Table of Contents

 

 

1        INTRODUCTION

           1.1     Purpose

           1.2     Scope of the Plan

           1.3     Description of Works

 

2        PLANNING ON REGULAR MARINE TRAVEL ROUTES

           2.1     Construction Works involves the Marine Travel Routes

           2.2     Design Criteria of Regular Marine Travel Routes (RMTR) 5

           2.3     Selected Regular Marine Travel Routes  6

 

3        IMPLEMENTATION AND MONITORING

           3.1     Supervision Staff

           3.2     Method of Implementation and Monitoring  7

           3.3     Precautionary Measures  7

 

4        SUMMARY AND CONCLUSION   9

 

Figures

-Figure 1: Regular Marine Travel Route

-Figure 2: Marine Travel Route for Materials Delivery
-Figure 3: Existing Fairway Plan

-Figure 4: Location of Floating Concrete Batching Plant

 

 

Appendix A -  Working Fleets Particulars

Appendix B -   Engineer’s Representative Instruction Letter

Appendix C -  Airport Authority Hong Kong’s Consent Letter