusions and Recommendations                                                                     7

5.1            Conclusions                                                                                                        7


 

List of TABLES

Table 2-1      Summary of Establishment inspection for the Project

Table 3-1      Details of Establishment Inspection for the Project during the Reporting Period

Table 4-1      Statistical Summary of Environmental Complaints

Table 4-2      Statistical Summary of Environmental Summons

Table 4-3      Statistical Summary of Environmental Prosecution

 

 

 

List of Appendices

Appendix A  Project Layout Plan

Appendix B Layout Plan of the Contract

Appendix C  Organization of the Contract

Appendix D Event and Action Plan

Appendix E  Monitoring Schedule 

Appendix F Checklist for Establishment Works Monitoring

Appendix G Environmental Mitigation and Enhancement Measures Implementation Schedule (EMIS)

Appendix H Cumulative Statistics on Exceedance and Complaint

 

 


1                    Introduction

1.1                       Project Background

1.1.1                 According to the findings of the Northwest New Territories (NWNT) Traffic and Infrastructure Review conducted by the Transport Department, Tuen Mun Road, Ting Kau Bridge, Lantau Link and North Lantau Highway would be operating beyond capacity after 2016. This forecast has been based on the estimated increase in cross boundary traffic, developments in the Northwest New Territories (NWNT), and possible developments in North Lantau, including the Airport developments, the Lantau Logistics Park (LLP) and the Hong Kong ¡V Zhuhai ¡V Macao Bridge (HZMB). In order to cope with the anticipated traffic demand, two new road sections between NWNT and North Lantau ¡V Tuen Mun ¡V Chek Lap Kok Link (TM-CLKL) and Tuen Mun Western Bypass (TMWB) are proposed. 

 

1.1.2                 Hong Kong Landscaping Co., Ltd. (hereafter ¡§HKL¡¨) is commissioned by the Highways Department (HyD) as the Main Contractor of the Contract No. HMWSD 2/2020 (HY) ¡VEstablishment of Landscape Softworks for the Tuen Mun - Chek Lap Kok Link ((hereafter ¡§the Contract¡¨) and this Contract is part of the Tuen Mun ¡V Chek Lap Kok Link (TM-CLK Link Project).TM-CLK Link Project is a Designated Project under Environmental Permit number EP-354/2009/D issued on 13 March 2015.  The layout Plan of the Project and the Contract are showed in Appendix A and B respectively.

 

1.1.3                 The construction works of the Contract mainly include:-

a.              Maintenance the approx. 33ha planting area of the Project during the establishment period.

 

1.1.4                 The TM-CLKL had been commissioning at the end of 2020 and the major construction works under the Project had been completed at the end of March 2021.  According to the Project EM&A Manual requirement, operational phase EM&A works will be undertaken for a period of two years after the commission of the project.

 

1.1.5                 This is 8th monthly EM&A report under the Contract HMWSD 2/2020 (HY) presenting the monitoring results and inspection findings for period from 1 to 30 November 2021.

 

1.2                       Report Structure

1.2.1                 The Monthly Environmental Monitoring and Audit (EM&A) Report is structured into the following sections:-

Section 1     Introduction

Section 2     Summary of Monitoring Requirements under the Contract

Section 3     Landscape and Visual

Section 4     Environmental Complaints and Non-Compliance

Section 5     Conclusions and Recommendations

 

1.3                       Contract Organization

1.3.1                 The Contract organization and contact details of key personnel are shown in Appendix C.

 


 

2                    Summary of Monitoring Requirements Under the Contract

2.1                       General

2.1.1                 In accordance with the Project EM&A Manual requirements, the environmental aspects under the Project shall be included air quality, ecological, cultural heritage, landscape and visual, landfill gas and site inspection. 

 

2.1.2                 A summary of EM&A requirements under the contract are presented in the sub-sections below. Should non-compliance of the environmental quality criteria occurs, remedial actions will be triggered according to the Event and Action Plan which presented in Appendix D.

 

2.2                       Environmental Aspects

Air

2.2.1                 According to the Contract nature is maintenance the planting area of the Project during the establishment period in the operational phase. No specific EM&A requirement for air quality related to the establishment of landscape softworks was identify.

 

2.2.2                 The scopes of works under this Contract do not involve any of works listed under Section 4.4.1.1 of the approved EIA Report. Vehicles travel under this contract was carried out in paved area. Therefore, fugitive dust emission from the contract would be limited and no unacceptable air quality impact would be expected. No specific mitigation measure and monitoring would be required.

 

Noise

2.2.3                 According to the Contract nature is maintenance the planting area of the Project during the establishment period in the operational phase. No unacceptable noise impact would be expected from the contract. No mitigation measure would be required under the approved EIA Report. No specific EM&A requirement for noise impact related to the establishment of landscape softworks was identify.

