1-2 |
|
1.1 |
Basic Project
Information |
1 |
1.2 |
Project Organization |
2 |
1.3 |
Construction Programme |
2 |
1.4 |
Construction Works Undertaken During
the Reporting Period |
2 |
|
|
|
2 |
3 |
|
2.1 |
Monitoring Locations |
3 |
2.2 |
Monitoring Requirements |
3 |
2.3 |
Monitoring Results |
3 |
|
|
|
3 |
4 |
|
3.1 |
Monitoring Locations |
4 |
3.2 |
Monitoring Requirements |
4 |
3.3 |
Monitoring Results |
4 |
|
|
|
4
|
5-6 |
|
4.1 |
Monitoring Locations |
5 |
4.2 |
Monitoring Requirements |
6 |
4.3 |
Monitoring Results
|
6 |
|
|
|
5
|
6-7 |
|
5.1 |
Monitoring Locations |
6-7 |
5.2 |
Monitoring Requirements |
7 |
5.3 |
Monitoring Results
|
7 |
|
|
|
6 |
8-10 |
|
6.1 |
Site Inspection |
8 |
6.2 |
Advice on the Solid and
Liquid Waste Management Status |
8-9 |
6.3 |
Environmental Licenses and Permits |
9 |
6.4 |
Implementation
Status of Environmental Mitigation Measures |
10 |
6.5 |
Summary of
Exceedance of the Environmental Quality Performance Limit |
10 |
6.6 |
Summary of
Complaints, Notification of Summons and Successful Prosecution |
10 |
|
|
|
7 |
11 |
|
7.1 |
Construction
Programme for the Coming Months |
11 |
7.2 |
Environmental Site Inspection Schedule
for the Coming Month |
11 |
|
|
|
8 |
11 |
|
8.1 |
Conclusions |
11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||||
|
||||||
Figure 1 |
Air Quality and Noise Monitoring Stations for HKBCF |
|
||||
Figure 2.1 |
Water Quality Monitoring Stations (construction phases) before 15 May 2017 |
|
||||
Figure 2.2 |
Water Quality Monitoring Stations (construction phases) after 15 May 2017 |
|
||||
Figure 3.1 |
Dolphin
Monitoring Transect Line and Layout Map before 15 May 2017 |
|
||||
Figure 3.2 |
Dolphin
Monitoring Transect Line and Layout Map after 15 May 2017 |
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
TABLE |
|
|
||||
Table 1.1 |
Contact Information of Key Personnel |
|
||||
Table 2.1 |
Air Quality Monitoring Locations |
|
||||
Table 2.2 |
Action and Limit Levels for 1-hour TSP |
|
||||
Table 2.3 |
Action and Limit Levels for 24-hour TSP |
|
||||
Table 3.1 |
Construction Noise Monitoring Locations |
|
||||
Table 3.2 |
Action and Limit Levels for Construction Noise |
|
||||
Table 4.1 |
Water Quality Monitoring Stations (construction phases) |
|
||||
Table 4.2 |
Action and Limit Levels for Water Quality |
|
||||
Table 5.1 |
New co-ordinates
of changed vessel-based transect lines |
|
||||
Table |
Action and Limit Levels for Chinese White Dolphin Monitoring ¡V
Approach to Define Action Level ( |
|
||||
Table 5.2b |
Action and Limit Levels for Chinese White Dolphin Monitoring - |
|
||||
Table 6.1 |
Summary of marine sediment disposed to dumping site via Contract No.
HY/2013/03 |
|
||||
Table 7.1 |
Construction Activities for coming month |
|
||||
|
|
|
||||
|
|
|
||||
|
|
|
||||
APPENDICES |
|
|||||
Location of Works Areas |
|
|||||
Project Organization for Environmental Works |
|
|||||
Construction Programme |
|
|||||
Event and Action Plan |
|
|||||
Monthly Summery of Waste Flow Table & Monthly Summery of Marine
Sediment |
|
|||||
Environmental Licenses and Permits |
|
|||||
Implementation Schedule for Environmental Mitigation Measures (EMIS) |
|
|||||
Statistics on Environmental Complaints, Notification of Summons and
Successful Prosecutions |
|
|||||
Environmental Site Inspection Schedule |
|
|||||
|
|
|
|
|||
|
|
This Monthly Environmental
Monitoring and Audit (EM&A) Report is
prepared for Contract HY/2013/02 ¡§Hong Kong¡VZhuhai-Macao Bridge Hong Kong
Boundary Crossing Facilities (HKBCF) ¡V Infrastructure Works Stage I (Western
Portion)¡¨ (hereafter referred to as ¡§the Contract¡¨) for the Highways Department
of Hong Kong Special Administrative Region (HKSAR). The Contract was awarded to
China Harbour Engineering Co., Ltd. (hereafter referred to as ¡§the Contractor¡¨)
and ETS-Testconsult Limited was appointed as the Environmental Team (ET) by the
Contractor.
