TABLE OF CONTENT

 

1.?? INTRODUCTION

1.1?? Background

1.2?? Objectives of this Submission

1.3?? Scope of this Submission

2.?? DESIGN CODES AND CONSIDERATIONS

2.1?? Design Codes and General Considerations

2.2?? Landscape and Visual Design Measures in EIA & EM&A

3.?? DESCRIPTION OF DESIGN MEASURES

3.1?? Landscape and Visual Design Measures

3.1.1??????? Aesthetic design on the viaducts

3.1.2??????? Night-time lighting control

4.?? SUMMARY

 

?

LIST OF FIGURES

 

FIGURE NO.??? TITLE

1????????????????????? General Layout of Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road (HKLR)

2????????????????????? Photomontage of Proposed HKLR viewed from Sha Lo Wan

3????????????????????? Photomontage of Proposed HKLR viewed from hiking trail near San Tau

4????????????????????? Proposed road lighting and pilecap lighting

5????????????????????? Photomontage of proposed light poles

 

LIST OF APPENDICES

 

APPENDIX NO.?????? TITLE

APPENDIX A?????????? Approval in Principle Submission for Landscape Works

 

APPENDIX B?????????? ??????? ACABAS Submission (Ref: HKLR9/DCV/PG/000024), submitted on 4 July 2012

???????????????????????????????? ???? ?? ACABAS Submission (Ref: HKLR9/DCV/PG/000024B), submitted on 2 Jan 2013

 

Appendix C??????????? ??????? Soft Landscape Plan Ver.? C

??????????????????????????????? ????? ?? The certifying letter from the Environmental Team

??????????????????????????????? ????? ??The verifying letters from the Independent Environmental Checker

??????????????????????????????? ????? ?? Emails from AAHK confirming the finalized as-built landscape arrangement including compensatory tree planting.

 

Appendix D??????????? ??????? Overall Mitigation Measure Plan (Design Stage)

???????????????????????????????? ???? ?? Overall Mitigation Measure Plan (Construction Stage)

???????????????????????????????? ???? ?? Overall Mitigation Measure Plan (Operation Stage)

???????????????????????????????? ???? ?? Design Phase Mitigation Measure Plan (Item 1, 3, 4, 6 & 8)

???????????????????????????????? ???? ?? Construction Phase and Operation Phase Mitigation Measures Plan (G5, G6 & G7)