 

2.2.4                 Most of the works under this contract would be conducted manually, with limited use of PME for delivery material on site and watering the planting area along the road side. Therefore, no unacceptable noise impact would be expected. No specific mitigation measure and monitoring would be required.

 

Water Quality

2.2.5                 According to the Contract nature is maintenance the planting area of the Project during the establishment period in the operational phase. No specific EM&A requirement for water quality related to the establishment of landscape softworks was identify.  

 

2.2.6                 All planting area under this contract area are land-based, no major discharge would be expected from the establishment planting maintenance works. Therefore, no direct or indirect impact on marine water quality would be expected. No specific mitigation measure and monitoring would be required.

 

Ecology

2.2.7                 According to the Contract nature is maintenance the planting area of the Project during the establishment period in the operational phase. No specific EM&A requirement for ecology related to the establishment of landscape softworks was identify.

 

2.2.8                 No site clearance and associated habitat loss would be required under this contract. Moreover, all planting area under this contract area are land-based, no direct or indirect impact on the marine ecology would be expected. Therefore, no specific mitigation measure and monitoring would be required.

 

Landscape and Visual

2.2.9                 Monitoring of the planting works during the 24-month Establishment period after completion of the construction works should be carried out. Establishment Works Inspection should be carried out once every 3 months to make sure the establishment planting works is complied with EMIS requirement. For the planting area under the Contract HY/2012/07, the first 6-month establishment period inspection and maintenance will be taken by the original Contract¡¦s ET and the main Contractor under the contract. For another Contract HY/2013/12 and HY/2017/10, the first 12-month establishment period inspection and maintenance will be taken by the original Contract¡¦s ET and the main Contractor under the contract. After the first 6 month or year establishment period, the maintenance and inspection works will be handover to the contract HMWSD 2/2020 (HY) except the planting area under the Contract HY/2012/07 Zone 2. The summary of Establishment inspection for the Project is shown in Table 2-1.

 

Table 2-1    Summary of Establishment inspection for the Project

Contract Area

Establishment Monitoring Commenced

Inspection taken under the contract HMWSD 2/2020 (HY)

Next Quarter of Establishment Monitoring

HY/2012/07

(Zone 1, 3 & 4)

June 2020

December 2020

December 2021 to February 2022 (7th Quarter)

HY/2012/07

(Zone 2)

June 2020

TBA

December 2021 to February 2022 (7th Quarter)

HY/2013/12

June 2020

June 2021

December 2021 to February 2022 (7th Quarter)

HY/2017/10

February 2021

TBA

November 2021 to January 2022 (4th Quarter)

 

Cultural Heritage

2.2.10             According to the Contract nature is maintenance the planting area of the Project during the establishment period in the operational phase. No specific EM&A requirement for cultural heritage related to the establishment of landscape softworks was identify.

 

2.2.11             No major structural or civil work would be conducted under this contract. Moreover, all planting area are set back from the cultural heritage zone Grave G1 more than 10m. Therefore, no cultural heritage impact would be expected under this contract. No mitigation measure and monitoring would be required.

 

Landfill Gas

2.2.12             According to the Contract nature is maintenance the planting area of the Project during the establishment period in the operational phase. No specific EM&A requirement for landfill gas related to the establishment of landscape softworks was identify.

 

2.2.13             No major excavation work would be conducted under this contract. Only minor hand digging works will be conducted while tree replacement works. Therefore, no landfill gas hazard would be expected under this contract. No mitigation measure and monitoring would be required.

 

Waste Management

2.2.14             According to the Contract nature is maintenance the planting area of the Project during the establishment period in the operational phase. No specific EM&A requirement for Waste Management related to the establishment of landscape softworks was identify.

 

2.2.15             All planting area under this contract area are land-based, no dredged sediment, excavated C&D material, C&D waste, chemical waste and sewage would be generated under this Contract. Only limited level of dead plant would be generated from works during maintenance of the planting area and would be easily controlled by standard waste management practice. No specific mitigation measure would be required.

 

Inspection and Audit

2.2.16             According to the Contract nature is maintenance the planting area of the Project during the establishment period in the operational phase. No construction works would be taken under this contract. Moreover, no potential environmental issue had been identified in the previous sections. No regular site inspections would be required.

 

2.3                       Monitoring Schedule

2.3.1                 The monitoring schedule for landscape &visual for the present reporting period is presented in Appendix E.