The Contract is part of Hong Kong¡VZhuhai¡VMacao
Bridge HKBCF which is a ¡§Designated Project¡¨, under Schedule 2 of the
Environmental Impact Assessment Ordinance (EIAO) (Cap 499) and Environmental
Impact Assessment (EIA) Report (Register No. AEIAR-145/2009) was prepared for
the Project. The current Environmental Permit (EP) No.
EP-353/2009/K for HKBCF was issued on 11 April 2016. These documents are
available through the EIA Ordinance Register. Site preparation works of the
Contract was started on 25 July 2014 and the construction works of the Contract
commenced on 24 November 2014.
ETS-Testconsult Limited has been appointed by
the Contractor to implement the Environmental Monitoring & Audit (EM&A)
programme for the Contract in accordance with the Updated EM&A Manual for
HKBCF (Version 1.0) and provide environmental team services to the Contract.
This is the Thirtieth Monthly Environmental
Monitoring and Audit (EM&A) Report for the Contract which summaries
findings of the EM&A works conducted during the reporting
period from 01 May
to 31 May 2017.
Site Activities
As
informed by the Contractor, site
activities were carried out in
this reporting month:
¡±
Pier / Abutment in Portion C
& F;
¡±
Pre-bored H-pile for sign
gantries in Portion D;
¡±
Storm drain and water main
construction;
¡±
Retaining wall, slop and earth
works;
¡±
Footing construction of
directional signs, cable trench and ducting;
¡±
Marine
Delivery of precast segment &
Construction of bridge deck in Portion D, A, E, C & F
Environmental Monitoring and Audit Progress
The monthly EM&A programme was
undertaken in accordance with the Updated EM&A Manual for HKBCF (Version
1.0). It should be noted that the air quality and noise monitoring works for
the Contract are covered by Contract No. HY/2010/02 ¡§Hong Kong-Zhuhai-
Environmental Site Inspection:
04, 11, 18
& 25 May 2017
Breaches of
Action and Limit Levels
Summary of
Action and Limit Level exceedance of 1-hr TSP level and 24-hr TSP level at AMS6
shall be referred to the monthly EM&A report prepared by Contract No.
HY/2011/03.
There was no Action and Limit Level exceedance
of 1-hr TSP level and 24-hr TSP level
recorded at station AMS7 by the Environmental Team of Contract No. HY/2010/02 during the reporting period.
There was no Action and Limit Level exceedance
for noise recorded at
station NMS2 and station NMS3B by the Environmental Team of Contract No.
HY/2010/02 during the reporting period.
There was no Action and Limit Level exceedance
for water quality recorded
at the monitoring stations showed at Table 4.1 by the Environmental Team of Contract
No. HY/2010/02 during the reporting period.
Impact
dolphin monitoring results at all transects are reported in the EM&A Report
prepared for Contract No. HY/2010/02.
Complaint Log
There was no
complaint received in relation to the environmental impact during the reporting period.
Notifications of Summons and Successful
Prosecutions
There were no
notifications of summons or prosecutions received during the reporting period.
Reporting Change
There was a reporting change informed by the IEC/ENPO on 15 May 2017 via e-mail. Since several
water quality monitoring (WQM) stations for WQM and vessel-based transect lines
for dolphin monitoring being conducted by Contract No. HY/2010/02 under the
EM&A Programme for the HZMB HKBCF Project has been occupied by the marine
works of a designated project - Expansion of Hong Kong International Airport
into a Three-Runway System (3RS Project).
As such, proposal for
changes to the EM&A Programme was justified and verified by the ET
Leader for Contract No. HY/2010/02 and the IEC respectively on 24 March
2017, and it was approved by EPD on 12 May 2017.
Future
Key Issues
The future key
issues to be undertaken in the upcoming month are as follows:
¡±
Pier / Abutment in Portion C
& F;
¡±
Storm drain and water main
construction;
¡±
Retaining wall, slop and earth
works
¡±
Footing construction of
directional signs, cable trench and ducting;
¡±
Marine
Delivery of precast segment &
Construction of bridge deck in Portion D, A, E, C & F
¡±
Marine sediment excavation activities from the land-based works and corresponding disposal at the designated disposal sites
1.
INTRODUCTION
1.1.
Basic Project Information
1.1.1.
