Appendix
A Contract Division and
Scope of Works for Hong Kong Boundary Crossing Facilities
Contract No. |
Environmental Team Leader (ETL) |
Independent Environmental Checker (IEC) |
Scope of Works |
Involvement of Landscape and Visual Mitigation
Works |
Contract
1 (C1) HY/2013/01 - HZMB HKBCF -Passenger Clearance Building |
Keith CHAU Atkins China
Limited |
Ray YAN Ramboll Hong Kong Limited |
•
Construction of a Passenger Clearance
Building (PCB) and its associated facilities, footbridges connection to the
PCB. •
Landscape
hardwork: Water features inside/ around the PCB, site furniture
outside PCB • Landscape planting work: Tree and
other planting inside/ around the PCB, vertical greening with climber to
ancillary buildings. |
✓ |
Contract
2 (C2) HY/2013/02 - HZMB HKBCF -Infrastructure Works Stage I (Western Portion) |
C. L. LAU ETS-Testconsult
Limited |
Ray YAN Ramboll Hong Kong
Limited |
•
Construction of a dual three land road and
the associated slip roads (at western side) connecting to HKBCF and the HZMB
Hong Kong Link Road. •
Landscape
hardwork: Concrete paving blocks at coaching parking areas. • Landscape planting work: At-grade
planting (Shrubs, groundcover and turf arranged in wavy layout) adjacent to
road side, some feature landscape berms (less than 3m height) and stone
swathes on planting areas |
✓ |
Contract
3 (C3) HY/2013/03
- HZMB HKBCF -Vehicle Clearance Plazas and Ancillary
Buildings and Facilities |
Arthur CHENG MateriaLab Consultants
Limited |
Ray YAN Ramboll Hong Kong Limited |
•
Construction of the ancillary buildings and
facilities, a common utilities enclosure (CUE),
Vehicle Clearance Kiosks with staff subway and some viaducts connection to
other HKBCF Contracts. •
Landscape
hardwork: Concrete paving blocks to car parking areas, site
furniture close to the PCB and an attenuation pond for irrigation system. • Landscape planting work: At-grade
planting (Trees, shrubs, ground cover and turf arranged in wavy layout)
adjacent to road side, some feature landscape berms (less than 3m height),
stone swathes on planting areas are included, roof greening and vertical
greening (with climbers) on some ancillary buildings. |
✓ |
Contract
4 (C4) HY/2013/04 - HZMB HKBCF -Infrastructure Works Stage II (Southern Portion) |
Gary CHOW Mott
MacDonald Hong Kong Limited |
Ray YAN Ramboll Hong Kong Limited |
•
Construction of vehicular bridges and
at-grade roads at southern portion of HKBCF •
Landscape
hardwork: concrete paving block works to one ancillary building. • Landscape planting work: At-grade
planting (Shrubs, ground cover and turf arranged in wavy layout) adjacent to
road side, some feature landscape berms (less than 3m height) and stone
swathes on planting areas are included. |
✓ |
Contract 5 (C5) HY/2013/05 - HZMB HKBCF and HKLR, and TM-CLKL - Traffic Control and
Surveillance System |
- |
- |
•
Design, supply, installation, testing and commissioning
of traffic control and surveillance facilities and field equipment,
Communications system, Electrical distribution system •
No landscape work is involved. |
✗ |
Contract 6 (C6) HY/2013/06 - HZMB HKBCF
-Automatic Vehicle Clearance Support System |
- |
- |
•
Design, supply, installation, testing and commissioning
of Automatic Vehicles Clearance Support System •
No landscape work is involved. |
✗ |
Contract 7 (C7) HY/2014/04 - HZMB HKBCF
-Gantry Type X-Ray Vehicle Inspection System |
- |
- |
•
Design, supply, installation, testing and commissioning
of Gantry X-ray vehicle inspection systems •
No landscape work is involved. |
✗ |
Contract
8 (C8) HY/2014/05
- HZMB HKBCF -Remaining Ancillary Buildings and
Facilities |
Keith CHAU Atkins China
Limited |
Ray YAN Ramboll Hong Kong Limited |
•
Construction of the remaining ancillary
buildings and facilities including architectural and builders works,
structural steel canopy, reinforced concrete frames, foundations, curtain
wall façade, building services and electrical and mechanical works. •
Landscape
hardwork: concrete paving block works • Landscape planting work: At-grade
planting (Shrubs and ground cover in wavy layout) adjacent to road side and
roof greening on some ancillary buildings. |
✓ |