TABLE OF CONTENTS
Introduction
Environmental
Monitoring and Audit Progress
Breaches
of Action and Limit Levels
Future Key
Issues
Purpose of
the report
Structure
of the report
Background
Contract Organisation
Construction
Programme
Summary of
Construction Works Undertaken During Reporting Period
Status of
Environmental Licences, Notification and Permits
3 ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
Monitoring
Parameters and Monitoring Locations
Monitoring
Methodology and Calibration Details
Environmental
Quality Performance Limits (Action and Limit Levels)
Event and
Action Plan
Implementation
Status of Environmental Mitigation Measures
Site Audit
Summary
Status of
Waste Management
4 ENVIRONMENTAL
MONITORING RESULTS
Air
Quality Monitoring Results
Noise
Monitoring Results
Water
Quality Monitoring Results
Dolphin
Monitoring (Line-transect Vessel Survey)
5 ENVIRONMENTAL
NON-CONFORMANCE (EXCEEDANCES)
Summary of
Exceedances
Summary of
Environmental Complaint
Summary of
Notification of Summons and Successful Prosecution
6 CONCLUSIONS AND
RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table I Summary
Table for Monitoring Activities in the Reporting Period
Table II Summary
Table for Events Recorded in the Reporting Period
Table
III Summary Table for Complaints Recorded
in the Reporting Period
Table 2.1 Key Contacts of the
Contract
Table 3.1 Summary of Impact
EM&A Requirements
Table 3.2a Action and Limit Levels for 1-Hour
TSP
Table 3.2b Action and Limit Levels for 24-Hour
TSP
Table 3.2c Action and Limit Levels for
Construction Noise
Table 3.2d Action and Limit Levels for Water
Quality
Table 3.2e Action
and Limit Levels for Dolphin Line Transect Monitoring
Table 4.1 Summary Table of 1-hour
TSP Monitoring Results during the Reporting Period
Table 4.2 Summary Table of
24-hour TSP Monitoring Results during the Reporting Period
Table 4.3 Observation at Dust
Monitoring Stations
Table 4.4 Summary Table of Noise
Monitoring Results during the Reporting Period
Table 4.5 Observation at Noise
Monitoring Stations
Table
5.1 Summary of Environmental Complaints in the
Reporting Period
LIST OF FIGURE
Figure 2 Project
Organisation for Environmental Works
Figure 3 Locations
of Air Quality, Noise and Wind Monitoring Stations
Figure 4 Locations of
Water Quality Monitoring Stations
LIST OF APPENDICES
Appendix A Construction
Programme
Appendix B Graphical
Presentation of 1-hour TSP Monitoring Results
Appendix C Graphical
Presentation of 24-hour TSP Monitoring Results
Appendix D Graphical
Presentation of Noise Monitoring Results
Appendix E Graphical
Presentation of Water Quality Monitoring Results
Appendix F Dolphin Monitoring Report (Line Transect)
Appendix H Updated
Environmental Mitigation Implementation Schedule
Appendix J Waste
Generation in the Reporting Month
Appendix K Summary
of Exceedance
Appendix M Summary of Successful
Prosecutions