TABLE OF
CONTENTS
Introduction
Environmental Monitoring and Audit
Progress
Breaches of Action and Limit Levels
Future Key Issues
Purpose of the report
Structure of the report
Background
Contract Organisation
Construction Programme
Summary of Construction Works Undertaken
During Reporting Period
Status of Environmental Licences, Notification and Permits
3 ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
Monitoring Parameters and Monitoring
Locations
Monitoring Methodology and Calibration
Details
Environmental Quality Performance Limits
(Action and Limit Levels)
Event and Action Plan
Implementation Status of Environmental
Mitigation Measures
Site Audit Summary
Status of Waste Management
4 ENVIRONMENTAL
MONITORING RESULTS
Air Quality Monitoring Results
Noise Monitoring Results
Water Quality Monitoring Results
Dolphin Monitoring (Line-transect Vessel
Survey)
5 ENVIRONMENTAL
NON-CONFORMANCE (EXCEEDANCES)
Summary of Exceedances
Summary of Environmental Complaint
Summary of Notification of Summons and
Successful Prosecution
6 CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF
TABLES
Table I Summary
Table for Monitoring Activities in the Reporting Period
Table II Summary
Table for Events Recorded in the Reporting Period
Table III Summary
Table for Complaints Recorded in the Reporting Period
Table 2.1 Key
Contacts of the Contract
Table 3.1 Summary
of Impact EM&A Requirements
Table 3.2a Action
and Limit Levels for 1-Hour TSP
Table 3.2b Action
and Limit Levels for 24-Hour TSP
Table 3.2c Action
and Limit Levels for Construction Noise
Table 3.2d Action
and Limit Levels for Water Quality
Table 3.2e Action
and Limit Levels for Dolphin Line Transect Monitoring
Table 4.1 Summary
Table of 1-hour TSP Monitoring Results during the Reporting Period
Table 4.2 Summary
Table of 24-hour TSP Monitoring Results during the Reporting Period
Table 4.3 Observation
at Dust Monitoring Stations
Table 4.4 Summary
Table of Noise Monitoring Results during the Reporting Period
Table 4.5 Observation
at Noise Monitoring Stations
Table 5.1 Summary
of Environmental Complaints in the Reporting Period
LIST OF
FIGURE
Figure 2 Project
Organisation for Environmental Works
Figure 3 Locations
of Air Quality, Noise and Wind Monitoring Stations
Figure 4 Locations
of Water Quality Monitoring Stations
LIST OF
APPENDICES
Appendix
A Construction
Programme
Appendix
B Graphical Presentation
of 1-hour TSP Monitoring Results
Appendix
C Graphical Presentation of 24-hour
TSP Monitoring Results
Appendix
D Graphical Presentation of Noise
Monitoring Results
Appendix
E Graphical Presentation of
Water Quality Monitoring Results
Appendix
F Dolphin
Monitoring Report (Line Transect)
Appendix
H Updated Environmental
Mitigation Implementation Schedule
Appendix J Waste Generation
in the Reporting Month