This Monthly Environmental
Monitoring and Audit (EM&A) Report is
prepared for Contract HY/2013/02 ¡§Hong Kong¡VZhuhai-Macao Bridge Hong Kong
Boundary Crossing Facilities (HKBCF) ¡V Infrastructure Works Stage I (Western
Portion)¡¨ (hereafter referred to as ¡§the Contract¡¨) for the Highways Department
of Hong Kong Special Administrative Region (HKSAR). The Contract was awarded to
China Harbour Engineering Co., Ltd. (hereafter referred to as ¡§the Contractor¡¨)
and ETS-Testconsult Limited was appointed as the Environmental Team (ET) by the
Contractor.
1.1.2.
The Contract is part of
Hong Kong¡VZhuhai¡VMacao Bridge HKBCF which is a ¡§Designated Project¡¨, under
Schedule 2 of the Environmental Impact Assessment Ordinance (EIAO) (Cap 499)
and Environmental Impact Assessment (EIA) Report (Register No. AEIAR-145/2009)
was prepared for the Project. The current Environmental Permit (EP) No. EP-353/2009/K for HKBCF was issued on 11 April 2016.
These documents are available through the EIA Ordinance Register. Site
preparation works of the Contract started on 25 July 2014 and the construction
works of the Contract commenced on 24 November 2014. The works area of the
Contract is shown in Appendix A.
1.1.3.
The proposed works under this
Contract comprise the following:
¡±
Construction of the viaducts
and roads at the western portion of Hong Kong Boundary Crossing Facilities
(HKBCF) mainly for connection with the Hong Kong¡VZhuhai¡VMacao Bridge (HZMB), Hong Kong Link Road (HKLR), Hong Kong International
Airport (HKIA) and the Tuen Mun-Chek Lap Kok Link (TM-CLKL);
¡±
Construction of the road modification at the SkyCity Interchange
at
¡±
Construction of associated street lighting, street
furniture, road marking, road signage, drainage, sewerage, fresh water and
flushing water supply, irrigation, landscape, electrical and mechanical
(E&M), utilities and services works;
¡±
Provisioning of civil engineering works and power supply
installation for the Traffic Control and Surveillance System TCSS;
¡±
Other works in accordance with the
Contract.
1.1.4.
This is the Thirtieth Monthly Environmental Monitoring and
Audit (EM&A) Report for the Contract which summaries the audit findings of
the EM&A programme during the reporting period from 01 May to 31 May 2017.
1.2.
Project Organization
1.2.1.
The project organization structure and
lines of communication with respect to the on-site environmental management
structure is shown in Appendix B.
The key personnel contact names and numbers are summarized in Table 1.1.
Table 1.1 Contact Information of Key Personnel
Party |
Position |
Name of Key Staff |
Tel. No. |
Fax No. |
Engineer or Engineer¡¦s
Representative (AECOM Asia Co. Ltd.) |
Resident
Engineer |
Mr. Winston Wong |
6330 8293 |
3152
5116 |
Environmental Project Office
/ Independent Environmental Checker (Ramboll Environ Hong Kong
Limited) |
Environmental
Project Office Leader |
Mr. Y. H. Hui |
3465
2888 |
3465
2899 |
Independent
Environmental Checker |
Mr.
Raymond Dai |
3465
2888 |
3465
2899 |
|
Environmental
Site Supervisor |
Mr.
Ray Yan |
5181
8165 |
3465
2899 |
|
Contractor (China
Harbour Engineering Co., Ltd.) |
Environmental
Officer |
Mr.
Richard Ng |
5977
0593 |
3915
0300 |
Environmental
Officer |
Mr.
Paper Chan |
6486
8967 |
3915
0300 |
|
Environmental
Supervisor |
Mr.
Endy Tse |
5512
2662 |
3915
0300 |
|
Environmental Team (ETS-Testconsult Ltd.) |
Environmental Team Leader |
Mr. C. L. Lau |
2946 7791 |
2695 3944 |
1.3.
Construction Programme
1.3.1. A
copy of the Contractor¡¦s construction programme is provided in Appendix C.
1.4.
Construction Works Undertaken During the Reporting Period
1.4.1.
A summary of the
construction activities undertaken during this reporting period is shown below:
¡±
Pier / Abutment in Portion C
& F;
¡±
Pre-bored H-pile for sign
gantries in Portion C & F;
¡±
Storm drain and water main
construction;
¡±
Retaining wall, slop and earth
works;
¡±
Footing construction of
directional signs, cable trench and ducting;
¡±
Marine
Delivery of precast segment &
Construction of bridge deck in Portion D, A, E, C & F
2.1.
Monitoring Locations
2.1.1.
The air quality monitoring works
for the Contract are covered by Contract No. HY/2010/02 Hong Kong-Zhuhai-
Table 2.1 Air Quality Monitoring Locations
Identification No. |
Location Description |
AMS6(1) |
Dragonair / CNAC (Group) Building |
AMS7(1) (2) |
Hong Kong SkyCity Marriott Hotel |
Remarks: |
(1)
The ET of this Contract should conduct impact air quality
monitoring at the AMS listed in the table as part of EM&A programme according
to latest notification from ENPO when the monitoring station(s) is/are no
longer covered by another ET of the HZMB project. |
(2)
The air quality monitoring location
AMS of
the updated EM&A Manual started from January 2016. |
2.2.
