Page
TABLE OF
CONTENTS
1 |
|
1 |
1.1 |
Basic Project Information |
1 |
1.2 |
Project Organization |
2 |
1.3 |
Construction Programme |
2 |
1.4 |
Construction
Works Undertaken During the Reporting Period |
2 |
|
|
|
|
|
|
2 2.0 |
|
3 |
2.1 |
Monitoring
Locations |
3 |
2.2 |
Monitoring
Requirements |
3 |
2.3 |
Monitoring
Results |
4 |
|
|
|
3 |
5 |
|
3.1 |
Monitoring
Locations |
5 |
3.2 |
Monitoring
Requirements |
5 |
3.3 |
Monitoring
Results |
5 |
|
|
|
|
|
|
4 |
6 |
|
4.1 4.2 |
Site Inspection Advice on the Solid and Liquid Waste
Management Status |
6 |
4.3 |
Environmental Licenses and Permits |
6 |
4.4 |
Implementation Status of Environmental Mitigation
Measures |
7 |
4.5 |
Summary of Exceedance
of the Environmental Quality Performance Limit |
7 |
4.6 |
Summary of Complaints, Notification of Summons
and Successful Prosecution |
7 |
|
|
|
5 |
8 |
|
5.1 |
Construction Programme
for the Coming Months |
8 |
5.2 |
Environmental
Site Inspection Schedule for the Coming Month |
8 |
|
|
|
6 |
8 |
|
|
Conclusions |
8 |
|
||
Figure 2 |
Air Quality and Noise Monitoring Stations for
HKBCF |
|
APPENDICES |
|
|
Location of Works Areas |
||
Project Organization for Environmental Works |
||
Construction Programme |
||
Event and Action Plan |
||
Waste Flow Table |
||
Environmental Licenses and Permits |
||
Implementation Schedule for Environmental Mitigation Measures (EMIS) |
||
Statistics on Environmental Complaints, Notification of Summons and Successful Prosecutions |
||
Environmental
Site Inspection Schedule |
|
|
|
|
|
|
This Monthly Environmental
Monitoring and Audit (EM&A) Report is
prepared for Contract HY//2013/02 Hong Kong¡VZhuhai-Macao
Bridge Hong Kong Boundary Crossing Facilities (HKBCF) ¡V Infrastructure Works
Stage I (Western Portion) (hereafter referred to as ¡§the Contract¡¨) for the
Highways Department of Hong Kong Special Administrative Region (HKSAR). The
Contract was awarded to China Harbour Engineering
Co., Ltd. (hereafter referred to as ¡§the Contractor¡¨) and ETS-Testconsult Limited was appointed as the Environmental Team
(ET) by the Contractor.
The Contract is part of
ETS-Testconsult
Limited has been appointed by the Contractor to implement the Environmental
Monitoring & Audit (EM&A) programme for the
Contract in accordance with the Updated EM&A Manual for HKBCF (Version 1.0)
and provide environmental team services to the Contract.
This is the third Monthly Environmental
Monitoring and Audit (EM&A) Report for the Contract which summaries
findings of the EM&A works conducted during the reporting
period from 01 February 2015 to 28 February 2015.
Site Activities
As informed by the Contractor, site activities were
carried out in
this reporting month:
¡±
Pre-Drilling
Work at Main Site;
¡±
Bored
Piles Works at Main Site;
¡±
Secondary
site office erection at Main Site; and
¡±
Storm
& Sewer Drain Works at Main Site.
Environmental Monitoring and Audit Progress
The monthly EM&A programme
was undertaken in accordance with the Updated EM&A Manual for HKBCF
(Version 1.0). It should be noted that the air quality and noise monitoring
works for the Contract are covered by Contract No. HY/2010/02
Hong Kong-Zhuhai-
The date of site
inspection during the reporting period are listed below:
Environmental Site Inspection
03,13,17 and 24 February 2015
Breaches
of Action and Limit Levels
There was no Action and Limit Level exceedance of 1-hr TSP
level and 24-hr TSP level recorded at station AMS6 by the Environmental
Team of Contract No. HY/2011/03 during the reporting period.
There was no Action and Limit Level exceedance of 1-hr TSP
level and 24-hr TSP level recorded at station AMS7A by the Environmental
Team of Contract No. HY/2010/02 during the reporting period.
