CONTENTS
1. INTRODUCTION
1.1 Background
1.2 Project Description
1.3 Project Organisation
1.4 Construction Programme
1.5 Construction Works undertaken during the Reporting Period
2.1 Monitoring Locations
2.2 Monitoring Requirements
2.3 Monitoring Results
3.1 Monitoring Locations
3.2 Monitoring Requirements
3.3 Monitoring Results
4.1 Monitoring Locations
4.2 Monitoring Requirements
4.3 Monitoring Results
5.1 Monitoring Locations
5.2 Monitoring Requirements
5.3 Monitoring Results
6. DISPOSAL OF MARINE SEDIMENT EXTRACTED FROM BORED PILING WORKS
6.1 Background
6.2 Dumping Arrangements
6.3 Quantity Disposed
7. ENVIRONMENTAL SITE INSPECTION AND AUDIT
7.1 Site Inspection
7.2 Advice on the Solid and Liquid Waste Management Status
7.3 Environmental Licenses and Permits
7.4 Implementation Status of Environmental Mitigation Measures
7.5 Summary of Exceedance of the Environmental Quality Performance Limit
7.6 Summary of Complaints, Notification of Summons and Successful Prosecution
8.1 Construction Programme for the Coming Months
8.2 Environmental Site Inspection Schedule for the Coming Month
9. CONCLUSIONS
APPENDICES
B Project Organization for Environmental Works
E Environmental
Licenses and Permits
F Implementation
Schedule for Environmental Mitigation Measures (EMIS)
G Statistics on
Environmental Complaints, Notification of Summons and Successful Prosecutions
FIGURES
Figure 1 Air Quality Monitoring Stations
Figure 2 Noise Monitoring Stations