Monitoring Requirements
2.2.1.
The monitoring requirements, monitoring
equipment, monitoring parameters, frequency and duration, monitoring
methodology, monitoring schedule, meteorological information are detailed in
the monthly EM&A Reports prepared for Contract Nos. HY/2010/02 and
HY/2011/03.
2.2.2.
The Action
and Limit Levels for 1-hr TSP and 24-hr TSP are provided in Table 2.2 and Table
2.3 respectively. The Action and Limit Levels of AMS7 are as same as its
original levels and AMS
Table 2.2 Action and Limit Levels for 1-hour TSP
Monitoring Station |
Action Level,mg/m3 |
Limit Level,mg/m3 |
AMS6 ¡V Dragnair / SNAC (Group) Building (HKIA) |
360 |
500 |
AMS7 ¡V Hong Kong SkyCity Marriott Hotel |
370 |
500 |
Table 2.3 Action and Limit Levels for 24-hour TSP
Monitoring Station |
Action Level,mg/m3 |
Limit Level,mg/m3 |
AMS6 ¡V Dragnair / SNAC (Group) Building (HKIA) |
173 |
260 |
AMS7 ¡V Hong Kong SkyCity Marriott Hotel |
183 |
260 |
2.2.3.
The event and
action plan is provided in Appendix D.
2.2.4.
If
exceedance(s) at these stations is/are recorded by the ET of the Contract or
referred by the other ET under the HZMB project to the Contract, the ET of the
Contract will carry out an investigation and findings will be reported in the
monthly EM&A Report.
2.3.
Monitoring Results
2.3.1.
The monitoring
results for AMS6 and AMS7 are reported in the monthly EM&A Reports prepared
for Contract Nos. HY/2011/03 and HY/2010/02 respectively.
2.3.2.
Summary of Action and
Limit Level exceedance of 1-hr TSP level and 24-hr TSP level at AMS6 shall be
referred to the monthly EM&A report prepared by Contract No. HY/2011/03.
2.3.3.
There was no
Action and Limit Level
exceedance of 1-hr TSP level and 24-hr TSP
level recorded at station AMS7 by the Environmental Team of Contract
No. HY/2010/02 during the reporting period.
3.1.
Monitoring
Locations
3.1.1. The noise monitoring works for the Contract are covered by Contract
No. HY/2010/02 Hong Kong-Zhuhai-
Table 3.1 Construction Noise Monitoring Locations
Identification No. |
Location Description |
|
NMS2(1) |
Sea |
|
NMS3B(1) (2) |
Site Boundary of
Site Office Area at Works Area WA2 |
|
Remarks: |
||
(1)
The ET of this Contract should conduct impact noise monitoring
at the NMS listed in the table as part of EM&A programme according to
latest notification from ENPO when the monitoring station(s) is/are no longer
covered by another ET of the HZMB project. |
||
(2)
The Action and Limit Levels for schools will be applied for this
alternative monitoring location. |
3.2.
Monitoring Requirements
3.2.1.
The monitoring
requirements, monitoring equipment, monitoring parameters, frequency and
duration, monitoring methodology, monitoring schedule, meteorological
information are detailed in the monthly EM&A Reports prepared for Contract
No. HY/2010/02.
3.2.2.
The Action and Limit Levels for construction noise are provided in Table 3.2
3.2.3.
The event and action plan is provided in Appendix D.
Table
3.2
Action and Limit Levels for
Construction Noise
Parameter |
Action
Level |
Limit Level |
|
07:00 ¡V 19:00 hours on normal weekdays |
When one documented complaint is received |
75 dB(A)* |
|
Notes: |
|
||
If works are to be carried out during restricted hours, the conditions stipulated in the construction noise permit issued by the Noise Control Authority have to be followed. |
|
||
* Reduce
to 70
dB(A) for schools and 65 dB(A) during school examination period. |
|
||
3.2.4.
If exceedance(s) at these stations
is/are recorded by the ET of the Contract or referred by the other ET under the
HZMB project to the Contract, the ET of the Contract will carry out an
investigation and findings will be reported in the monthly EM&A Report.
3.3.
Monitoring
Results
3.3.1
The monitoring
results for NMS2 and NMS3B are reported in the monthly EM&A Reports
prepared for Contract No. HY/2010/02.
There was no exceedance for noise recorded
at station NMS2 and station NMS3B by the Environmental Team of Contract No.