There was no Action and Limit Level exceedance for noise recorded
at station NMS2 and station NMS3B by the Environmental Team of Contract No. HY/2010/02 during the
reporting period.
Complaint Log
There was no
complaint received in relation to the environmental impact during the reporting period.
Notifications of Summons and Successful
Prosecutions
There were no
notifications of summons or prosecutions received during the reporting period.
Reporting Change
There was no reporting change in the reporting period.
Future
Key Issues
The future key
issues to be undertaken in the upcoming month are as follows:
¡±
Pre-Drilling
Work at Main Site;
¡±
Bored
Piles Works at Main Site;
¡±
Secondary
site office erection at Main Site;
¡±
Storm
& Sewer Drain Works at Main Site; and
1.1 Basic Project
Information
¡±
Construction of the
viaducts and roads at the western portion of Hong Kong Boundary Crossing
Facilities (HKBCF) mainly for connection with the Hong Kong ¡V Zhuhai ¡V Macao Bridge
(HZMB), Hong Kong Link Road (HKLR), Hong Kong International Airport (HKIA) and
the Tuen Mun-Chek Lap Kok Link (TM-CLKL);
¡±
Construction of the road modification at the SkyCity Interchange at
¡±
Construction of associated street lighting,
street furniture, road marking, road signage, drainage, sewerage, fresh water
and flushing water supply, irrigation, landscape, electrical and mechanical
(E&M), utilities and services works;
¡±
Provisioning of civil engineering works and power
supply installation for the Traffic Control and Surveillance System TCSS);
¡±
Other works in accordance with the
Contract.
1.2 Project
Organization
Table 1.1 Contact Information of Key Personnel
Party |
Position |
Name of Key Staff |
Tel. No. |
Fax No. |
Engineer or Engineer¡¦s Representative
(AECOM Asia Co. Ltd.) |
Resident Engineer |
Mr. Fred Yeung |
63308293 |
31525116 |
Environmental Project Office / Independent Environmental Checker
(Environ Hong Kong Limited) |
Environmental Project Office Leader |
Mr. Y. H. Hui |
34652888 |
34652899 |
Independent Environmental Checker |
Mr. Raymond Dai |
34652888 |
34652899 |
|
Environmental Site Supervisor |
Mr. Ray Yan |
51818165 |
34652899 |
|
Contractor (China Harbour
Engineering Co., Ltd.) |
Environmental Officer |
Mr. K. F. Wong |
93724383 |
39150300 |
Environmental Engineer |
Mr. Calvin So |
97246254 |
39150300 |
|
Environmental Supervisor |
Ms. Joy Chan |
54005086 |
39150300 |
|
Environmental Supervisor |
Ms. Selena Yang |
55122662 |
39150300 |
|
Environmental
Team (ETS-Testconsult Ltd.) |
Environmental
Team Leader |
Mr C. L. Lau |
2946
7791 |
2695
3944 |
1.3 Construction
Programme
1.4 Construction
Works Undertaken During the Reporting Period
A summary of the construction activities undertaken during this
reporting period is shown below:
¡±
Pre-Drilling
Work at Main Site;
¡±
Bored
Piles Works at Main Site;
¡±
Secondary site office erection at Main
Site; and
¡±
Storm
& Sewer Drain Works at Main Site.
2.1 Monitoring
Locations
Table 2.1 Air Quality Monitoring
Locations
Identification No. |
Location Description |
AMS6(1) |
Dragonair / CNAC (Group)
Buidling |
AMS7A(1) |
Chu Kong Air-Sea Union Transportation
Co. Ltd. |
Remarks:
(1) The ET of this Contract should
conduct impact air quality monitoring at the AMS listed in the table as part of
EM&A programme according to latest notification
from ENPO when the monitoring station(s) is/are no longer covered by another ET
of the HZMB project.
