Table 14.4 Action Plan for Landscape and Visual Works

 

EVENT

ACTION

ET

IEC

ER

CONTRACTOR

Conflicts occur

Check Contractor’s proposed remedial design conforms to the requirements of EP and prepare checking report(s)

Check and endorse ET’s report(s)

Check and certify Contractor’s proposed remedial design

Supervise the Contractor to carry out the proposed remediation work

Propose remedial design and carry out the proposed work