HY/2010/02 during the reporting period.
4.1.
Monitoring
Locations
The water monitoring works for the Contract are
covered by Contract No. HY/2010/02 Hong Kong-Zhuhai-
Table 4.1 Water Quality Monitoring Stations
(construction phases)
Station |
Description |
East |
North |
IS5 |
Impact Station (Close to HKBCF
construction site) |
811579 |
817106 |
IS(Mf)6 |
Impact Station (Close to HKBCF
construction site) |
812101 |
817873 |
IS7 |
Impact Station (Close to HKBCF
construction site) |
812244 |
818777 |
IS8 |
Impact Station (Close to HKBCF
construction site) |
814251 |
818412 |
IS(Mf)9 |
Impact Station (Close to HKBCF
construction site) |
813273 |
818850 |
IS10 |
Impact Station (Close to HKBCF
construction site) |
812577 |
820670 |
IS10(N)[3] |
Impact
Station (Close to HKBCF construction site) |
812942 |
820881 |
IS(Mf)11 |
Impact Station (Close to HKBCF
construction site) |
813562 |
820716 |
IS(Mf)16 |
Impact Station (Close to HKBCF
construction site) |
814328 |
819497 |
IS17 |
Impact Station (Close to HKBCF
construction site) |
814539 |
820391 |
SR3 |
Sensitive receivers (San Tau SSSI) |
810525 |
816456 |
SR4(N) |
Sensitive receivers (Tai Ho) |
814705 |
817859 |
SR5 |
Sensitive receivers (Artificial Reef in
NE Airport) |
811489 |
820455 |
SR5(N)[3] |
Sensitive
receiver (Artificial Reef in NE Airport) |
812569 |
821475 |
SR6 |
Sensitive receivers (Sha Chau and |
805837 |
821818 |
SR7 |
Sensitive receivers (Tai Mo Do) |
814293 |
821431 |
SR |
Sensitive receivers (Ma Wan FCZ)1 |
823741 |
823495 |
SR10B(N)[1] |
Sensitive receivers (Ma Wan FCZ)2 |
823683 |
823187 |
CS(Mf)3 |
Control Station |
809989 |
821117 |
CS(Mf)3(N)[3] |
Control
Station |
808814 |
822355 |
CS(Mf)5 |
Control Station |
817990 |
821129 |
CS4 |
Control Station |
810025 |
824004 |
CS6 |
Control Station |
817028 |
823992 |
CSA [2] |
Control Station |
818103 |
823064 |
Note: |
|||
(1)
Additional
monitoring station for Ma Wan FCZ. |
|||
(2)
Additional
control monitoring station for Ma Wan FCZ |
|||
(3)
Alternative
WQM Stations with effect from 15
May 2017 |
|||
Remarks: |
|||
The ET of this
Contract should conduct impact water quality monitoring at the WQMS listed in
the table as part of EM&A programme according to latest notification from
ENPO when the monitoring station(s) is/are no longer covered by another ET of
the HZMB project. The ET of the
Contract shall communicate and share the monitoring data to the ET(s) of
other works contracts if the water quality monitoring station(s) is/are as
part of EM&A programme. |
4.2
Monitoring
Requirements
The
monitoring requirements, monitoring equipment, monitoring parameters, frequency
and duration, monitoring methodology, monitoring schedule, meteorological
information are detailed in the monthly EM&A Reports prepared for Contract
No. HY/2010/02.
4.2.1
The event and
action plan is provided in Appendix D.
4.2.2
The Action and Limit Levels for Water Quality are provided in Table 4.2
Table 4.2 Action and Limit Levels
for Water Quality
|
Parameters |
Action |
Limit |
|
DO in mg/L (Surface, Middle & Bottom) |
Surface and Middle 5.0 Bottom 4.7 |
Surface and Middle 4.2 (except 5 mg/L for FCZ) Bottom 3.6 |
|
SS in mg/L (depth-averaged) at all monitoring stations and control
stations |
23.5 and 120% of upstream control station's SS at the same tide of the
same day* |
34.4 and 130% of upstream control station's SS at the same tide of the
same day and 10mg/L for WSD Seawater intakes* |
|
Turbidity in NTU (depth-averaged) |
27.5 and 120% of upstream control station's turbidity at the same tide
of the same day* |
47.0 and 130% of upstream control station's turbidity at the same tide
of the same day* |
* Remarks: Reference is made to EPD approval of adjustment of water
quality assessment criteria issued and became effective on 18 February 2013. |
|||
Notes: 1. "depth-averaged" is
calculated by taking the arithmetic means of reading of all three depths. |
|||
2. For DO, non-compliance of the water quality
limits occurs when monitoring result is lower than the limits. |
|||
3. For turbidity, SS, non-compliance of the water quality limits occurs
when monitoring result is higher than the limits. |
|||
4. All the figures given in the table are used for
reference only and the EPD may amend the figures whenever it is considered as
necessary. |
|||
5. The 1%-ile of baseline data for dissolved oxygen
(surface and middle) and dissolved oxygen (bottom) are 4.2mg/L and 3.6mg/L
respectively. |
|||
4.2.3
If exceedance(s) at these stations
is/are recorded by the ET of the Contract or referred by the other ET under the
HZMB project to the Contract, the ET of the Contract will carry out an
investigation and findings will be reported in the monthly EM&A Report.