2.2 Monitoring
Requirements
Table 2.2 Action
and Limit Levels for 1-hour TSP
Monitoring Station. |
Action Level,mg/m3 |
Limit Level,mg/m3 |
AMS6 ¡V Dragnair
/ SNAC (Group) Building (HKIA) |
360 |
500 |
AMS7A ¡VChu Kong Air-Sea Union
Transportation Co. Ltd. |
370 |
500 |
Table 2.3 Action and Limit Levels for 24-hour TSP
Monitoring Station. |
Action Level,mg/m3 |
Limit Level,mg/m3 |
AMS6 ¡V Dragnair
/ SNAC (Group) Building (HKIA) |
173 |
260 |
AMS7A ¡VChu Kong Air-Sea Union
Transportation Co. Ltd. |
183 |
260 |
2.3 Monitoring Results
3.1 Monitoring Locations
Table 3.1 Construction Noise Monitoring
Locations
Identification No. |
Location Description |
NMS2(1) |
|
NMS3B(1)
(2) |
Site Boundary of Site Office Area at
Works Area WA2 |
Remarks:
(1) The ET of this Contract should
conduct impact noise monitoring at the NMS listed in the table as part of
EM&A programme according to latest notification
from ENPO when the monitoring station(s) is/are no longer covered by another ET
of the HZMB project.
(2) The Action and Limit Levels for
schools will be applied for this alternative monitoring location.
3.2 Monitoring
Requirements
Table 3.2 Action and Limit Levels for Construction Noise
Parameter |
Action Level |
Limit Level |
07:00 ¡V 19:00 hours on
normal weekdays |
When one documented
complaint is received |
75 dB(A)* |
|
Notes :
If works are to be carried out during restricted hours, the conditions stipulated in the construction noise permit issued by the Noise Control Authority have to be followed.
* Reduce
to 70
dB(A) for schools and 65 dB(A) during school examination period.
3.3 Monitoring Results
4 ENVIRONMENTAL
SITE INSPECTION AND AUDIT
4.1 Site
Inspection
4.1.1 Site Inspections were carried out on a weekly
basis to monitor the implementation of proper environmental pollution control
mitigation measures for the project. During the reporting period,site inspections were carried out on 03,13,17 and 24 February 2015.
4.1.2 Particular observations during
the site inspections are described below:
27 January 2015
(a)
Chemical bottles were observed to be stored improperly near
portion D. All chemical bottles were stored inside a chemical
container. This observation was closed on 03 February 2015.
03 February 2015
(a) No observation
was made.
13 February 2015
(a)
One oil container without drip tray was
observed at Portion A. A drip tray was provided for the oil container. This
observation was closed on 17 February 2015.
17 February 2015
(a) One
stockpile without cover was observed at WA3. The stockpile was covered. This
observation was closed on 24 February 2015.
(b) One
oil container without drip tray was observed at WA3. A drip tray was provided
for the oil container. This observation was closed on 24 February 2015.
(c) EP version
353/2009/G without update was observed at WA3. EP version 353/2009/G was
updated to 353/2009/H. This observation was closed on 24 February 2015
24 February 2015
(a) Accumulated
water was observed on the floor at Portion D. The Contractor was reminded to clean
the accumulated water. Follow-up actions for the outstanding observation will be
inspected during the next site inspection.
4.2 Advice
on the Solid and Liquid Waste Management Status
4.2.3 The
monthly summary of waste flow table is detailed in Appendix E.
4.2.4 The Contractor was reminded that chemical waste
containers should be properly treated and stored temporarily in designated
chemical waste storage area on site in accordance with the Code of Practice on
the Packing, Labelling and Storage of Chemical Waste.
4.3 Environmental
Licenses and Permits
4.3.1 The valid environmental licenses and permits during
the reporting period are summarized in Appendix F.
4.4
Implementation Status of Environmental Mitigation Measures
4.4.3 A summary of the implementation Schedule of Environmental Mitigation
Measures (EMIS) is presented in Appendix G. Most of the necessary
mitigation measures were implemented properly.
4.5 Summary of
Exceedance of the Environmental Quality Performance Limit
4.6 Summary of
Complaints, Notification of Summons and Successful Prosecution
5.1 Construction
Programme for the Coming Months
Table 5.1 Construction Activities for March 2015
Site Area |
Description of Activities |
Main Site |
Pre-Drilling Work |
Main Site |
Bored Piles Works |
Main Site |
Secondary site office erection |
Main Site |
Storm & Sewer Drain Works |
5.2
Environmental Site Inspection Schedule for the Coming Month
6 CONCLUSION.
6.1 Conclusions