 


 

3                    LandscAPe and Visual

3.1                       General

3.1.1                 According to the Project EM&A Manual requirement, monitoring for the planting works at a frequency of 3 months interval during the 24-month establishment period is required to make sure the establishment planting works is complied with EMIS requirement, and during the 12-month establishment period, the maintenance operations must be supervised by fully qualified Landscape Resident Site Staff (Registered Landscape Architect or Professional Member of the Hong Kong Institute of Landscape Architects).  Subsequent to the 12-month establishment period supervised by the qualified Landscape Resident Site Staff, the supervision from the 13th to the 24th month would be continued by other members of the Project. The updated EMIS for the Contract is shown in Appendix G.

 

3.1.2                 According to the contract arrangement, the establishment planting area under the Contract HY/2012/07 Zone 1, 3 & 4 and the Contract HY/2013/12 were handover to this contract from December 2020 and June 2021 separately. For the establishment planting area under the Contract HY/2012/07 Zone 2, it was handed over to the ET of Contact HY/2017/10. Therefore, the establishment planting inspection and maintenance works for the establishment planting area under the Contract HY/2012/07 Zone 1, 3 & 4 and the Contract HY/2013/12 responded from this Contract was commenced from December 2020 and June 2021.

 

3.1.3                 All the establishment inspection method including checklist and zoning plan under this Contract was follow the methodology prepared by original Contract¡¦s ET which approved by EPD

 

3.1.4                 In the Reporting Period, one establishment period inspection was conducted for the planting area HY/2012/07 & HY/2013/12 separately. The details of Establishment inspection for the Project during the reporting period are shown in Table 3-1 and the Establishment inspection checklist is shown in Appendix F.

 

Table 3-1    Details of Establishment Inspection for the Project during the Reporting Period

Planting Area

Respond Party

Quarter of Establishment Monitoring

Inspection Date

HY/2012/07

(Zone 1, 3 & 4)

ET of the Contract HMWSD 2/2020 (HY)

September to November 2021 (6th Quarter)

23 November 2021

HY/2012/07

(Zone 2)

ET of the Contract HY/2017/10

September to November 2021 (6th Quarter)

8 November 2021

HY/2013/12

ET of the Contract HMWSD 2/2020 (HY)

September to November 2021 (6th Quarter)

16 November 2021

HY/2017/10

ET of the Contract HY/2017/10

NA

NA

 


 

4                    Environmental Complaint and Non-compliance

4.1                       Environmental Complaint, Summons and Prosecution

4.1.1                 In the Reporting Period, no environmental complaint, summons and prosecution under the EM&A Programme was lodged. 

 

4.1.2                 The statistical summary table of environmental complaint, summons and prosecution are presented in Tables 4-1, 4-2 and 4-3.

 

Table 4-1      Statistical Summary of Environmental Complaints

Reporting Period

Environmental Complaint Statistics

Frequency

Cumulative

Complaint Nature

Air

Noise

Water

Others

November 2021

0

0

NA

NA

NA

NA

 

Table 4-2      Statistical Summary of Environmental Summons

Reporting Period

Environmental Summons Statistics

Frequency

Cumulative

Complaint Nature

Air

Noise

Water

November 2021

0

0

NA

NA

NA

 

Table 4-3      Statistical Summary of Environmental Prosecution

Reporting Period

Environmental Prosecution Statistics

Frequency

Cumulative

Complaint Nature

Air

Noise

Water

November 2021

0

0

NA

NA

NA

 

4.1.3                 In the Reporting Period, no warning letter related to environmental issue was received from the EPD or HyD.

 

 


 

5                    Conclusions and Recommendations

5.1                       Conclusions

5.1.1                 This is 8th monthly EM&A report presenting the monitoring results and inspection findings under the Contract HMWSD 2/2020 (HY) for the period of 1 to 30 November 2021.

 

5.1.2                 There is no air quality, noise, water quality, ecology, cultural heritage and landfill gas monitoring was required for the contract.

 

5.1.3                 The Establishment Period monitoring once per three months for planting works was commenced on 1 June 2020 for the planting area under the contract HY/2012/07 & HY/2013/12 and commenced on 1 February 2021 for the planting area under the according to the EM&A manual requirement. One establishment period inspection was conducted by this contract during this reporting period for the planting area HY/2012/07 (Zone 1, 3 & 4) & HY/2013/12 separately. Moreover, one establishment period inspection was conducted by the ET of the contract HY/2017/10 for the planting area HY/2012/07 (Zone 2) during this reporting period.

 

5.1.4                 According to the contract arrangement, the establishment planting area under the Contract HY/2012/07 Zone 1, 3 & 4 and the Contract HY/2013/12 were handover to this contract from December 2020 and June 2021 separately. Therefore, the establishment planting inspection and maintenance works for those areas responded from this Contract was commenced from December 2020 and June 2021.

 

5.1.5                 In the Reporting Period, no environmental complaint was received.

 

5.1.6                 No notifications of summons, or successful prosecution were received during the Reporting Period.