4.3
Monitoring Result
4.3.1
The monitoring results for the monitoring
stations showed in Table 4.1 are reported in the monthly EM&A Report
prepared for Contract No. HY/2010/02. There was no Action and Limit Level exceedance recorded by the
Environmental Team of Contract No. HY/2010/02 during the reporting period.
5.
DOLPHIN MONITORING
5.1.
Monitoring Locations
The
dolphin monitoring works for
the Contract are covered by Contract No. HY/2010/02 Hong Kong-Zhuhai-
Remarks:
The ET of this Contract should conduct impact dolphin
monitoring as part of EM&A programme according to latest notification from
ENPO when the monitoring transect(s) is/are no longer covered by another ET of
the HZMB project.
Table 5.1 New co-ordinates of changed vessel-based transect
lines
Line No. |
Easting |
Northing |
|
2 |
Start Point |
805476 |
820800 |
End Point |
805476 |
826654 |
|
3 |
Start Point |
806464 |
821150 |
End Point |
806464 |
822911 |
|
4 |
Start Point |
807518 |
821500 |
End Point |
807518 |
829230 |
|
5 |
Start Point |
808504 |
821850 |
End Point |
808504 |
828602 |
|
6 |
Start Point |
809490 |
822150 |
End Point |
809490 |
825352 |
|
7 |
Start Point |
810499 |
822000 |
End Point |
810499 |
824613 |
|
24 |
Start Point |
805476 |
815900 |
End Point |
805476 |
819100 |
|
Remarks:
Line No. 24 is a new vessel-based transect line for dolphin monitoring. |
5.2.
Monitoring Requirements
The
monitoring requirements, monitoring equipment, monitoring parameters, frequency
and duration, monitoring methodology, monitoring schedule, meteorological
information are detailed in the monthly EM&A Reports prepared for Contract
No. HY/2010/02.
5.2.1.
The event and
action plan is provided in Appendix D.
5.2.2.
The Action and Limit Levels for Chinese White Dolphin Monitoring are provided in Table
Table
Define
Action Level (
|
|
|
NEL |
NWL |
|
Action Level |
(STG < 70% of baseline) & (ANI < 70% of baseline) |
(STG < 70% of baseline) & (ANI < 70% of baseline) |
Limit Level |
[(STG < 40% of baseline) & (ANI < 40% of baseline)] AND [(STG < 40% of baseline) & (ANI < 40% of baseline)] |
For North Lantau Social Cluster, action level
will be trigger if either NEL or NWL fall below the criteria; limit level will
be triggered if both NEL and NWL fall below the criteria.
Table 5.2b Derived Value of
Action Level (
Dolphin
Monitoring
|
|
|
NEL |
NWL |
|
Action Level |
(STG < 4.2) & (ANI < 15.5) |
(STG < 6.9) & (ANI < 31.3) |
Limit Level |
[(STG < 2.4) & (ANI < 8.9)] AND [(STG
< 3.9) & (ANI < 17.9)] |
5.2.3.
If exceedance(s) at these transects is/are recorded by the ET of the Contract or referred by the other ET
under the HZMB project to the Contract, the ET of the Contract will carry out
an investigation and findings will be reported in the monthly EM&A Report.
5.3
Monitoring Result
The dolphin survey results for all transects are reported in the monthly
EM&A Reports prepared for Contract No. HY/2010/02.
6.
ENVIRONMENTAL SITE INSPECTION AND AUDIT
6.1
Site Inspection
6.1.1
Site Inspections
were carried out on a weekly basis to monitor the implementation of proper
environmental pollution control mitigation measures for the project. During the
reporting period, site inspections were carried out on 04, 11, 18 & 25 May
2017.
6.1.2
Particular observations during the site inspections are described
below:
27 April 2017
(a)
Improper disposal of general refuse was observed at Portion C. The general refuse was collected at Portion C. The observation was closed on 04 May 2017.
04 May 2017
(a)
Improper disposal of general
refuse was observed at Portion C. The general refuse was
collected. The observation was closed
on 11 May 2017.
(b)
Oil containers without drip tray were observed at Portion D. Oil
containers were removed at Portion D. The observation was closed on 11
May 2017.
