1.1.1
Fugro Technical Services Limited was commissioned by China
Harbour Engineering Co. Limited (also referred to as ¡§the Contractor¡¨) to
undertake the Environmental Team (ET) services (including environmental
monitoring and audit (EM&A)) for Contract No. HY/2019/01 ¡§Hong
Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities ¡V Phase 2 and
Other Works¡¨.
1.1.2
Contract No. HY/2019/01 is part of
the ¡§Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities¡¨
(HZMB HKBCF) Project which is a ¡§Designated Project¡¨ under Schedule 2 of the
Environmental Impact Assessment (EIA) Ordinance (Cap. 499) and for which an EIA
Report (Register No. AEIAR-145/2009) was prepared and approved. The current
Environmental Permit (EP) for HKBCF, namely No. EP-353/2009/K, was issued on 11
April 2016. These documents are available through the EIA Ordinance Register.
The general layout of the Project area is shown in Figure
1. Commencement of the Contract took place on 4 December 2019
and the construction site preparation works commenced in early February 2020.
1.1.3
This is the 1st Monthly EM&A
report to document the findings of site inspection activities and EM&A
programme carried out by the Contractor of Contract No. HY/2019/01 from 5
February 2020 to 29 February 2020 (reporting period) and is submitted to fulfil
Condition 5.4 of the EP.
1.2.1
The works to be
executed under Contract No. HY/2019/01 include the following major items:
¡P Landscaping
and establishment works;
¡P Irrigation
system and associated drainage pumping system and facilities;
¡P Erection
and installation in the Passenger Clearance Building;
¡P Public
transport interchange (PTI) public toilet, satellite refuse collection point
(RCP) and observation guard booths;
¡P PTI
cross boundary shuttle (CBS) / cross boundary coach (CBC) lanes and covered
walkway;
¡P Vehicle
clearance plazas (VCP) vehicle kiosks and associate automatic vehicle clearance
supporting system (AVCSS).
1.3.1
The Project
Organization structure is shown in Appendix B. The key personnel contact names and
numbers are summarized in Table
1.1.
1.4
Construction Programme and Activities
1.4.1
The site layout
plan of the Contract is shown in Figure 1.
1.4.2
The
construction programme of this Contract is shown in Appendix A.
1.5.1
The main
construction works carried out in the reporting period were as follow:
¡P
Site Fence at
SPTI (land-based);
¡P
Recessed Cover
near building 035 (land-based);
¡P
UPS room at SPTI
and NPTI (land-based);
¡P
Minor Works near
building 062 (land-based);
¡P
Site hoarding VCP
(land-based);
¡P
Excavation at VCP
(land-based);
¡P
Road & Drain
works at SPTI and NPTI (land-based);
¡P
Vertical access
at PCB (land-based);
¡P
Site office
renovation at WA3 (land-based).
1.6
Status of Environmental Licences, Notification and
Permits
1.6.1
A summary of the
relevant permits, licenses and/or notifications on environmental protection for
this Contract is presented in Table 1.2.