(c)
Improper
disposal of oil containers were observed at Portion D. Oil
containers were removed at Portion D. The observation was closed
on 11 May 2017.
11 May 2017
(a)
Improper disposal of general refuse was observed at Portion D. The general refuse
was collected at Portion D. The observation was closed on 18 May 2017.
18 May 2017
(a)
Improper disposal of general refuse
was observed at Portion F. The general refuse was removed at Portion F. The
observation was closed on 25 May 2017.
(b)
Oil containers without drip tray were observed at Portion F. Oil
containers were removed at Portion
F. The observation was closed on 25 May 2017.
25 May 2017
(a)
General refuse was observed to be discarded improperly at Portion C. Follow-actions
for outstanding observation will be inspected during the next site inspection.
(b)
General refuse mixed with C & D
waste was observed at Portion C. Follow-actions for outstanding observation
will be inspected during the next site inspection.
(c)
The NRMM label of a generator was
observed too small at Portion C. Follow-actions for outstanding observation
will be inspected during the next site inspection.
6.2
Advice on the Solid and
Liquid Waste Management Status
6.2.1
The Contractor registered as a chemical waste producer for the
Contract. Sufficient numbers of receptacles were available for general refuse
collection and sorting.
6.2.2
There was no excavated marine sediment generated in this reporting period. The excavated marine sediment was stored properly on
site during this reporting period until further instruction by the Engineer.
The disposal of excavated sediment as per EP-353/2009/K to be implemented subject
to confirmation.
6.2.3
Disposal of Marine
Sediment
6.2.3.1 For the marine
sediment disposal, after the acceptance of the review of the approved Sediment
Quality Report (SQR) for this Project under EPD letter dated 19 August 2015, an
approval to dispose the marine sediment extracted from bored piling for this
Project was then approved under memo from Secretary, Marine Fill Committee of
CEDD dated 20 August 2015 for the disposal of marine sediment extracted from
bored piling works. The disposal sites allocated to this Project are the Mud
Pit CMP2 of the Confined Marine Sediment Disposal Facility to the South of The
Brothers (or at the East of Sha Chau). As advised by CEDD in the memo dated 19
February 2016, from 00:00 on 22 March 2016 onward, the disposal space at CMP2
of the South of The Brothers is closed and all disposal of contaminated
sediment is to be carried out at CMP Vd to the East of Sha Chau (ESC). As a
practical means, the disposal operation is managed by one contractor who is
also responsible for applying dumping permit and its subsequent extension
applications from EPD. Contract No. HY/2013/03 has been assigned to coordinate
and arrange for disposal of extracted marine sediment from Contract No.
HY/2013/02, HY/2013/03 and HY/2013/04.
6.2.3.2 For the dumping
arrangement, the barge for disposal of marine sediment will moor at the
temporary loading and unloading at the east shore of the
6.2.3.3
During dumping, HY/2013/02 is responsible for
transporting the marine sediment from his site area to the barge by Land
transportation. The estimated quantity of marine sediment in each truck is
confirmed by Resident Site Staff of each Contract.
The trip tickets for transportation and disposal of marine sediment are
collected and checked. Contract No. HY/2013/03 as the dumping permit holder is
responsible for reporting to EPD the quantity disposed of as the condition
stipulated in the dumping permit.
6.2.4
There was no marine sediment
extracted from bored piling in this Contract disposed to allocated dumping site
via Contract No. HY/2013/
Table 6.1 Summary of
marine sediment disposed to dumping site via Contract No.
HY/2013/03
Month/Year |
Quantity disposed (m3) |
January
2016 |
1272 |
February 2016 |
2816 |
March
2016 |
600 |
April
2016 |
5128 |
May
2016 |
0 |
June
2016 |
1200 |
July
2016 |
728 |
August
2016 |
1784 |
September
2016 |
2328 |
October
2016 |
1096 |
November
2016 |
0 |
December
2016 |
1568 |
January
2017 |
0 |
February
2017 |
88 |
March
2017 |
0 |
April
2017 |
624 |
May
2017 |
0 |
Total = |
19232 |
6.2.5
The Contractor shall ensure no spilling and
overflowing of materials during loading / unloading / transportation is
allowed.
6.2.6
The monthly summary of waste flow table is detailed in Appendix E.
6.2.7
The Contractor was reminded that chemical waste containers should be
properly treated and stored temporarily in designated chemical waste storage
area on site in accordance with the Code of Practice on the Packing, Labelling
and Storage of Chemical Waste.
6.3
Environmental Licenses
and Permits
The valid environmental licenses and permits during
the reporting period are summarized in Appendix F.
6.4
Implementation Status of Environmental Mitigation
Measures
6.4.1
In response to the site audit findings, the Contractor carried out
corrective actions.
6.4.2
The Contractor waters 8 times per day on all exposed soil within the
project site and associated works areas when construction activities are being
undertaken.
6.4.3
The Contractor was reminded to provide
well-maintained plant operated on-site and plant served regularly;
6.4.4
The Contractor was reminded to switch
off vehicles and equipment while not in use;
6.4.5
The Contractor was reminded to
schedule the construction works to minimize noise nuisance etc.
6.4.6
The
implementation status of Regular Marine Travel Route Plan (RMTRP) was checked
by ET. Training material
of Regular Marine Travel Route Plan was prepared and given to relevant staff.
Those records were kept properly. Since the marine delivery of precast segments
was commenced and the RMTRP training was provided for the Captain on 21 July 2016, the Captain was reminded to use regular travel routes
in order to minimize the chance of vessel collision and the routes would not go through the
dolphin hotspot in
6.4.7
The tool box training of dolphin was carried out in Dec 2015. According
to the action plan and communication flow chart of dolphin instruction, if any
dolphin intruded BCF perimeter silt curtain, ETL should be informed. There was
no notification received on any dolphin intrusion during the reporting period.
6.4.8
A summary of the implementation Schedule of Environmental Mitigation
Measures (EMIS) is presented in Appendix G. Most of the necessary
mitigation measures were implemented properly.
6.5
Summary of Exceedance of
the Environmental Quality Performance Limit
6.5.1
Summary of Action and
Limit Level exceedance of 1-hr TSP level and 24-hr TSP level at AMS6 shall be
referred to the monthly EM&A report prepared by Contract No. HY/2011/03.
6.5.2
There was no
Action and Limit Level
exceedance of 1-hr TSP level and 24-hr TSP
level recorded at station AMS7 by the Environmental Team of Contract
No. HY/2010/02 during the reporting period.
6.5.3
There was no
Action and Limit Level
exceedance for noise recorded
at station NMS2 and station NMS3B by the Environmental Team of Contract No.
HY/2010/02 during the reporting period.
6.5.4
There was no
Action and Limit Level
exceedance for water quality recorded
at the monitoring stations showed at Table 4.1 by
the Environmental Team of Contract No. HY/2010/02 during the reporting period.
6.5.5
Impact
dolphin monitoring results at all transects are reported in the EM&A Reports prepared for Contract
No. HY/2010/02.
6.6
Summary of Complaints,
Notification of Summons and Successful Prosecution
6.6.1
There were no complaints
received during the reporting period.
6.6.2
There were no notifications of summons or
prosecutions received during the reporting period.
6.6.3
Statistics on environmental complaints,
notifications of summons and successful prosecutions are summarized in Appendix H.
7.1
Construction Programme
for the Coming Months
7.1.1
As informed by the Contractor, the major construction activities
for June 2017 are summarized in Table 7.1.
Table 7.1 Construction Activities
for Coming Month
Site Area |
Description of Activities |
Portion
C & F |
Pier / Abutment |
Portion
D, A, E, C & F |
Marine delivery of precast segment
& Construction of bridge deck |
|
Storm drain and water main construction |
|
Retaining wall, slop and earth works |
|
Footing construction of directional
signs, cable trench and ducting |
|
Marine sediment
excavation activities from the land-based works and corresponding disposal at the
designated disposal sites |
7.2
Environmental Site
Inspection Schedule for the Coming Month
7.2.1
The tentative schedule for weekly site inspections for June 2017 is
provided in Appendix I.
8.1
Conclusions
8.1.1
The site preparation work of the Contract was started on 25 July 2014 and
the construction works of the Contract commenced on 24 November 2014.
8.1.2
Summary of Action and
Limit Level exceedance of 1-hr TSP level and 24-hr TSP level at AMS6 shall be
referred to the monthly EM&A report prepared by Contract No. HY/2011/03.
8.1.3
There was no
Action and Limit Level
exceedance of 1-hr TSP level and 24-hr TSP
level recorded at station AMS7 by the Environmental Team of Contract
No. HY/2010/02 during the reporting period.
8.1.4
There was no Action and Limit Level exceedance
for noise recorded at
station NMS2 and station NMS3B by the Environmental Team of Contract No.
HY/2010/02 during the reporting period.
8.1.5
There was no
Action and Limit Level
exceedance for water quality recorded
at the monitoring stations showed at Table 4.1 by
the Environmental Team of Contract No. HY/2010/02 during the reporting period.
8.1.6
Impact
dolphin monitoring results at all transects are reported in the EM&A Reports prepared for Contract
No. HY/2010/02.
8.1.7
There were no complaints
received during the reporting period.
8.1.8
There were no notifications of summons or
prosecutions received during the
reporting period.
- END OF REPORT -